Seonakdong river consists of stagnant sections whose flowrate is controlled by the Daejeo and Noksan gates. As a result, there is not a minimum flow during normal times. The Daejeo and Noksan gates are located at the upstream head and the downstream end of Seonakdong river, respectively. Seonakdong river is an estuarine tributary of Nakdong river, which is a reservoir-like river used for agricultural irrigation, with the gate at the estuary of the river to prevent the intrusion of saline. Since the construction of the water gates, the water quality of the river has become degraded. This could also be due to the internal loading of pollutants, especially nutrients, from the sediments of the river because of the elongated detention time by the water gates. This study was thus conducted for the purpose of evaluating the current hydrologic-cycle system and providing measures for the rehabilitation of the hydrologic cycle. In this research, the daily outflow in Seonakdong River was simulated using the SWAT and SWMM models, and the water quality concentration including BOD, SS, TN, and TP were analyzed. The possibility of the application of SWAT-SWMM hybrid simulation was determined through the verification of both models. The error analysis shows that the results of both SWAT and SWAT-SWMM simulations make good agreements with those of field observations. For the single simulation results of SWAT, $R^{2}$ and NSE are 0.758, 0.511, respectively. For the hybrid simulation results of SWAT-SWMM, those are 0.880, 0.452, which means that the hybrid simulation can give more accurate results for the watershed where both the agricultural and urban areas exist.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.24
no.1
/
pp.19-26
/
2006
Andong and Imha reservoir adjoins each other, but turbid water shows too much different when it rains. The characteristics of geological rock in basin and agricultural area around river boundary are pointed out as the major reason of turbid water of Imha reservoir. This study analyzed rock type of topsoil layer using soil map by National Institute of Agricultural Science and Technology (NIAST). Among rock types, sedimentary rock affects on the occurrence of turbid water. In the analysis of sedimentary rock type, the distribution of sedimentary rock of Imha basin shows 1.87 times higher than that of Andong basin. Also, the distribution of sedimentary rock of Imha basin shows higher than that of Andong basin within 1,600m from river channel in according to the buffer zone of river boundary. And Agricultural area of Imha basin shows higher than that of Andong basin in analysis of land cover within 1,600 m from river channel. As this agricultural characteristics of Imha basin, cover management factor of Imha basin represents more higher that that of Andong basin.
Amplified fragment length polymorphism (AFLPs) markers were used to investigate the genetic variation in six autochthonous goat populations distributed in the middle and lower Yangtze River valley. The goat populations were Chengdu Grey Goat (CGG), Chuandong White Goat (CWG), Banjiao Goat (BG), Matou Goat (MG), Hui Goat (HG) and Yangtze River Delta White Goat (YRDWG). A total of 180 individuals (30 per population) were analysed using ten selected AFLP primer combinations that produced 78 clear polymorphism loci. The variability at AFLP loci was largely maintained within populations, as indicated by the average genetic similarity, and they were ranged from 0.745 to 0.758 within populations and 0.951 to 0.970 between populations. No breed specific markers were identified. Cluster analysis based on Nei' genetic distance between populations indicated that Chengdu Grey Goat is the most distant population, while CWG and YROWG were the closest populations, followed by BG, HG and MG. Genetic diversity of the goat populations didn' confirm what was expected on the basis of their geographical location, which may reflect undocumented migrations and gene flows and identify an original genetic resource.
Magazine of the Korean Society of Agricultural Engineers
/
v.42
no.1
/
pp.57-65
/
2000
The objective of this paper are to present a realistic methodology to estimate the daily water supply rates form irrigation pumping stattions, to validate it with the field data, and to report the daily irrigation pumping rates from the Han river basin. Five-year historical pumping records were collected from seventy-three pumping stations in the Han river basin. And the daily pumping rates were estimated from the electrical consumption records. The pumping patterns from the stations were analyzed and the results were applied to ungauged pumping stations in the basin. The method was appliedto five stations which were field monitored during the irragation periods in 1998. The relative errors between the observed and simulated water pumpage ranged from 1.4 to 7.0 percent. This indicates that the proposed method is valid to apply for estimating the pumping rates for agricultural lands. During 1993 to 1997, the annual average water pumpaging from the Han river and the tributaries were 350 million cubic meter. The annual water supply from the pumping stations varied from 973 to 1.377 mm in depth and the mean was 1,170 mm. The major factor affecting the annual variations was attributed to the rainfall during the growing seasons.
