• Title/Summary/Keyword: 3D 건물 모델링

Search Result 108, Processing Time 0.023 seconds

A Low Cost 3D Skin Wrinkle Reconstruction System Based on Stereo Semi-Dense Matching (반 밀집 정합에 기반한 저가형 3차원 주름 데이터 복원)

  • Zhang, Qian;WhangBo, Taeg-Keun
    • Journal of Internet Computing and Services
    • /
    • v.10 no.4
    • /
    • pp.25-33
    • /
    • 2009
  • In the paper, we proposed a new system to retrieve 3D wrinkle data based on stereo images. Usually, 3D reconstruction based on stereo images or video is very popular and it is the research focus, which has been applied for culture heritage, building and other scene. The target is object measurement, the scene depth calculation and 3D data obtained. There are several challenges in our research. First, it is hard to take the full information wrinkle images by cameras because of light influence, skin with non-rigid object and camera performance. We design a particular computer vision system to take winkle images with a long length camera lens. Second, it is difficult to get the dense stereo data because of the hard skin texture image segmentation and corner detection. We focus on semi-dense stereo matching algorithm for the wrinkle depth. Compared with the 3D scanner, our system is much cheaper and compared with the physical modeling based method, our system is more flexible with high performance.

  • PDF

Production of Flood Expectation Map in the Reclaimed Land Using 3-D Spatial Information (3차원 공간정보를 이용한 해안 매립지역 침수예상도 제작)

  • Lee, Jae-One
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.4
    • /
    • pp.97-102
    • /
    • 2007
  • Recently, coastal damage according to the natural disaster like storm-surge, overflowing of the sea has been massively increased. In case of earth fill at the seaside, there are a lot of weak areas of the natural disaster and it has also high possibility that a large disaster happens. Thus flood expectation map in the reclaimed land using 3D spatial information was produced in this study. The area around Myungji, Kangsugu, Busan which was made with the large scale earth fils at the seaside was designated as a study area. Observation of both costal datum and ground height using the tidal date and field surveying dates was conducted. Terrain model using the GIS program was produced and than 3D building model was produced using 3D MAX. It was shown that there are possibility more than 50% if over 4.5m storm-surge is happening, as a result of calculating the virtual flooded area on the produced cartographic map.

  • PDF

Analysis of Economical Efficiency of Digital Map in Production Cost by Aerial LiDAR Surveying (항공 LiDAR 측량에 의한 수치지도 제작의 경제성 분석)

  • Kang, Joon-Mook;Yoon, Hee-Cheon;Lee, Jin-Duk;Park, Joon-Kyu
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.1 s.39
    • /
    • pp.67-73
    • /
    • 2007
  • Recently, three-dimensional (3D) GI (Geospatial Information) using LiDAR system has been used various fields such as the production of digital map, the modeling of 3D building and urban area, and analysis of communication network and environmental effect. In this study, the production cost of digital map by aerial LiDAR surveying were compared with the cost by aerial photograph surveying for analysis of economical efficiency. It is expected that the results of this study will be used base data for production, update, revision of digital map and curtail effect of national budget.

  • PDF

A Study on Light-weight Algorithm of Large scale BIM data for Visualization on Web based GIS Platform (웹기반 GIS 플랫폼 상 가시화 처리를 위한 대용량 BIM 데이터의 경량화 알고리즘 제시)

  • Kim, Ji Eun;Hong, Chang Hee
    • Spatial Information Research
    • /
    • v.23 no.1
    • /
    • pp.41-48
    • /
    • 2015
  • BIM Technology contains data from the life cycle of facility through 3D modeling. For these, one building products the huge file because of massive data. One of them is IFC which is the standard format, and there are issues that large scale data processing based on geometry and property information of object. It increases the rendering speed and constitutes the graphic card, so large scale data is inefficient for screen visualization to user. The light weighting of large scale BIM data has to solve for process and quality of program essentially. This paper has been searched and confirmed about light weight techniques from domestic and abroad researches. To control and visualize the large scale BIM data effectively, we proposed and verified the technique which is able to optimize the BIM character. For operating the large scale data of facility on web based GIS platform, the quality of screen switch from user phase and the effective memory operation were secured.

Strategy and Technology for Digital Transformation of Design and Construction of RC Structures (철근콘크리트골조 설계와 현장관리 디지털전환 전략과 기술개발)

  • Chee Kyeong Kim
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.4
    • /
    • pp.265-272
    • /
    • 2023
  • This paper presents a conceptual strategy and technologies for the digital transformation of design and construction of reinforced concrete (RC) structures. The development of an automated detail design strategy for RC structures is described. Integrated digital platform based on 5D BIM concept is proposed for the replacement of the current technology environment-based 2D CAD. Generally, the detail design development is labor-intensive and iterative. Effective automation of relevant aspects can dramatically improve productivity and accuracy. The proposed solutions for the automated BIM modeling based on the rebar and formwork detail design automation achieves the productivity and accuracy sufficient for site application. The platform integrates and manages the information flow between each solution or application and provides it to all participants of the project. Finally, it is expected that the proposed strategy and technologies can be further enhanced to achieve the productivity and accuracy needed for widespread site application and digital transformation.

