• Title/Summary/Keyword: 3D 발파진동 영향 분석

Search Result 8, Processing Time 0.01 seconds

BIM-based visualization technology for blasting in Underground Space (지하공간 BIM 기반 발파진동 영향 시각화 기술)

  • Myoung Bae Seo;Soo Mi Choi;Seong Jong Oh;Seong Uk Kim;Jeong Hoon Shin
    • Smart Media Journal
    • /
    • v.12 no.11
    • /
    • pp.67-76
    • /
    • 2023
  • We propose a visualization method to respond to civil complaints through an analysis of the impact of blasting. In order to analyze the impact of blasting on tunnel excavation, we propose a simulation visualization method considering the mutual influence of the construction infrastructure by linking measurement data and 3D BIM model. First, the level of BIM modeling required for simulation was defined. In addition, vibration measurement data were collected for the GTX-A construction site, terrain and structure BIM were created, and a method for visualizing measurement data using blast vibration estimation was developed. Next, a spherical blasting influence source library was developed for visualization of the blasting influence source, and a specification table that could be linked with Revit Dynamo automation logic was constructed. Using this result, a method for easily visualizing the impact analysis of blasting vibration in 3D was proposed.

Case Study of Blasting Pattern Design for Tunnelling in Which Considered Blast Induced Vibration Affected Across Buildings (터널 굴착 시 주변 구조물에 미치는 영향을 고려한 발파 설계 사례)

  • Baek, Seung-Kyu;Choo, Seok-Yeon;Yoon, Jong-O;Baek, Un-Il;Park, Hyung-Seop
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.377-386
    • /
    • 2006
  • In generally blasting pattern design is carried out in-situ borehole blasting test and its analysis. We added the 3D numerical analysis for blast induced vibrations. This paper is case study of 3D numerical analysis in which considered blast induced vibration affected across buildings, and then we design the blasting pattern of tunnel excavation.

Study on Preliminary Influence Analysis of Construction Noise and Vibration (건설 소음.진동의 사전 영향성 분석에 관한 연구)

  • Ahn, Myung-Seok;Kim, Hwa-Il;Park, Ju-Han
    • Explosives and Blasting
    • /
    • v.32 no.2
    • /
    • pp.25-30
    • /
    • 2014
  • Although the construction noise and vibration are transient and intermittent, their impact on the surrounding environment is huge. Since the construction equipment noise and vibration is usually transmitted because of the long distance, the sound insulation and the proper design of anti-vibration measures are very difficult. The regulation requires that the noise and vibration caused by the construction equipments should be measured within 30m from the source, whereas the blasting noise and vibration should be measured at least 60m and 160m away from the source, respectively. Instead of the 2D modelling mainly conducted so far, the 3D analysis of noise and vibration with the consideration of the height and size of the building, mountains and hills in the vicinity of the source is necessary.

Field Demonstration of Pre-Fracturing for Controlling Noise and Vibration (선행이완발파의 진동 및 소음 제어 효과 검증을 위한 발파 시험 시공)

  • Juhyi Yim;Bong Cheol Lee;Jae Hoon Jung;Han Byul Kang;Jae Won Lee;Young Jin Shin
    • Explosives and Blasting
    • /
    • v.42 no.3
    • /
    • pp.49-57
    • /
    • 2024
  • Pre-fracturing is the blasting method to weaken the rock mass prior to the main excavation. This study aims to evaluate the effectiveness of pre-fracturing by using half the explosive charge typically employed in conventional blasting designs. Field tests conducted at a quarry in Gapyeong showed that noise levels were reduced by 2.7 dB due to the decreased amount of explosive per blast hole, and vibration levels were controlled to the precision vibration control blasting standard. Rock weakening was confirmed through induced cracks observed on the surface and core samples, and it was noted that the weakening effect of the blasting decreased as the burden increased. The vibrations from conventional blasting were found to be lower than those from pre-fracturing. This was attributed more to the geological conditions, such as joints, rather than the blasting design factors like explosive amount, burden, and the number of free face.

