• Title/Summary/Keyword: 3D BIM

Search Result 401, Processing Time 0.024 seconds

A Basic Study on Utilization of Building Information for n Internet of Things (IoT) Simulation System Development (사물인터넷 시뮬레이션 시스템 개발을 위한 건물정보의 활용에 관한 기초연구)

  • Yu, Jeong-Hyun;Lee, Yun-Gil
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.8 no.1
    • /
    • pp.867-874
    • /
    • 2018
  • This study aims to develop a sort of expert system to simulate Internet of Things (IoT) service in architectural design alternatives and enhance the simulation performance using building information. The proposed protype system, named iotBIM, visualizes human behaviors and IoT services in a virtual place that is automatically generated from among design alternatives. We use commercial building information modeling (BIM) authoring tool for the development of iotBIM. The decision to develop iotBIM on the BIM platform was made because BIM tools already generate precise 3D models of design alternatives; iotBIM is plugged into the BIM tool as a simulation module. In the midst of the design process, architectural designers can activate iotBIM to investigate and establish IoT services that accord visually with design alternatives. The purpose of this study is to provide a theoretical and technological basis for the ultimate goal of this study.

Analysis of 3D Laser Scanner Input Performance in Structual Safety Diagnosis (구조안전진단에서의 3D 레이저 스캐너 투입 성과 분석)

  • Seong, Do-Yun;Baek, In-Soo;Kim, Jea-Jun;Ham, Nam-Hyuk
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.34-44
    • /
    • 2021
  • This study quantitatively analyzes the work performance of the structural safety diagnosis team that diagnoses pipe racks. To this end, a method for evaluating the performance of the structural safety diagnosis team using the queuing model was proposed. For verification, the case of applying the existing method and the method of introducing a 3D laser scanner for one site was used. The period, number of people, and initial investment cost of each project were collected through interviews with case project experts. As a result of analyzing the performance of the structural safety diagnosis team using the queuing model, it was possible to confirm the probability of delay in the work of each project and the amount of delayed work. Through this, the cost (standby cost) when the project was delayed was analyzed. Finally, economic analysis was conducted in consideration of the waiting cost, labor cost, and initial investment cost. The results of this study can be used to decide whether to introduce 3D laser scanners.

BIM Mesh Optimization Algorithm Using K-Nearest Neighbors for Augmented Reality Visualization (증강현실 시각화를 위해 K-최근접 이웃을 사용한 BIM 메쉬 경량화 알고리즘)

  • Pa, Pa Win Aung;Lee, Donghwan;Park, Jooyoung;Cho, Mingeon;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.249-256
    • /
    • 2022
  • Various studies are being actively conducted to show that the real-time visualization technology that combines BIM (Building Information Modeling) and AR (Augmented Reality) helps to increase construction management decision-making and processing efficiency. However, when large-capacity BIM data is projected into AR, there are various limitations such as data transmission and connection problems and the image cut-off issue. To improve the high efficiency of visualizing, a mesh optimization algorithm based on the k-nearest neighbors (KNN) classification framework to reconstruct BIM data is proposed in place of existing mesh optimization methods that are complicated and cannot adequately handle meshes with numerous boundaries of the 3D models. In the proposed algorithm, our target BIM model is optimized with the Unity C# code based on triangle centroid concepts and classified using the KNN. As a result, the algorithm can check the number of mesh vertices and triangles before and after optimization of the entire model and each structure. In addition, it is able to optimize the mesh vertices of the original model by approximately 56 % and the triangles by about 42 %. Moreover, compared to the original model, the optimized model shows no visual differences in the model elements and information, meaning that high-performance visualization can be expected when using AR devices.

Developing Object Library Browser for Reclamation Based BIM (BIM 기반의 준설매립전용 Library Browser 개발)

  • Lee, Dongyun;Lee, Junho;Lee, Sangwoong;Choi, Chaseok;Gu, Bonhyo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.3
    • /
    • pp.57-63
    • /
    • 2014
  • This study has been conducted to building a library intended for structures considered in the design of reclamation for design automation and developing browser for integrated management system. The library has been developed using a parametric modeling method capable of changing section shape, also classifying standard crossing and family library, has been developed according to the working environment. Classified library by the characteristics manages objects and working modeling on based BIM has been developed browser using the C# program for objects to use conveniently. By interworking between developed Browser and 3D Autocad based BIM, it is possible to use easily at design drafting, calculating quantities, developing a new library, and managing a library. The browser using effectively exclusive library to reclamation is developed in this study.

The Simulation Function Analysis for BIM based construction planning (BIM기반 시공계획의 시뮬레이션 기능 분석 연구)

  • Jun, Ki-Hyun;Kim, Chang-Seob;Yun, Seok-Heon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.95-98
    • /
    • 2011
  • 건설공사 프로젝트는 사전 기획 단계, 설계, 계약, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주체에 의해 프로젝트가 진행되고 각 분야 간의 원활한 의사소통을 통한 협력 작업으로 일을 진행한다. 그러나 각 단계별 참여주체간의 협업이 어렵고 정보교류가 원활하지 못한 문제점들이 있다. 또한 건설공정은 현장여건의 변화와 불확실성으로 인해 예측이 어렵고, 보다 신뢰성이 있는 계획의 부재로 인하여 각종 세부 공정들 간의 간섭을 유발하고 계획된 일정을 준수하기 어려워 불필요한 비용의 낭비와 공사기간의 증가를 야기한다. 이러한 낭비요인을 최소화하고 건축 프로젝트를 진행하는데 있어서 효율성을 높이기 위해서는 시공계획 단계의 신뢰성을 높여야 한다. 따라서 시공전의 계획 단계에서부터 4D 시뮬레이션을 통하여 이러한 문제점들을 파악하고 개선하는 것이 중요하다. 본 연구에서는 BIM기반의 시뮬레이션 프로그램의 기능분석을 통하여 효율적인 적용과 발전과정을 알아보고자 한다.

