• Title/Summary/Keyword: A-Pillar

Search Result 551, Processing Time 0.031 seconds

Optimization of 4H-SiC Superjunction Accumulation MOSFETs by Adjustment of the Thickness and Doping Level of the p-Pillar Region (p-Pillar 영역의 두께와 농도에 따른 4H-SiC 기반 Superjunction Accumulation MOSFET 소자 구조의 최적화)

  • Jeong, Young-Seok;Koo, Sang-Mo
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.30 no.6
    • /
    • pp.345-348
    • /
    • 2017
  • In this work, static characteristics of 4H-SiC SJ-ACCUFETs were obtained by adjusting the p-pillar region. The structure of this SJ-ACCUFET was designed by using a two-dimensional simulator. The static characteristics of SJ-ACCUFET, such as the breakdown voltages, on-resistance, and figure of merits, were obtained by varying the p-pillar doping concentration from $1{\times}10^{15}cm^{-3}$ to $5{\times}10^{16}cm^{-3}$ and the thickness from $0{\mu}m$ to $9{\mu}m$. The doping concentration and the thickness of p-pillar region are closely related to the break down voltage and on-resistance and threshold voltages. Hence a silicon carbide SJ-ACCUFET structure with highly intensified breakdown voltages and low on-resistances with good figure of merits can be achieved by optimizing the p-pillar thickness and doping concentration.

A study on the effect of ground conditions of room and pillar method on pillar and room strain (격자형 지하공간의 지반조건이 암주와 룸 변형률에 미치는 영향에 대한 연구)

  • Ham, Hyeon Su;Kim, Yong Kyu;Park, Chi Myeon;Lee, Chul Ho;Kim, YoungSeok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.577-587
    • /
    • 2021
  • Room and Pillar method is an underground facility construction method that maximizes the strength of the in-situ ground. In order to secure the safety of the underground space, it is necessary to secure the safety of the room actually used in addition to the safety of pillar of the room and Pillar method. In this study, the evaluation method for the safety of the room and rock pillar in the room and pillar method was studied through numerical analysis. Numerical analysis was performed for a total of 125 cases using ground conditions, pillar width, and room width as parameters, and the results were derived. As for the safety factor of the pillar, it was confirmed that the safety factor increased when the strength of the ground increased, and it was confirmed that the increment in the safety factor decreased when the width of the pillar was widened. The room strain was evaluated by applying the Critical strain. As the width of the pillar became narrower, the Critical strain was higher, and as the width of the room became smaller, the Critical strain was smaller. As a result of the correlation analysis between the safety factor of the pillar and the room strain, it was possible to derive the upper limit of the room strain that can secure the standard safety factor of the pillar according to the width of the pillar. It is judged that the results derived from this study can be used as a guideline to secure the safety of the room when the actual design is performed in consideration of the ground conditions and room width.

Light-weight Design with a Simplified Center-pillar Model for Improved Crashworthiness (측면충돌 성능 향상을 위한 고강도 강판의 적용 및 단순 센터필러 모델의 최적경량설계)

  • Bae, Gi-Hyun;Huh, Hoon;Song, Jung-Han;Kim, Se-Ho
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.14 no.6
    • /
    • pp.112-119
    • /
    • 2006
  • This paper is concerned with the light-weight design of a center-pillar assembly for the high-speed side impact of vehicle using advanced high strength steels(AHSS). Steel industries continuously promote the ULSAB-AVC project for applying AHSS to structural parts as an alternative way to improve the crashworthiness and the fuel efficiency because it has the superior strength compared to the conventional steel. In order to simulate deformation behavior of the center-pillar assembly, a simplified center-pillar model is developed and parts of that are subdivided employing tailor-welded blanks(TWB) in order to control the deformation shape of the center-pillar assembly. The thickness of each part which constitutes the simplified model is selected as a design parameter. Factorial design is carried out aiming at the application and configuration of AHSS to simplified side-impact analysis because it needs tremendous computing time to consider all combinations of parts. In optimization of the center-pillar, S-shaped deformation is targeted to guarantee the reduction of the injury level of a driver dummy in the crash test. The objective function is constructed so as to minimize the weight and lead to S-shape deformation mode. Optimization also includes the weight reduction comparing with the case using conventional steels. The result shows that the AHSS can be utilized effectively for minimization of the vehicle weight and induction of S-shaped deformation.

Stability evaluation of room-and-pillar underground method by 3D numerical analysis model (3차원 수치해석모델을 이용한 주방식 지하공간의 안정성 평가)

  • Byung-Yun, Kang;Sanghyuk, Bang;Choong-Ky, Roh;Dongkwan, Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.1
    • /
    • pp.1-11
    • /
    • 2023
  • In this study, the stability of the room-and-pillar underground method was investigated using numerical analysis method. In-situ geotechnical investigation was conducted, and a supporting pattern was selected based on the geotechnical investigation data. For the supporting pattern, Type-1, 2, 3 were selected for each ground condition. A 3D numerical analysis model was developed for effective simulation as the room-and-pillar underground method consist of a pillar and room. As a review of numerical analysis, it was confirmed that the crown settlement, convergence, shotcrete and rock bolt were all stable in all supporting patterns. As a result of the analysis by the construction stage, it was confirmed that excessive stress was generated in the room when the construction stage of forming pillar. So, precise construction is required during the actual construction stage of the pillar formation.

