The Behavior of Earth Retaining Walls Applied to Top-Down Construction Method Using Back Analysis (Top-Down 공법이 적용된 흙막이벽의 역해석을 이용한 거동분석)

  • Hong, Won-Pyo;Kang, Chul-Joong;Yun, Jung-Mann
    • The Journal of Engineering Geology
    • /
    • v.22 no.1
    • /
    • pp.39-48
    • /
    • 2012
  • The behaviors of a diaphragm wall and a contiguous pile wall such as CIP(Case-in-place pile) and SCW(Soil-cement wall), applied to the top-down construction method, were analyzed using the SUNEX program, which is widely used to design earth retaining walls. Four types of earth pressures, as described by Rankine (1857), Terzaghi and Peck (1967), Tchbotarioff (1973), and Hong and Yun (1995a), were applied to the analysis program to predict the lateral displacement of walls. The results show that the displacements of an earth retaining walls vary with the applied earth pressure. The predicted lateral displacement based on Hong & Yun's (1995a) earth pressure is similar to the measured displacement. Therefore, the actual lateral displacement of an earth retaining wall, as applied to top-down construction method, can be accurately predicted by using an analysis program considering Hong and Yun's (1995a) earth pressure.

A Study on Neural Networks Forecast Model of Deep Excavation Wall Movements (인공신경망 기법을 활용한 굴착공사 흙막이 변위량 예측에 관한 연구)

  • Shin, Han-Woo;Kim, Gwang-Hee;Kim, Young-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.131-137
    • /
    • 2007
  • To predict deep excavation wall movements is important in the urban areas considering the cost and the safety in construction. Failing to estimate deep excavation wall movements in advance causes too many problems in the projects. The purpose of this study is to propose the forecast model of deep excavation wall movements using artificial neural networks. The data of the Deep Excavation Wall Movements which were done form Long research is used of Artificial neural networks training and apply the real construction work measured data to the Artificial neural networks model. Applying the artificial neural networks to forecast the deep excavation wall movements can significantly contribute to identifying and preventing the accident in the overall construction work.

A Study on the Ground Improvement Effect with Grouting in Backside of Retaining Wall (흙막이 벽체 배면 그라우팅 시 지반보강 효과에 관한 연구)

  • Chu, Ickchan;Byun, Yoseph;Baek, Seungin;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.10
    • /
    • pp.77-83
    • /
    • 2012
  • Recently, excavations using propped walls were popularized in downtown due to reduced settlement of nearby structures. These excavations is induced strain to propped walls or settlement in near ground. In this study, the ground reinforcing effect was proven using NDS, which is an inorganic injection material. Injection tests were performed to compute optimum injection pressure and volume. Next, calibration chamber tests were performed by using computed injection pressure and volume, and wall behaviour was examined for overburden pressures of 50kPa and 150kPa. Ground reinforcing effect was shown when the material behind the propped wall was grouted. From test results, optimum injection pressure was 350kPa and the optimum volume was 10L considering economics. Calibration chamber test results show that after the material was grouted, the maximum settlement was reduced to 19% of the non-grouted condition. For overburden pressures of 50kPa and 150kPa behind the wall, the settlement of the wall increased by 58% and 57% when compared to the case of no overburden pressure.

Deformation Analysis of Excavated Behind Ground by The Artificial Displacement Method (II) - Numerical Analysis and Application - (강제변위법을 이용한 굴착배면지반의 변형해석(II) - 수치해석 및 적용성 -)

  • Yun, Jung-Mann
    • Journal of the Korean Geosynthetics Society
    • /
    • v.7 no.3
    • /
    • pp.31-40
    • /
    • 2008
  • The deformation behavior of the excavated behind ground due to the displacement shape of retention walls is predicted by numerical analysis, which can be performed using the artificial displacement method with elasto-plastic constitutive model. The displacement shape of the behind ground around the retention wall is similar to the displacement shape of the retention wall. However, far from the retention wall, it changes to the displacement shape of cantilever. The deformation (the settlement, the lateral movement) of the excavated behind ground can be decreased by restraining the upper displacement of the retention wall. The displacement shape of the retention wall due to excavation affects on the plastic failure zone and decreasing zone of stability of the excavated behind ground.