  • PDF

A Fundamental Study on Applying BIM to Power Manage System of Super Tall Buildings (초고층 건축물 전력관리 시스템에 BIM 적용을 위한 기초적 연구)

  • Jo, Chan-Won;Kwon, Soon-Ho;Lee, Woon-Jae;Roh, Tae-Im;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.2
    • /
    • pp.140-148
    • /
    • 2012
  • This study aims to provide power monitoring system for super tall buildings with 3D BIM (Building Information Modeling) technology. In order to realize this subject, standard specifications for BIM objects and attributes were studied through analyzing processes and elements of electrical utilities for power management systems applied for super tall buildings. These standard BIM specifications could be used by designers, contractors and facility operators, and thus could be helpful to realize BIM information sharing between multiple disciplines and construction phases. And further study has been suggested to develop standard specification and applications from this study.

Data interoperability between authoring software and BIM system focused on the office building in conceptual design phase (설계 초기 단계 형상정보 연동 데이터 호환체계 개발 - 오피스 매스를 중심으로)

  • Park, Jung-Dae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.494-500
    • /
    • 2020
  • Owing to the complexity of shapes and elements, some difficulties are found in the modeling and sharing phases in a project at the earlier design stages. This paper extends the boundaries by suggesting the data interoperability between 3D modeling software, McNeel Rhino 3D and BIM system, and Autodesk® Revit® Architecture. The main research methodology is to link the architectural form data in the NURBS supporting the 3DM format, especially for integrating surface properties into the mass family template of Revit. This algorithm-driven interoperability approach using visual programming, such as Dynamo in conjunction with Autodesk®, can be applicable in a theoretical part and also a practical use-case. This paper summarizes these results as sequence guidelines and project template recommendations suggesting an efficient design process to interoperate geometric data with the BIM system to manipulate and control the regular and curved form of office buildings.

A Study on the Improvement of Repair and Reinforcement Quantity Take-off in Fire-damaged Area Using 3D Laser Scanning (3D Laser Scanning을 활용한 화재 손상 부위의 보수·보강 물량 산출 방식 개선에 관한 연구)

  • Jeong, Hoi-Jae;Ham, Nam-Hyuk;Lee, Byoung-Do;Park, Kwang-Min;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.9 no.1
    • /
    • pp.11-21
    • /
    • 2019
  • Recently, there is an increase in fire incidents in building structures. Due to this, the importance of fire-damaged buildings' safety diagnosis and evaluation after fire is growing. However, the existing fire-damaged safety diagnosis and evaluation methods are personnel-oriented, so the diagnostic results are intervened by investigators' subjectivity and unquantified. Thus, improper repair and reinforcement can result in secondary damage accidents and economic losses. In order to overcome these limitations, this study proposes using 3D laser scanning technology. The case analysis of fire-damaged building structures was conducted to verify the effectiveness of accuracy and manpowering by comparing the existing method and the proposed method. The proposed method using 3D laser scanning technology to obtain point cloud data of fire-damaged field. The point cloud data and BIM model is combined to inspect the fire-damaged area and depth. From inspection, quantified repair and reinforcement quantity take-off can be acquired. Also, the proposed method saves half of the manpowering within same time period compared to the existing method. Therefore, it seems that using 3D laser scanning technology in fire-damaged safety diagnosis and evaluation will improve in accuracy and saving time and manpowering.

Structures and Sorption Properties of 2-Methylbenzimidazolate-Based Zn(II) Frameworks

  • Phang, Won Ju;Lee, Woo Ram;Hong, Chang Seop
    • Bulletin of the Korean Chemical Society
    • /
    • v.35 no.8
    • /
    • pp.2419-2422
    • /
    • 2014
  • The syntheses and crystal structures of a three-dimensional (3D) coordination network $[Zn_4(2-mBIM)_5-(C_2H_6NCOO)(HCOO)({\mu}-OH)]{\cdot}DMF$ ($1{\cdot}$DMF; 2-mBIM = 2-methylbenzimidazolate) and a two-dimensional (2D) layer $[Zn_2(2-mBIM)_3(HCOO)(H_2O)]{\cdot}DMF$ ($2{\cdot}DMF$) are reported. Different structures were produced depending on the ratio of reactants. Structurally, 1 illustrates the formation of a unique framework based on a 2-mBIM bridge with the side group on an imidazole ring, while 2 possesses a honeycomb layer built up purely from imidazolates. For gas sorption, $CO_2$ is adsorbed on the activated phase of 1 but $N_2$ is not taken up.

Practices on BIM-based indoor spatial information implementation and location-based services (BIM기반 실내공간정보구축 및 위치정보 활용 서비스 동향 고찰)

  • Kim, Min-Cheol;Jang, Mi-Kyoung;Hong, Sung-Moon;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.41-50
    • /
    • 2015
  • Increasing size and complexity of indoor structures have led to much more complication in the spatial cognition and situational awareness. Contrary to outdoor environments, occupants have limited information regarding the indoor space syntax in terms of architectural and semantic information as well as how they interact with their surroundings. The availability of such information could give conveniences to both users and managers in various aspects. In order to visualize the exact location of rooms and utilities in 3D, many studies and projects have utilized BIM models because of its promising value of representing building components. In fact, the application of BIM provides definitive spatial indoor data and creates services for indoor space management and navigation. Therefore, this paper aims to provide an overview of practices on BIM-based indoor spatial information implementation and location-based services. It is expected that enabling of technologies, data-rich content and accessibility of information products will accelerate the growth of the spatially-related markets in various fields.