Stress Analysis of the Vacuum glazing according to the Pillar shapes and Arrangements using Finite Element Method (FEM을 이용한 지지대 형상 및 배열에 따른 진공창 유리의 응력해석)

  • Kim, Jae-Kyung;Jeon, Euy-Sik;Kim, Young-Shin
    • Journal of the Semiconductor & Display Technology
    • /
    • v.9 no.1
    • /
    • pp.49-54
    • /
    • 2010
  • Windows are still the thermally weakest part in considering energy efficiency. The vacuum glazing is considered as a new alternative in terms of energy efficiency. Vacuum glazing are consisting of two separated glass, pillars are support the under and upper glass. Therefore in this paper suggested the pillar shapes and array arrangements method using Finite Element Method and validity were proved by comparing and analyzing with the research that it is announced through the existing experiment. It is considered to solve pillar shapes and arrangement method problem of the vacuum glazing using proposed FEM analysis.

Extracting Photosynthetic Electrons from Thylakoids on Micro Pillar Electrode

  • Ryu, DongHyun;Kim, Yong Jae;Ryu, WonHyoung
    • International Journal of Precision Engineering and Manufacturing-Green Technology
    • /
    • v.5 no.5
    • /
    • pp.631-636
    • /
    • 2018
  • Extraction of photosynthetic currents from thylakoids was studied using micro pillar structured electrode. Thylakoids were isolated from spinach leaves, and the size and shape of thylakoids were estimated from scanning electron microscopy images. Based on the geometry information of thylakoids, micro pillar shaped electrode was designed and fabricated using metal-assisted chemical etching of silicon wafers. Influence of photovoltaic effect on the silicon-based micro pillar electrode was confirmed to be negligible. Photosynthetic currents were measured in a three-electrode setup with an electron mediator, potassium ferricyanide. Photosynthetic currents from micro pillar electrodes were enhanced compared with the currents from flat electrodes. This indicates the significance of the enhanced contact between thylakoids and an electrode for harvesting photosynthetic electrons.

Investigation lateral deformation and failure characteristics of strip coal pillar in deep mining

  • Chen, Shaojie;Qu, Xiao;Yin, Dawei;Liu, Xingquan;Ma, Hongfa;Wang, Huaiyuan
    • Geomechanics and Engineering
    • /
    • v.14 no.5
    • /
    • pp.421-428
    • /
    • 2018
  • In deep mining, the lateral deformation of strip coal pillar appears to be a new characteristic. In order to study the lateral deformation of coal-mass, a monitoring method and monitoring instrument were designed to investigate the lateral deformation of strip coal pillar in Tangkou Coalmine with the mining depth of over 1000 m. Because of without influence of repeated mining, the bedding sandstone roof is easy to break and the angle between maximum horizontal stress and the roadway is small, the maximum lateral deformation is only about 287 mm lower than the other pillars in the same coalmine. In deep mining, the energy accumulation and release cause a discontinuous damage in the heterogeneous coal-mass, and the lateral deformation of coal pillar shows discontinuity, step and mutation characters. These coal-masses not only show a higher plasticity but also the high brittleness at the same time, and its burst tendency is more obvious. According to the monitoring results and theoretical calculations, the yield zone of the coal pillar width is determined as 15.6 m. The monitoring results presented through this study are of great significance to the stability analysis and design of coal pillar.

Properties of Cu Pillar Bump Joints during Isothermal Aging (등온 시효 처리에 따른 Cu Pillar Bump 접합부 특성)

  • Eun-Su Jang;Eun-Chae Noh;So-Jeong Na;Jeong-Won Yoon
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.31 no.1
    • /
    • pp.35-42
    • /
    • 2024
  • Recently, with the miniaturization and high integration of semiconductor chips, the bump bridge phenomenon caused by fine pitches is drawing attention as a problem. Accordingly, Cu pillar bump, which can minimize the bump bridge phenomenon, is widely applied in the semiconductor package industry for fine pitch applications. When exposed to a high-temperature environment, the thickness of the intermetallic compound (IMC) formed at the joint interface increases, and at the same time, Kirkendall void is formed and grown inside some IMC/Cu and IMC interfaces. Therefore, it is important to control the excessive growth of IMC and the formation and growth of Kirkendall voids because they weaken the mechanical reliability of the joints. Therefore, in this study, isothermal aging evaluation of Cu pillar bump joints with a CS (Cu+ Sn-1.8Ag Solder) structure was performed and the corresponding results was reported.

Review of Mechanical Behaviors of Pillar in Large Parallel Tunnel (대단면 근접병설터널에서의 필러부 거동특성 검토)

  • Sin, Young-Wan;Kim, Young-Geun
    • Tunnel and Underground Space
    • /
    • v.20 no.3
    • /
    • pp.131-144
    • /
    • 2010
  • The design and construction of tunnels has been followed an large parallel tunnels with a small clearance because of the various conditions. Rock pillar between each single tunnel is supposed to be under heavy load by rock mass. The stability of pillar is very important for the ensure the stability of the large parallel tunnels. In this study, the analysis of stress state of pillar at various construction cases is reviewed to investigate the mechanical behaviour of tunnels and stability of the pillar.

Tunnel Behavior According to the Pillar Width (터널의 필러부 폭에 따른 터널거동)

  • Kim, Youngsu;Kwon, Taesoon;Jeong, Ilhan;Kim, Kwangil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.15-23
    • /
    • 2009
  • This research area is a greate section of triple tunnels that passes through the fault fractured zone the in the granite area. In this area, tunnel section, pillar width and overburden height are changed consecutively due to declivity of 1 : 4.5 and slope formation of upper part as changed section. That is, stability estimation for each section varying pillar width can be conducted because tunnel diameter changes gradually from 0.5D to 1.0D according to distance of pillar width. We have estimated the stability of pillar width in triple tunnels with monitoring value, and compared the stability with results of numerical analysis.

  • PDF