  • PDF

A Study on the Field Application of High Strength Joint Buried Pile Retaining Wall Method (고강도 결합 매입말뚝 흙막이 공법의 현장적용성 검토에 관한 연구)

  • Lee, Gwangnam;Kim, Daehyeon
    • The Journal of Engineering Geology
    • /
    • v.32 no.4
    • /
    • pp.671-684
    • /
    • 2022
  • This study verified the stability of a high-strength combined buried pile retaining wall and its applicability in the field. A cast-in-place (C.I.P) retaining wall and the high-strength combined embedded pile retaining wall were compared and analyzed numerically. The numerical analysis assessed the ground behavior and stability (and thus field applicability) of a high-strength combined buried pile retaining wall using data measured in the field. The experimental results showed that the cross-sectional force and displacement of the high-strength bonded pile retaining wall were reduced by 13.6~19.7%, the shear force increased by 0.7~4.7%, and the bending moment increased by 4.5~8.8% relative to the values for the C.I.P retaining wall. Examination of the amount of subsidence in the ground around the excavation showed that the maximum settlement of the C.I.P retaining wall was 46.89 mm and that at the high-strength combined buried pile retaining wall was 39.37 mm. Overall, designing a high-strength combined embedded pile retaining wall by applying the maximum bending moment and shear force calculated using the elastic beam method to the site ground was shown to achieve the safety of all members, as member forces were generated within the elastic region.

Behavior of braced wall due to distance between tunnel and wall in excavation of braced wall nearby tunnel (터널에 인접한 흙막이굴착 시 터널 이격거리에 따른 거동특성)

  • Ahn, Sung Joo;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.657-669
    • /
    • 2018
  • In recent years, the development of complex urban areas has become saturated and much attention has been focused on the development of underground space, and deep excavation is frequently performed in order to increase the utilization of underground space due to the enlargement of buildings and the high rise of buildings. Therefore, in this study, we tried to understand the behavior of the braced wall and the behavior of the tunnel adjacent to the wall according to the stiffness of the wall and the distance between the tunnel and wall. As a result of the study, the deformation of the braced wall tended to decrease with increasing the stiffness of the wall, and the axial force acting on the struts was also different according to the stiffness of braced wall. When the stiffness of the braced wall is small (2 mm), the point at which the axial force of the braces maximizes is near 0.3H of the wall. When the stiffness of the braced wall is large (5 mm), the axial force is maximum at around 0.7H of the wall. Also, the tunnel convergence occurred more clearly when the separation distance from the braced wall was closer, the stiffness of the wall was smaller, and the tunnel convergence was concentrated to the lower right part. The ground settlement due to the excavation of the ground tended to decrease as the distance between tunnel and braced wall was closer to that of the tunnel, which is considered to be influenced by the stiffness of the tunnel.

A Study on the Lateral Deformation of Retaining Walls during Excavation with Degree of Consolidation (압밀도에 따른 굴착시 흙막이벽 수평변위에 관한 연구)

  • Byun, Yoseph;Choi, Dongchan;Shin, Seungjin;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.43-51
    • /
    • 2009
  • This paper holds three objects. The first is to analyze surveys of concerning zone and promotion department. The data were collected through an examination of construction excavated in coastal soft (marine) clay and measurements obtained during excavating construction. The second is to observe the appropriate selection and the application of support system on earth retaining wall in soft clay. Lateral deformation behavior during the excavating construction according to the differences in a soft ground pressuring degree was investigated. The third is to compare the results with those of numerical analysis. Therefore, the purpose of this study is to analyze the characteristics of lateral deformation when soft ground improvement for the expansion of infrastructure in object of study zone has been incompleted. Also, it is to identify the relationship between the degree of consolidation of soft ground and lateral deformation, in a method of displacement quantity in compliance with the numerical analysis and a quatitative analysis. In conclusion, displacement of excavated section after consolidation was fewer 60% averagely than section under consolidation.