Application of Photo-realistic Modeling and Visualization Using Digital Image Data in 3D GIS (디지털 영상자료를 이용한 3D GIS의 사실적 모델링 및 가시화)

  • Jung, Sung-Heuk;Lee, Jae-Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.1
    • /
    • pp.73-83
    • /
    • 2008
  • For spatial analysis and decision-making based on territorial and urban information, technologies on 3D GIS with digital image data and photo-realistic 3D image models to visualize 3D modeling are being rapidly developed. Currently, satellite images, aerial images and aerial LiDAR data are mostly used to build 3D models and textures from oblique aerial photographs or terrestrial photographs are used to create 3D image models. However, we are in need of quality 3D image models as current models cannot express topographic and features most elaborately and realistically. Thus, this study analyzed techniques to use aerial photographs, aerial LiDAR, terrestrial photographs and terrestrial LiDAR to create a 3D image model with artificial features and special topographic that emphasize spatial accuracy, delicate depiction and photo-realistic imaging. A 3D image model with spatial accuracy and photographic texture was built to be served via 3D image map services systems on the Internet. As it was necessary to consider intended use and display scale when building 3D image models, in this study, we applied the concept of LoD(Level of Detail) to define 3D image model of buildings in five levels and established the models by following the levels.

Precise Modeling of Buildings Using a Terrestrial LIDAR (지상 라이다를 이용한 건물의 정밀 모델링)

  • 이임평;최윤수;사석재;오의종
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.491-500
    • /
    • 2004
  • As the applications of 3D GIS rapidly increase, the need for acquisition and continuos update of urban models is increasingly emphasized. Particularly, building models has been considered as the most crucial component of urban models. Many researchers thus have focused on building extraction from mainly aerial photos or airborne LIDAR data but so far mostly failed to achieve satisfactory results in terms of both completeness and precision because of the intrinsic limitation of the sensory data themselves. Therefore, instead of the airborne sensors, we utilize a terrestrial LIDAR to generate precise and complete building models. This paper presents the overview of the sensors for data acquisition, describes data processing methods for building modelling from the acquired data and summerizes the experimental results.

  • PDF

Analysis of Energy Saving according to Control Method of Lighting Control System using Daylight (자연광을 이용한 조명제어시스템의 제어방법에 따른 에너지 절감률 분석)

  • Moon, Seung-Mi;Kwon, Sook-Youn;Im, Kyoung-Mi;Lim, Jae-Hyun
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06d
    • /
    • pp.462-464
    • /
    • 2012
  • 최근 건물 내 에너지 소비량의 30%를 점유하고 있는 조명 에너지 절감을 위해 자연광을 이용하여 인공조명의 의존도를 낮추고 에너지 사용을 최소화하기 위한 다양한 연구가 진행되고 있다. 이에 본 논문에서는 조명 에너지 소비 절감 및 재실자의 작업 능률 향상을 위해 조명시뮬레이션 소프트웨어인 Relux를 이용하여 소규모 사무 공간을 3D로 모델링하고, 이를 기준으로 시간대별 자연광의 유입량에 따라 조명장치를 점멸제어, 조광제어, 스텝제어의 다양한 제어방법을 적용하여 반복적인 시뮬레이션 과정을 통해 각 제어방법에 따른 에너지 절감률을 비교 및 분석하였다. 분석 결과 조광제어가 60.5%로 가장 높은 에너지 절감률을 보였다.

Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project (초고층 복합시설물의 4D CAD 모델링 사례연구)

  • Kwan Oh-Sung;Park Woo-Yul;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.187-192
    • /
    • 2001
  • High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

  • PDF

Seismic Response Analysis for Three Dimensional Soil-structure Interaction System using Dynamic Infinite Elements (동적 무한요소를 이용한3차원 지반-구조물 상호작용계의 지진응답해석)

  • Seo, Choon-Gyo;Ryu, Jeong-Soo;Kim, Jae-Min
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.12 no.6
    • /
    • pp.55-63
    • /
    • 2008
  • This paper presents a seismic analysis technique for a 3D soil-structure interaction system in a frequency domain, based on the finite element formulation incorporating frequency-dependent infinite elements for the far field soil region. Earthquake input motions are regarded as traveling P, SV and SH waves which are incident vertically from the far-field soil region, and then equivalent earthquake forces are calculated using impedances of infinite soil by dynamic infinite elements and traction and displacement from free field response analysis. For verification and application, seismic response analyses are carried out for a multi-layered soil medium without structure and a typical nuclear power plant in consideration of soil-structure interaction. The results are compared with the free field response using a one-dimensional analytic solution, and a dynamic response of an example structure from another SSI package.