• Title/Summary/Keyword: 3D cable system

Search Result 103, Processing Time 0.028 seconds

Investigation on the wind-induced instability of long-span suspension bridges with 3D cable system

  • Zhang, Xin-Jun
    • Wind and Structures
    • /
    • v.14 no.3
    • /
    • pp.209-220
    • /
    • 2011
  • The cable system is generally considered to be a structural solution to increase the spanning capacity of suspension bridges. In this work, based on the Runyang Bridge over the Yangtze River, three case suspension bridges with different 3D cable systems are designed, structural dynamic characteristics, the aerostatic and aerodynamic stability are investigated numerically by 3D nonlinear aerostatic and aerodynamic analysis, and the cable system favorable to improve the wind-induced instability of long-span suspension bridges is also proposed. The results show that as compared to the example bridge with parallel cable system, the suspension bridge with inward-inclined cable system has greater lateral bending and tensional frequencies, and also better aerodynamic stability; as for the suspension bridge with outward-inclined cable system, it has less lateral bending and tensional frequencies, and but better aerostatic stability; however the suspension bridge is more prone to aerodynamic instability, and therefore considering the whole wind-induced instability, the parallel and inward-inclined cable systems are both favorable for long-span suspension bridges.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Performance Test of Cooling System for the KEPCO HTS Power Cable (한전 초전도전력케이블 냉각시스템 성능시험)

  • Yang, H.S.;Kim, D.L.;Sohn, S.H.;Lim, J.H.;Choi, H.O.;Lee, B.S.;Choi, Y.S.;Ryoo, H.S.;Hwang, S.D.
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.2206-2210
    • /
    • 2007
  • As a power transmission line supplying power to a densely populated city, the high temperature superconducting (HTS) cable is expected to one of the most effective cables with a compact size because of its high current density. The verification of HTS power cable system have been progressed by KEPRI. A cooling system for a 3-phase 100m HTS power cable with 22.9kV/1.25kA was installed and tested at KEPCO's Gochang power testing center in Korea. The system consists of a liquid nitrogen decompression cooling system with a cooling capacity of 3kW and a closed circulation system of subcooled liquid nitrogen. Several performance tests of the cable system with respect to the cooling such as cooling capacity, heat load and temperature stability, were performed at several temperatures. Thermal cycle test, cool-down to liquid nitrogen temperature and warm-up to room temperature, was also performed to investigate thermal cycle influences. The outline of the installed cooling system and performance test results are presented in this paper.

  • PDF

Development of Parametric Design Tool for Offshore Plant Cable Tray Using PML (프로그램 매크로언어를 이용한 해양 플랜트 케이블 트레이의 파라메트릭 설계 도구 개발)

  • Kim, Hyun-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.632-637
    • /
    • 2019
  • The cable tray design of an offshore plant production design is to optimally arrange the 3D modeling so that the cable can be installed without interfering with the structural members and various outfit equipment, and it is performed using a PDMS (Plant design management system), which is a 3D CAD system for an offshore plant layout. This study reviewed the development of PML (Programmable macro language) for a PDMS supporting offshore plant cable tray design and examined the efficiency compared to the existing method. Cable tray design PML developed in this paper enables fully parametric design using electrical outfit template library, allowing a rapid response to frequent modifications due to design changes and minimizing repetitive work fatigue by reflecting the accumulated design experience. In addition, the developed system was applied to the offshore plant structure module and it improved the work efficiency by more than 50% compared to the existing method.

Development of Cable for Towed Array Sonar System (예인 음탐기용 케이블 개발)

  • Yang, Seung-Yun;Kim, Jung-Suk;Kim, Chul-Min;Lee, Jin-Hee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.5
    • /
    • pp.559-566
    • /
    • 2016
  • Cables for Towed Array Sonar System(TASS) were developed. In order to verify the performance of cables, environmental and operational conditions as well as functional requirements were investigated during design stage. Double armored high and low voltage integrated cable for towed body and two kinds of cables, armored and light weight power and optic hybrid cables for towed array sensor system were developed by modeling and simulation. Customized manufacturing process and test method, such as foam extrusion and dynamic fatigue test were applied to this development. In conclusion, underwater towed hybrid cable with high tensile strength and compact structure were developed.

DEVELOPING WEB-BASED 5D SYSTEM CONNECTING COST, SCHEDULE AND 3D MODEL

  • Hando Kim;Jaehong Kim;Junghoon Han;Yonghan Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.157-161
    • /
    • 2011
  • BIM having started from architecture is being used in civil structure, but there are very few examples despite its effectiveness. In this paper, based on BIM technology, it is presented the method and result of developing web-based 5D system connecting cost, schedule and 3D model from the cable-stayed bridge. Through the system, the user can understand easily schedule on specific time and during some period and extract cost directly. This system also can manage various data types such as drawings, 3D models, documents and photos, for enhanced communication between stakeholders.