  • PDF

Numerical Analysis of the Stability of a High-Strength Joint Buried Pile Retaining Wall Method (수치해석을 이용한 고강도 결합 매입말뚝 흙막이 공법의 안정성 검토에 관한 연구)

  • Hyeok Seo;Yeongpan Ha;Junyoung Choi;Kyungho Park;Daehyeon Kim
    • The Journal of Engineering Geology
    • /
    • v.34 no.2
    • /
    • pp.249-262
    • /
    • 2024
  • Retaining walls are widely used in the construction of underground structures. This study reviews the stability of the high-strength joint buried pile method at a site in Korea. [Consider giving details of the location.] The method is assessed by considering the amount of ground settlement, as calculated by finite element analysis and measured at the site. Comparison of the measured and numerical results confirmed the method's stability and field applicability. Settlement of 13.42~13.65 mm was calculated for seven cross-sections [The Abstract should be comprehensible without reference to the main text. The labels A-A' to G-G' should not be introduced here without explanation.] using numerical analysis, and the measured settlement reached a maximum of 2.00 mm. The observed differences and variations [Please state what differed/varied.] did not exceed the design expectations in any section. Instruments installed at the back of the excavation area were used to assess the conditions. An underground gradient meter recorded a cumulative horizontal displacement of between -0.40 and 0.60 mm, and an underground water meter recorded slight displacements of between -0.21 and 0.28 m compared with the initial measurements. A surface settlement meter observed very little movement, with a maximum of -2.00 mm compared with the initial measurement, thereby confirming the establishment of a stable state within the management criteria.

A Study on Prediction of Earth Retaining Work Cost in the Project Planning Stage -Focusing on Apartment Construction Projects in Seoul- (사업기획단계에서 흙막이 공사비 예측에 관한 연구 -서울시내 아파트 건설사업을 중심으로-)

  • Lee, Jin-Kyu;Yang, Kyung-Jin;Park, Ki-Hyeon;Kim, Chan-kee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.385-392
    • /
    • 2021
  • In general, earth retaining work in construction works enables the construction of structures, prevents the displacement of the surrounding ground to the maximum extent, and plays an important role in ensuring the safety of the surrounding structures and field workers. The earth retaining work and the construction method differ according to the various ground characteristics, surrounding topographical characteristics, repair environment, and design conditions. In particular, in the case of Seoul city, the environments and ground conditions differ according to the area. This study analyzed the earth retaining work cost mainly for the apartment construction project in Seoul and calculated the approximate earth retaining work cost at the project planning stage. A model was developed to predict the cost of earth retaining work that matches the characteristics of Seoul City and predict the construction cost for earth retaining work. This paper presents the predicted earth retaining work cost using a multiple regression model that applies 10 project outlines as independent variables. The error rate of the prediction result of the earth retaining work cost of the apartment construction project in Seoul using multiple regression models was 10.75%.

The Evaluation of Damage Behaviour of Adjacent Structures in Urban Excavation (도심지 흙막이 굴착시 인접구조물의 손상 평가연구)

  • 김학문;황의석
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.351-361
    • /
    • 2003
  • Brick wall models with window opening, length 1.844m $\times$ height 0.6m, representing 2-story building was constructed on a scale of 1/10 of actual size of brick building for the investigation of damage mechanism. Six settlement troughs presenting six stages of excavation were simulated by Peck(1969) and O'Rourke et al.(1976) methods. The results from the model tests using Peck(1969) and O'Rourke et al.(1976) method indicated that angular distortion of brick wall by O'Rourke et at. method was 21% greater than that of Peck method. Horizontal displacement by O'Rourke et al.(1976) was 24% greater than that of Peck. When the degree of building damage for the O'Rourke et al. method of settlement trough is plotted on the damage level graph(Boscardin & Cording, 1989), damage level becomes much more severe than the level obtained by peck's method. Also, building stiffness and soil-structure interface are considered important factors of expressing building damage.