Experimental Study of the Effect of Vibration on the Geomunoreum Lava Tube System in Jeju (제주 거문오름 용암동굴계의 진동영향에 관한 실험적 연구)

  • Song, Jae-Yong;Lee, Geun-Chun;Ahn, Ung-San;Lim, Hyun-Muk;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.30 no.3
    • /
    • pp.327-345
    • /
    • 2020
  • The effects of ground vibration on lava tubes during construction were studied to aid design of management and preservation measures for lava tubes. Ground conditions were assessed by RMR (Rock mass rating) and Q-system classifications for the Geomunoreum lava tubes, and vibration velocity was measured during in situ blasting tests in the Manjanggul and Yongcheondonggul lava tubes. Results indicate that the higher the rock quality, the greater the effect of vibration, although there is no clear linear relationship due to ground heterogeneity. A relationship derived between vibration velocity (PPV) and intensity (dB(V)) on the basis of blasting tests indicates that a vibration level of < 0.285 cm/sec meets the regulatory limit of 0.371 cm/sec and 65 dB(V) during daytime, and 0.285 cm/sec and 60 dB(V) during night. For blasting vibrations, square- and cube-root scaled distances are linearly correlated, with R2 ≥ 0.76. On the basis of this correlation, explosive-charge weights meeting the 0.2 cm/sec vibration criterion for cultural heritage were estimated to be 2.88 kg at 50 m distance, and 11.52 kg at 100 m.

BIM Automatic Design and the Optimization of the Tunnel Blasting Patterns (터널 발파패턴 최적화를 위한 BIM 설계자동화)

  • Eunji Jo;Woojin Kim;Jaeho Jung;Sanghyuk Bang
    • Tunnel and Underground Space
    • /
    • v.34 no.5
    • /
    • pp.461-476
    • /
    • 2024
  • As the paradigm of urban development has recently changed to development of underground space, the road tunnels and railway tunnels are increasing to relieve traffic congestion. This technical notes is related to the development of underground spaces using NATM (New Austrian Tunneling Method). Limitations of conventional 2D blasting pattern design method were analyzed, and BIM-based automatic design method was developed to overcome them. Since it was developed to facilitate modeling of all safety facilities along a alignment using coordinates and GIS data, it can overcome the limitations of the number of safety facilities that can be considered and time required for conventional design. In the conventional design, the results of borehole test blasting were used to predict the blasting impact. However, the developed technology is possible to recalculate by applying the measurement results obtained from actual tunnel blasting, enabling rapid re-evaluation of the blasting impact on all safety facilities during construction, leading economical design. As a result of applying it to GTX-A5 and 6 sites, it took about 5 minutes, which is 1/480 compared to the conventional design method. In addition, the construction cost was reduced by about 8 billion won/km and the period was reduced by about 41 days/km. It is expected to be used as technical basis for calculating the optimal blasting pattern in the BIM-based design and construction management process.

A Study on the Effect of Artificial Cutting Slot on the Fragmentation and Vibration Propagation in the Full-scaled Concrete Block Blasting (콘크리트 블록 발파 실험을 통한 인공 슬롯 자유면이 진동전파 및 파쇄효과에 미치는 영향에 관한 연구)

  • Oh, Se-Wook;Min, Gyeong-Jo;Park, Se-Woong;Park, Hoon;Noh, You-Song;Suk, Chul-Gi;Cho, Sang-Ho
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.692-705
    • /
    • 2018
  • Ground vibration is one of the remarkable issues in tunnel blasting. In recent studies, to improve the fragmentation with reduction of ground vibration in tunnel blasting, a vibration-controlled blasting method with artificial cutting slot near the center-cut holes has been suggested. This study examines the effect of the different arrangement of artificial cut-slot on the vibration reduction and fragmentation by performing the full-scaled concrete block blast experiments and the numerical simulations with 3D-DFPA. The results show that the existence of artificial slot contributes to the improvement of vibration reduction, blast fragmentation and the efficiency of the cutting slot blast. It can be explained that the artificial slot play a free surface role and should decrease the burden between the cut holes. Crater volumes of the blasted concrete blocks were measured by 3-dimensional digital image analysis and compared with the ideal standard crater volume which can be calculated by theoretical standard blast design method. As a result, the ratio of burden and hole diameter which should achieve the standard crater in the cut-hole blasting were suggested.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF