• 제목/요약/키워드: 2D engineering drawings

검색결과 99건 처리시간 0.023초

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.

드론 화상 및 LiDAR 스캐닝의 정합처리 자료를 활용한 노후 구조물 3차원 정밀 모델링에 관한 연구 (A Study on the 3D Precise Modeling of Old Structures Using Merged Point Cloud from Drone Images and LiDAR Scanning Data)

  • 신찬휘;민경조;김경규;전푸른;박훈;조상호
    • 화약ㆍ발파
    • /
    • 제40권4호
    • /
    • pp.15-26
    • /
    • 2022
  • 최근 건축물의 노령화에 따른 건물 전체 기능저하와 화재 및 지반침하와 같은 재난에 따른 건축물의 안정성 저하로 구조물 해체 수요가 급격히 증가하는 추세이다. 특히, 구조물 구성부위의 변형이나 손상의 정도가 심각한 구조물은 부재 내 집중하중이 발생하여 구조물 전체의 안정성이 저하되어 빠른 시일 내에 안전하게 구조물 해체가 가능한 시공기술에 대한 수요가 증가하고 있다. 또한, 노후 구조물에 대한 비인가 증축이나 불법 개조와 같은 구조적 변경으로 시공 당시 건물의 설계도면과 상이한 경우가 빈번하다고 보고되어오고 있다. 본 연구에서는 해체 대상 구조물의 시공 당시 도면과 현 시점 구조와의 차이점을 보완하기 위하여, 실내외 구조 표면에 대한 실측값을 활용하여 3차원 모델을 역설계하는 기법을 제안하였다. 실제 해체 시공 예정인 건축물을 대상으로 구조물 외곽에 대하여 드론 촬영을 실시하고 구조물 내부는 LiDAR 스캐닝을 수행하여 건물외곽과 실내에 대한 점군데이터를 획득한다. 각각 점군데이터는 Smartmapper를 활용하여 정밀하게 정합되며 2차원 도면제작과 3차원 구조해석용 모델 작성에 사용된다. 제안된 역설계 기법을 검증하기 위하여 드론화상자료, LiDAR 스캐너자료, 정합자료로부터 생성된 3차원 모델과 실측된 부재간의 거리를 비교하였다.

UAV Utilization for Efficient Estimation of Earthwork Volume Based on DEM

  • Seong, Jonghyeun;Cho, Sun Il;Xu, Chunxu;Yun, Hee Cheon
    • 한국측량학회지
    • /
    • 제39권5호
    • /
    • pp.279-288
    • /
    • 2021
  • In the era of the 4th industrial revolution, smart construction, in which new technologies such as UAV (Unmanned Aerial Vehicle) are fused, is attracting attention in the construction field. However, the method of estimating earthwork volume using DEM generated by UAV survey according to practical regulations such as construction design guidelines or standard product counting is not officially recognized and needs to be improved. In this study, different types of UAV were measured and DEM was obtained using this data. The DEM (Digital Elevation Model) thus obtained was analyzed for changes in the amount of earthworks according to the size of the GSD (Ground Sample Distance). In addition, the amount of earthwork by DEM and the amount of earthwork by existing design drawings were compared and analyzed. As a result of the study, it was suggested that images with a GSD of 5cm or less are effective to generate a high-quality DEM. Next, as a result of comparing the earthwork volume calculation method using DEM and the earthwork volume based on the existing 2D design drawings, a difference of about 1% was shown. In addition, when the design earthwork amount calculated by the double-section averaging method was compared with the designed earthwork amount using DEM data by UAV survey, a difference of about 1% was found. Therefore, it is suggested that the method of calculating the amount of earthworks using UAV is an efficient method that can replace the existing method.

건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구 (A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case)

  • 정희웅
    • 한국건축시공학회지
    • /
    • 제22권4호
    • /
    • pp.347-358
    • /
    • 2022
  • 국내 건축물 설계 및 시공단계에서의 BIM 적용에 대한 건설 전반적 운영의 기대치인 설계 BIM의 재활용 및 시공단계에서 필요한 견적, 공정 등의 정보 추출 및 활용을 만족하기에는 연계되는 모바일 기술이나 단말기기의 현장 보급 및 적용이 부족한 상태이다. 따라서 본 연구에서는 이러한 BIM 세부 업무 프로세스에 대해 모바일 기술 적용의 4D 시뮬레이션 및 Test-Bed 신축건축물 대상으로 기획·계획·기본·실시설계 및 시공단계에서 3차원 3D와 공정관리 4D 시뮬레이션 및 5D 물량산출 BIM 모델과 라이브러리를 구축하고, 시공단계에서 BIM 모델을 통한 간섭체크 등 다양한 시공성 검토를 보다 효과적으로 활용하는 건설업무의 BIM 프로세스에 대한 표준화 수립을 제시하는데 목적이 있다.

중소규모 건설회사 CAD 활용현황과 대학교육 방안 (Survey on CAD Softwares Used in Small Contractors and Improvement to College CAD Education)

  • 최희복;장명훈
    • 한국건축시공학회지
    • /
    • 제16권2호
    • /
    • pp.169-175
    • /
    • 2016
  • 건축공학을 전공한 학생들이 보유해야할 CAD 활용능력을 조사하기 위해 제주지역 중소규모 건설회사를 대상으로 설문을 실시하였다. 소규모 건설회사는 CAD 소프트웨어를 사용하여 기존 도면을 수정하고 있다. 또한 지방의 국립대학의 CAD 수업현황을 분석하였다. 기존의 CAD 수업은 4시간 또는 6시간으로 진행하고 있으며 AutoCAD를 주로 사용하고 있다. CAD 수업은 6시간 실습이 필요하다고 판단되며 2D 도면 작성이 주요 실습내용이 되어야 하고 3D 모델 작성도 수업에 편성되어야 한다. 수업의 결과를 평가할 수 있는 방법의 개선도 필요하며, 인터넷을 활용하거나 스마트폰을 이용한 실시간 피드백을 대안이 될 수 있다.