  • PDF

Harmonics based loss characteristics analysis of HTS DC power cable (고조파에 의한 초전도 직류 전력케이블의 손실 특성 분석)

  • Kim, S.K.;Kim, S.H.;Park, M.W.;Yu, I.K.;Lee, S.J.;Cho, J.W.;Sim, K.D.;Won, Y.J.;Hwang, S.D.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.13 no.3
    • /
    • pp.19-23
    • /
    • 2011
  • An HTS DC power cable is expected to perfectly eliminate transmission loss caused by resistance. However, when the HTS DC power cable is applied to the power system, loss of the HTS DC power cable is generated due to harmonics caused by HVDC converter. We designed and analyzed the HTS DC power cable with a critical current of 1 kA to investigate the loss characteristics using a finite element method package. In this paper, the loss characteristics caused by harmonics in the HTS DC power cable were analyzed according to order and magnitude of harmonics. Based on the analysis results, the critical current of HTS DC power cable considered with the rated current could be determined to minimize the capacity of cooling system for the design the HTS DC power cable.

Development of BIM-based bridge maintenance system for cable-stayed bridges

  • Shim, Chang-su;Kang, Hwirang;Dang, Ngoc Son;Lee, Deokkeun
    • Smart Structures and Systems
    • /
    • v.20 no.6
    • /
    • pp.697-708
    • /
    • 2017
  • Maintenance plays a critical role in the bridge industry, but actual practices show many limitations because of traditional, 2D-based information systems. It is necessary to develop a new generation of maintenance information management systems for more reliable decision making in bridge maintenance. Enhancing current work processes requires a BIM-based 3D digital model that can use information from the whole lifecycle of a project (design, construction, operation, and maintenance) through continuous exchanges and updates from each stakeholder. This study describes the development of a data scheme for maintenance of cable-stayed bridges. We implemented the proposed system for a cable-stayed bridge and discussed its effectiveness.

Effects of partially earth-anchored cable system on dynamic wind response of cable-stayed bridges

  • Won, Jeong-Hun;Yoon, Ji-Hyun;Park, Se-Jun;Kim, Sang-Hyo
    • Wind and Structures
    • /
    • v.11 no.6
    • /
    • pp.441-453
    • /
    • 2008
  • In this study, a partially earth-anchored cable system is studied in order to reduce the dynamic wind response of cable-stayed bridges. The employment of earth-anchored cables changes the dynamic characteristics of cable-stayed bridges under wind loads. In order to estimate the changes in the member forces, the spectral analysis for wind buffeting loads are performed and the peak responses are evaluated using 3-D finite element models of the three-span cable-stayed bridges with the partially earth-anchored cable system and with the self-anchored cable system, respectively. Comparing the results for the two different models, it is found that the earth-anchored cables affect longitudinal and vertical modes of the bridge. The changes of the natural frequencies for the longitudinal modes remarkably decrease the peak bending moment in the pylon and the movements at the expansion joints. The small changes of the natural frequencies for the vertical modes slightly increase bending moments and deflections in the girder. The original effects of the partially earth-anchored cable system are also shown under wind loads; the decrement of girder axial forces and bearing uplifting forces, and the increment of cable forces in the earth-anchored cables.

Numerical model of a tensioner system and riser guide

  • Huang, Han;Zhang, Jun;Zhu, Liyun
    • Ocean Systems Engineering
    • /
    • v.3 no.4
    • /
    • pp.257-273
    • /
    • 2013
  • Top tensioned riser (TTR) is often used in a floating oil/gas production system deployed in deep water for oil/gas transport. This study focuses on the extension of the existing numerical code, known as CABLE3D, to allow for static and dynamic simulation of a TTR connected to a floating structure through a tensioner system or buoyancy can, and restrained by riser guides at different elevations. A tensioner system usually consists of three to six cylindrical tensioners. Although the stiffness of individual tensioner is assumed to be linear, the resultant stiffness of a tensioner system may be nonlinear. The vertical friction between a TTR and the hull at its riser guide is neglected assuming rollers are installed there. Near the water surface, a TTR is forced to move horizontally due to the motion of the upper deck of a floating structure as well as related riser guides. The extended CABLE3D is then integrated into a numerical code, known as COUPLE, for the simulation of the dynamic interaction among the hull of a floating structure, such as spar or TLP, its mooring system and riser system under the impact of wind, current and waves. To demonstrate the application of the extended CABLE3D and its integration with COUPLE, the numerical simulation is made for a truss spar under the impact of Hurricane "Ike". The mooring system of the spar consists of nine mooring lines and the riser system consists of six TTRs and two steel catenary risers (SCRs).