• Title/Summary/Keyword: 3D BIM

Search Result 397, Processing Time 0.03 seconds

Automation in Site Planning of Apartment Complex - Through Rhino Grasshopper's Parametric Modeling and Optimization - (아파트 최적 배치 자동화 - Rhino Grasshopper를 활용한 parametric model의 최적화를 중심으로 -)

  • Sung, Woo-Jae;Jeong, Yo-Han
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.22-32
    • /
    • 2020
  • Apartment building site planning is one of time consuming and labor-intensive tasks in architectural design field, due to its complexity in zoning regulations, building codes, local restrictions, and site-specific conditions. In other words, the process can be seen as a very complicated mathematical function with layers of variables and parameters, which ironically can be automated using computational methods on parametric tools. In this paper, a practical method of automating site planning of an apartment complex has been proposed by utilizing parametric approaches in Rhino 3D and Grasshopper. Two primary parameters, building heights and positions, determine the efficacy of building layouts under all regulatory standards, thus testing out numerous combinations of the two will produce some successful layout alternatives. For this, equation solver has been used for iterating the parametric model to sort out meaningful results among others. It also has been proven that the proposed process significantly reduced the time in site planning down to less than an hour on most cases, and many successful alternatives could be obtained by using multiple computers. Post evaluation processes such as day light and view shed analysis helped sort out the best performing ones out of functioning alternatives.

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

A Study on the Student Surveys for CAAD(Computer Aided Architectural Design) (건축 CAD 과목에 대한 학생 설문평가에 관한 연구)

  • Nam, Yun-Cheol
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.117-124
    • /
    • 2012
  • The importance of the digital architecture is increasing more ever. Currently, CAD and 3D programs are used as design fields, but the BIM (building information modeling) is gradually interested. BIM is mandatory on the project more than 50 billion won ordered by the government since 2012, it will be expanded to a total of government orders by 2016. University needs to evaluate teaching methods and computer-aided design environments such as CAD and BIM. In this paper, we surveyed computer-aided design environments and teaching methods for 73 students at the J University of Department of architectural engineering. Main results are as follows: 1. Hardlock is uncomfortable but necessary program for the computer management. 2. The desk placement considering the behavior of the design students results in higher satisfaction. 3. Because a CAD subject was a difficult course content and progress is fast, students thought it is difficult to follow. Especially, first-year students answered it is difficult to learn program and understand the structure of the building at the same time. 4. First-year students want to learn CAD more. Second-, third-, fourth-year students want to learn Photoshop more. Supplement for these classes is required. 5. Students answered that a teaching method of a CAD subject would be good to their own practice after the professor demonstrates for students. The senior's assistance is also a high effective way in the class. 6. During class, students' activities such surfing the web and Kakao Talk on a smartphone disrupt the class, there is a need to regulate by a rule such as disconnect computers from a network and against using smartphone. Although the Internet with the popularization of smartphones confers a benefit on modern life, it causes damage to us. This is a hard part for a salaried workers as well as students studying equally. The self management is required and a professor needs to control and restraint in a university classroom. The professor's continuing interest to students can increase the effectiveness of learning.

Freeform 3D Coordinate Control Technology using CNC Twisted Tube Method -Focused on The ARC in DaeGu- (CNC Twisted Tube공법을 이용한 비정형 3차원 좌표제어 기술 -대구 대표물문화관(디아크)를 중심으로-)

  • Kim, Sung-Jin;Ryu, Geun-seok;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.227-228
    • /
    • 2012
  • In contemporary architectural practice, flat sections and plan drawings are no longer a primary means of representation and communication with participants. A typical building design has an ornamental exterior wall system and a roof system that should have water-proof quality and drainage function. By comparison, distinction between exterior wall and roof are unclear in freeform buildings, and they are integrated into a concept of a building envelope. This study is to propose 3D coordinate control technology for freeform structure by CNC curved tube method in order to develop a BIM-based envelope design and construction method for freeform building. Because a much wider freeform building construction can be achieved with correct 3D data and easy-to-implement in construction field, the proposed 3D coordinate control technology is highly recommended for practical use instead of the conventional CAD system.