냉각탑용 축류팬 형상 정밀도 측정 시스템 (Surface Profile Measuring System for Axial Fan of Cooling Towers)

  • 강재관;이광일
    • 한국정밀공학회지
    • /
    • 제22권4호
    • /
    • pp.151-158
    • /
    • 2005
  • An important component of a cooling tower is an axial fan, and there happens distortion in its shape which brings significant loss of efficiency. In this paper, a surface profile measuring system for large size axial fan of cooling towers is developed. A laser sensor is used as a measuring device and aluminum profiles and stepping motors are engaged into the system as frame structure and driving devices respectively. The measuring data are compared to the design data to compute the distortion of the axial fans. Two types of errors, axial and twist errors, are used to represent the precision of axial fan distortion. Genetic algorithm is used to solve the optimization problem during computing the precision. Results are displayed three dimensionally in a solid-modeler as well as 2-D drawings to help users find it with ease.

레이저 센서를 이용한 냉각탑용 축류팬 형상 정밀도 측정 시스템 (A Precision Measuring System using Laser Sensor for Axial Fans of Cooling Towers)

  • 이광일;강재관
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2003년도 춘계학술대회 논문집
    • /
    • pp.925-928
    • /
    • 2003
  • In this paper, a precision measuring machine for large sized axial fans of cooling towers are developed. A laser sensor is used as a measuring device and aluminum profiles and stepping motors are engaged into the system as frame structure and driving devices respectively. 3-dimensional measuring data are compared to the design data to compute the distortion of the axial fans. Two distortions such as the axis of the fan and the airfoils along the axis are introduced to define the shape precision of axial fans. Genetic algorithm is used to solve the optimization problem during computing the distortion. Results of distortion are displayed 3 dimensionally in a solid-modeler as well as 2-D drawings to help users find it with case.

  • PDF

초기 신체 구조 모델을 기반으로 한 신체 블록의 물량 정보 생성 및 블록 탑재 시물레이션 (Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection Based on the Initial Hull Structural Model)

  • 노명일;이규열
    • 대한조선학회논문집
    • /
    • 제43권1호
    • /
    • pp.103-118
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed using 2D drawings, based on the data of parent ships, and subjective intuition from past experience. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection based on the initial hull structural model(3D CAD model), were developed in this study. Here, the initial hull' structural model was generated from the initial hull structural CAD system early developed by us. To evaluate the developed methods. these methods were applied to corresponding processes of a deadweight 300,OOOton VLCC. As a result. it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

객체지향 Data Base를 이용한 토목자재 정보의 이용방안 연구 (A Research on how to turn Object oriented Database of civil materials to practical use)

  • 권오용;한충한;김도근;조찬원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.708-711
    • /
    • 2008
  • 본 연구는 토목공사의 설계, 시공업무에 자재정보 이용 방안 연구를 목적으로 한다. 본 연구 내용 및 결과는 교량공사에 대한 객체지향 DB 적용, 및 토목자재정보의 객체지향 DB 이용방안으로 구분할 수 있다. 첫째, 교량공사에 대한 객체지향 DB 적용은 1) 도로사업 작업분류의 작업 단위를 객체로 구성하고, 각 객체는 수량산출 내역의 자재정보를 데이터로 구성. 2) PSC BEAM 교량의 상부 및 하부 구조에 대한 객체지향 DB를 구성, 3) REVIT Structure 로 3D 교량 Prototype를 개발하여 자재이용 방안을 연구함. 둘째 토목자재정보의 객체지향 DB 이용방안은 설계업무 2D 도면 제작, 재료 표 작성, 구조해석 등, 시공업무, 자재선정, 자재구매, 공정관리, 및 유지관리에 이용가능성을 확인하였다, 본 연구의 결과를 교량공사 전체에 시험적용 및 추가 연구를 수행하여 결과의 신뢰성을 확보를 제안한다.

  • PDF

유도무기체계 품질 및 신뢰성 제고를 위한 개발단계 국방규격화 프로세스 개선 방안 (A Proposal to Improve Standardization Process on Defense R&D for Quality and Reliability of Missile System)

  • 조유습;김장은;윤재형;김시옥;이수림
    • 한국항공운항학회지
    • /
    • 제25권3호
    • /
    • pp.115-122
    • /
    • 2017
  • To achieve designed quality and reliability from R&D to force integration, an establishment of precise and distinct specifications and standards are required. However, the recent process of R&D standardization on defense acquisition system, has brought plenty of corrections on specifications and standards that may cause not only difficulties to production line and retardation to the military forces, but also a degradation of provided weapon systems. Therefore, a technical review should be performed by the developer, the producer, and the client, establishing the standard that include mass production requirements as well as clients' requirements. This paper propose a specified solution on process of R&D standardization, by applying a substantial FCA(Functional Configuration Audit) and PCA(Physical Configuration Audit) which implies participation of related agencies. By the improved PCA, 2,023 corrections on 74 types of QAR(Quality Assurance Requirement)s and 12,715 corrections on drawings are identified.