A Proposal to Improve Standardization Process on Defense R&D for Quality and Reliability of Missile System
![]() |
Cho, Yu-Seup
(국방기술품질원 품질경영본부)
Kim, Jang-Eun (국방기술품질원 품질경영본부) Yoon, Jae-Hyoung (국방기술품질원 품질경영본부) Kim, Si-Ok (국방기술품질원 품질경영본부) Lee, Su-Lim (국방기술품질원 품질경영본부) |
1 | Han et al. 'A Plan to Improve the Configuration Management Activity from System Development to Initial Production, to Increase Efficiency of the Defense Acquisition.' 2010 KIMST Conference. |
2 | Kim et al. 'A Study on The Mass Production Weapon System Parts Localization System Engineering Development Management Process Application based on ISO/IEC/IEEE 15288.' J Korean Soc Qual Manag Vol. 44, No.2:541-552, September 2016. DOI |
3 | Cho et al. 'A Proposal to Improve Standardization Process on Defense R&D for Quality and Reliability of Weapon Systems.' 2016 KIMST Conference. |
4 | DTaQ Technical Report DTaQ-08-1823-R, 'A Study on Korean Defense Specification Practice Standard Development Initiative', 2008. |
5 | Republic of Korea, "DEFENSE ACQUISITION PROGRAM ACT", 2014. |
6 | DAPA, "Defense Acquisition Program Administration Regulations", 2014. |
7 | DAPA, "Knowledge Management Practice Guidelines Based on System Engineering", 2011. |
8 | DTaQ Technical Report DTaQ-14-4209-Q, 'The Report on the Initial Production Quality Assurance Activities for MSAM-1K Safety and Arming Device', 2014. |
9 | DTaQ Technical Report DTaQ-15-4249-R, 'A Study of Estimating the Confidence Level According to the Hit Rate for PGM(Precision Guided Missile)', 2015. |
10 | DTaQ Technical Report DTaQ-16-4072-R, 'A Study on the Fire Number Extraction and Confidence Level of Missile and Test Method', 2016. |
11 |
ADD Technical Report ADDR-516-111946, 'Result of the PCA of |
12 |
ADD Technical Report ADDR-516-160474, 'Result of Physical Configuration Audit for |
13 | INCOSE, "System Engineering Handbook. A guide for system life cycle process and activities", Fourth edition, Wiley, 2015 |
![]() |