  • PDF

Knowledge Evolution in Construction Automation Research

  • Mun, Seong-Hwan;Kim, Taehoon;Lee, Ung-Kyun;Cho, Kyuman;Lim, Hyunsu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.577-584
    • /
    • 2020
  • Construction automation and robotics have been widely adopted in the construction industry as a promising solution to such issues like a shortage of skilled labor and the difficulties workers face in harsh working environments. The analysis of the knowledge structure and its evolution from the existing articles helps identify essential knowledge elements and possible future research directions. This study attempts to (1) construct keyword networks from the papers published in the International Symposium on Automation and Robotics in Construction (ISARC), (2) investigate how keywords and keyword communities are associated with each other, and (3) examine the changes in the crucial keywords over time. Through cluster analysis, 79 keywords were categorized into four groups (BIM, Building construction, Sensing, and GPS as representative keywords) with similar structural positions. Research trends show that research themes related to Infrastructure, Construction equipment, and 3D have consistently received a large amount of attention, regardless of geographical region. Research on as-built status model utilization through BIM and Laser scanning and improving Energy performance is taking place more frequently. In contrast, research studies related to problem-solving based on Neural networks are not as common as previously. This study provides useful insights into the construction automation field, at both the macro and micro levels.

The Study for Improvement Method of Landscape Simulation Program (경관시뮬레이션 프로그램 개선방안에 관한 연구)

  • Lee, Dong-Hwa;Kim, Jae-Myeong
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.89-97
    • /
    • 2020
  • The purpose of this study is to identify the problems of the currently used 3D spatial information utilization system to realize a more accurate landscape and to establish a user-oriented environment to improve the utilization plan for future landscape evaluation. As citizens' interest in urban landscapes with strong public characteristics increases and the speed of urban development also increases, more suitable simulation methods for landscape management are required. Nevertheless, there are many cases of inconvenient correction according to development changes along with many errors in various steps for creating landscape simulation. Therefore, in performing landscape deliberation according to development, it is necessary to create more accurate and efficient landscape simulation, and if changes occur after the initial deliberation, a process that can quickly and conveniently correct and supplement data is needed. In addition, it is necessary to create landscape simulation so that the created modeling source can be used by being compatible with other application programs. In this study, a method of constructing a more accurate and efficient simulation at the time of initial deliberation and a method of creating a landscape simulation model for rapid response to a plan that is changed at the time of re-deliberation are described.

Exploring the Combined Use of LiDAR and Augmented Reality for Enhanced Vertical and Horizontal Measurements of Structural Frames (골조 수직, 수평 측정작업 시 LiDAR 및 AR 기술 적용방안 제시)

  • Park, Inae;Kim, Sangyong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.273-284
    • /
    • 2023
  • This study is centered on the combined use of LiDAR(Light Detection and Ranging) and AR(Augmented Reality) technologies during vertical and horizontal frame measurements in construction projects. The intention is to enhance the quality control procedure, elevate accuracy, and curtail manual labor along with time expenditure. Present methods for accuracy inspection in frame construction often grapple with reliability concerns due to subjective interpretation and the scope for human error. This research recommends the application of LiDAR and AR technologies to counter these issues and augment the efficiency of the inspection process, along with facilitating the dissemination of results. The suggested technique involves the collection of 3D point cloud data of the frame utilizing LiDAR and leveraging this data for checks on construction accuracy. Furthermore, the inspection outcomes are fed into a BIM (Building Information Modeling) model, and the results are visualized via AR. Upon juxtaposing this methodology with the current approach, it is evident that it offers benefits in terms of objective inspection, speed, precise result sharing, and potential enhancements to the overall quality and productivity of construction projects.

