A Case Study of GTX A Tunnel Station Blasting with Electronic Detonator (GTX A 터널정거장에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.24-34
    • /
    • 2021
  • Electronic detonators are widely used in various construction sites due to accurate delay time. Including the cases with exceeded noise and vibration from site using electric/non-electric detonator, electronic detonators are used to improve blast fragmentation or to reduce the cost of secondary partial blasting. Furthermore, the number of cases using electronic detonators are increased for reduction of the cost and construction period by maximizing operations efficiency. This case study is about applying electronic detonators on large section station, tunnel construction site which is the part of urban area GTX A project. Although it was initially planned to utilize non-electric detonators, damage was inflicted on safety-thing. We have considered blasting method using electronic detonators as solution of this problem. By applying electronic detonators, we not only satisfied environmental regulations but also prevented nearby safety-thing from getting damaged. In addition, we were able to shorten the construction period than the initial plan by conducting single simultaneous blasting on large section station, in order to ensure safe and efficient construction.

A Case Study About Applying Electronic Detonator on Downtown Tunnel Construction Area (도심지 터널에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Heo, Eui-Haeng;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Kim, Nam-Su
    • Explosives and Blasting
    • /
    • v.40 no.1
    • /
    • pp.29-38
    • /
    • 2022
  • Electronic detonators are now widely used in various construction sites and quarry mines. Including the sites where safety-thing is located nearby, Cases of using electronic detonators are increasing to maximize operational efficiency by improving blast fragmentation or reducing the cost of secondary blasting. This case study is about applying for electronic detonators on zone 00 construction site, which is the part of urban area metropolitan express rail A line project. Although the project was initially planned to utilize non-electric detonators, Electronic detonators are considered as the solution not only for safe and fast excavation, but also to minimize civil complaint and the damage of safety-thing. By applying electronic detonators, we were able to satisfy environmental regulations standards and prevent nearby safety-thing from getting damaged.