Journal of The Korean Society of Agricultural Engineers
/
v.54
no.3
/
pp.103-111
/
2012
Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.
Kim, Jin-Ho;Lee, Jong-Sik;Kim, Won-Il;Jung, Goo-Bok;Yun, Sun-Gang;Kwun, Soon-Kuk
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2002.10a
/
pp.469-472
/
2002
This study was conducted to show how to manage the water quality of Kyung-an river. The water quality and hydrologic data were obtained at the main river and branch streams in Marc $h{\sim}April$ 1998. First of all, we surveyed the contribution of branches for the pollution of water quality at Kyung-an river. It was in order of Kongiam(25.5%)>Yong-in Pollutant Treatment Complex (15.26%)^gt;Shin-won(13.99%)>Buen(11.86%)>Yangji(8.68%)>Yooun(7.43%)>Kwang-ju Pollution Treatment Complex(5.50%)>Osan(5.04%). The hydrological model using mass balance and BOD reduction formula suggested that if the quality of water Yoo-un and Shinn-won stream (branch streams of Kyung-an River) which is lowest in the basin is controlled adequately and outlet water from Yong-in pollutant treatment complex is adequately treated, the quality of Kyung-an river will be improved by 90% compared to current level.
Magazine of the Korean Society of Agricultural Engineers
/
v.41
no.5
/
pp.68-76
/
1999
The purpose of the study was to investigated the change of hydraulic characteristics like water surface profile and rivered section in the down stream of Keum river after the construction of esturary dam. The effect of esturary dam on the flood control in the Keum river was recognized with the data of two flood events happened in July, 1987 before the construction and in August, 1995 after the construction of estuary dam. For example , duration time above the water level of the warning -flood was changed from 46.5 to 42.8 hours and duration time above the eater level of the danger-flood was changed from 24.7 to 19.8 hours at the Kyuam station. The time difference to reach the water level of the designated -flood between Kyuam and Kangkyung was changed from 3 hours in 1987 to 12 hours and 20 minutes in 1995. The water surface slope of river decreased 25.6% between estuary dam and Kangkyung and increased 16.5% between Kangkyung and Kyuam, and decreased 8.8% between Kyuam and Kongju. As the result, velocity was getting faster and river bed was scoured in the reach of Kangkyung and Kyuam, and velocity was getting slower and river bed was sedimented in the reach of Kangkyung and estury dam.
Magazine of the Korean Society of Agricultural Engineers
/
v.22
no.4
/
pp.96-107
/
1980
This study is carried out to estimate the rate of sediment transportation both to measure the amount of suspended and bedload sediment that moves on or near the river bed and passes through the cross section of a river in unit time, with suspended and bed load samplers used for the Milyang river and to determine the most satisfactory and convenient formula of some formulas for sediment discharge by comparing the measured rate with the calculated rate. The results of this study are summarized as follows; 1) The interrelationship (1) between the total discharge and the total sediment discharge (2) between discharge and suspended sediment load and (3) between discharge and bed load in the Milyang river are (1) i) 4$\leq$Q$\leq$100 C.M.S. Qr=0. 00272 Q0.70 (kg/sec) ii) 150$\leq$Q$\leq$800 C.M.S. Qr=0. 4807 Q0.46 (kg/sec) (2) Qs~=0. 07576 Q1.02 (kg/sec) (3) QB=0. 00957 Q0.44 (kg/sec) 2) The rate of suspended sediment load to total sediment discharge is found to be about; 99%. The suspended load is shown to be almost wash load which consists of silt and clay. 3) The relation between the total discharge and the suspended sediment load that are measured at three medium and small rivers in Korea is Qs=0. 13831 Q0.97 (kg/sec) 4) Brown's formula is determined to be the most convenient formula for application and comparison with observed data obtained for the Milyang river.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.