3D WALK-THROUGH ENVIRONMENTAL MODEL FOR VISUALIZATION OF INTERIOR CONSTRUCTION PROGRESS MONITORING

  • Seungjun Roh;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.920-927
    • /
    • 2009
  • Many schedule delays and cost overruns in interior construction are caused by a lack of understanding in detailed and complicated interior works. To minimize these potential impacts in interior construction, a systematic approach for project managers to detect discrepancies at early stages and take corrective action through use of visualized data is required. This systematic implementation is still challenging: monitoring is time-consuming due to the significant amount of as-built data that needs to be collected and evaluated; and current interior construction progress reports have visual limitations in providing spatial context and in representing the complexities of interior components. To overcome these issues, this research focuses on visualization and computer vision techniques representing interior construction progress with photographs. The as-planned 3D models and as-built photographs are visualized in a 3D walk-through model. Within such an environment, the as-built interior construction elements are detected through computer vision techniques to automatically extract the progress data linked with Building Information Modeling (BIM). This allows a comparison between the as-planned model and as-built elements to be used for the representation of interior construction progress by superimposing over a 3D environment. This paper presents the process of representing and detecting interior construction components and the results for an ongoing construction project. This paper discusses implementation and future potential enhancement of these techniques in construction.

  • PDF

UAV and LiDAR SLAM Combination Effectiveness Review for Indoor and Outdoor Reverse Engineering of Multi-Story Building (복층 건물 실내외 역설계를 위한 UAV 및 LiDAR SLAM 조합 효용성 검토)

  • Kang, Joon-Oh;Lee, Yong-Chang
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.2
    • /
    • pp.69-79
    • /
    • 2020
  • TRecently, smart cities that solve various problems in cities based on IoT technology are in the spotlight. In particular, cases of BIM application for smooth management of construction and maintenance are increasing, and spatial information is converted into 3D data through convergence technology and used for safety diagnosis. The purpose of this study is to create and combine point clouds of a multi-story building by using a ground laser scanner and a handheld LiDAR SLAM among UAV and LiDAR equipment, supplementing the Occluded area and disadvantages of each technology, examine the effectiveness of indoor and outdoor reverse design by observing shape reproduction and accuracy. As a result of the review, it was confirmed that the coordinate accuracy of the data was improved by creating and combining the indoor and outdoor point clouds of the multi-story building using three technologies. In particular, by supplementing the shortcomings of each technology, the completeness of the shape reproduction of the building was improved, the Occluded area and boundary were clearly distinguished, and the effectiveness of reverse engineering was verified.

LIM Implementation Method for Planning Biotope Area Ratio in Apartment Complex - Focused on Terrain and Pavement Modeling - (공동주택단지의 생태면적률 계획을 위한 LIM 활용방법 - 지형 및 포장재 모델링을 중심으로 -)

  • Kim, Bok-Young;Son, Yong-Hoon;Lee, Soon-Ji
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.14-26
    • /
    • 2018
  • The Biotope Area Ratio (BAR) is a quantitative pre-planning index for sustainable development and an integrated indicator for the balanced development of buildings and outdoor spaces. However, it has been pointed out that there are problems in operations management: errors in area calculation, insufficiency in the underground soil condition and depth, reduction in biotope area after construction, and functional failure as a pre-planning index. To address these problems, this study proposes implementing LIM. Since the weights of the BAR are mainly decided by the underground soil condition and depth with land cover types, the study focused on the terrain and pavements. The model should conform to BIM guidelines and standards provided by government agencies and professional organizations. Thus, the scope and Level Of Detail (LOD) of the model were defined, and the method to build a model with BIM software was developed. An apartment complex on sloping ground was selected as a case study, a 3D terrain modeled, paving libraries created with property information on the BAR, and a LIM model completed for the site. Then the BAR was calculated and construction documents were created with the BAR table and pavement details. As results of the study, it was found that the application of the criteria on the BAR and calculation became accurate, and the efficiency of design tasks was improved by LIM. It also enabled the performance of evidence-based design on the terrain and underground structures. To adopt LIM, it is necessary to create and distribute LIM library manuals or templates, and build library content that comply with KBIMS standards. The government policy must also have practitioners submit BIM models in the certification system. Since it is expected that the criteria on planting types in the BAR will be expanded, further research is needed to build and utilize the information model for planting materials.