• Title/Summary/Keyword: 3차원 경관시뮬레이션

Search Result 34, Processing Time 0.016 seconds

The Environmental Impact Assessment of at Road Design in the Light of the Sense for the Real from the Virtual Reality (환경영향평가를 위한 VR기법으로 현실감을 고려한 도로설계)

  • Choi, Hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.10
    • /
    • pp.1842-1847
    • /
    • 2006
  • This paper is the environmental impact assessment of at road design in the light of the sense for the real from the virtual reality. For In this papers, This study developed 3D-model and virtual reality contents by suggesting the environmental impact assessment based on GIS in the road design. Ant through this process, it's possible to visualize the environmental impact assessment by constructing the 3D-model and simulation. The 3D-model can be a method to show the road effectively by maximizing the road's shape visually after the construction. The main construction which composes polyhedron model that is generated from digital map and aerial photo is built by mapping the real texture, so the Sense for the Real was more heightened. Through this study, it must be made to shorten a long time exhausting period of conference and construct more real road after due scene consideration by specific and various low-cost strategy in the environmental impact assessment afterwards.

Location Selection for Residential Development with AHP and GIS Analysis Modeling Method (계층적 GIS분석 모델링에 의한 주거지개발 적지선정)

  • Han, Seung-Hee
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.4
    • /
    • pp.440-447
    • /
    • 2011
  • Selecting a suitable place is to determine the attributive conditions and qualified areas for the aim as factors and is to be fulfilled systematically for selecting the area which satisfies all these. This research tries to achieve a rational suitability analysis of residential development using the GIS modeling method and the hierarchical analysis process. A spatial and attributive analysis has been systematized for selecting a suitable place for the study and GIS analysis model has been used for the effective conclusion drawing for different levels. As a next step, a quantitative and qualitative evaluation index was created through complex consideration of the criteria and decision factors of the location selection, and weights were added depending on the relative importance of these factors. In particular, 3D terrain model simulation method has been used in order to reflect the aesthetic factors of the scenery which is an element of the subjective evaluation factors and considered qualitative and subjective evaluation factors which were not considered for the existing AHP technique. After the research, a location that satisfies complex requirements was found rapidly and accurately through the GIS model and hierarchical analysis.

Orthophoto Application for Geo-spatial Information Acquisiton of Construction Area(DAM) (공사지역(댐)의 지형정보구축을 위한 정사영상의 활용)

  • 한승희;이형석;이성순
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.395-403
    • /
    • 2000
  • It is so sensitive that the matter of compensation for private possessions caused in the course of public construction planning is very important. Especially, more logical planning is necessary when the dam be constructed, because it is mainly controlled by the surface of water, and if that planning is made public, artificial change is occurred in land use in that area for the purpose of rising the compensation. In this study, the plan for the application of aerial photo based ortho image was drew up for solving these problems and for the rational, rapid compensation. Ortho image was made by aerial photo, used as reading material for the change in land use. The modeling of drainage basin, came under the planning surface of water, and the 3D simulation were performed for the scene analysis, the change understanding in land use for a lot number in a certain period by overlapping the digital image, the digital land registration map, and the digital topography map as well as the analysis of the admitted land followed by the height of reservoir water.

  • PDF

Landscape Assessment and Improvement of the View Area by Selecting the Landscape Control Point (조망점 선정을 통한 대상지의 경관가치 평가 및 개선방안)

  • Kim, Jin-Hyo;Lee, Hyun-Taek;Ra, Jung-Hwa;Cho, Hyun-Ju;SaGong, Jung-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.5
    • /
    • pp.19-32
    • /
    • 2012
  • The purpose of this study is to quantitatively measure the view target and the view area through the selection of landscape control point by selecting Jimyeong-dong Dong-gu and Yeongyeong-dong Buk-gu Daegu, which are planned as the large scale housing complex development area, as the target places. It is very meaningful that from the simulation based on this measurement, the improvement methods are attempted to be suggested at the project level. The results of this study are as follows. First, the total number of viewing targets derived from the literature analysis for the selection of the viewing targets was 24, and finally derived main viewing targets were 4 places. Second, the total number of selection criteria of the derived landscape control point was 15, and these were re-categorized as prospect, accessibility and publicness according to the common property. The preliminary LCPs were selected by measuring the publicness and accessibility, and because of the said measurement, a total of 43 preliminary LCPs were selected. The final LCPs were selected by estimating the prospect of the selected preliminary LCPs, and as a result of estimation, a total of 29 final LCPs were selected. Finally, the total number of evaluation indicators derived from literature analysis was 26. Because of the valuation by the landscape control point, it was found that the 2 view areas were the I grade, 3 areas were II grade and 3 areas were the V grade, the lowest grade among 29 view areas. From the analysis on problems for the improvement methods, 4 improvement-indicators including the diversity of land mosaic were selected for the view area-1 without considering the development project drawing. In addition, for the view area-2 with considering the development project drawing, the landscape as the scenery forests was well formed, and the arrangement of architectures for the security of view corridor was right angle arrangement, and their floor number was 10.