• Title/Summary/Keyword: 확폭

Search Result 62, Processing Time 0.015 seconds

Characteristics of the Expanded Road Embankment Constructed by Lightweight Air-Mixed Soils for a Short-Term (경랑기포혼합토로 단기간에 시공된 확폭도로성토체의 특성)

  • Hwang, Joong Ho;Ahn, Young Kyun;Lee, Young-Jun;Kim, Tae-Hyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.377-386
    • /
    • 2010
  • This study was conducted to find out the characteristics of the expanded road embankment constructed by the lightweight air-mixed soil (slurry density $10kN/m^3$) for a short-term without any ground improvement. Compression strength, capillary rise height of the lightweight air-mixed soil and settlement behavior of soft ground were studied. Compression strengths of the specimens sampled at the site after 1 and 5 months of construction were all satisfied the required strength 500 kPa. However, it was not convinced the homogeneity construction, because the values of strength were depending on the sampled location. Also, strength difference between laboratory and site specimens were found about 19%, and thus it should be considered for mixing design. Capillary rise reached about 20 cm for 70 hours because of a numerous tiny pores existed inside the lightweight air-mixed soil. Relationship between settlement and time of the soft ground placed underneath the expanded embankment was estimated by using the measured data and back analysis technique. The current average consolidation ratio and the final settlement after 120 months later were estimated about 32% and 4.5cm, respectively. This settlement is much less value than the allowable settlement 10cm for this structure.

Coupled Operation of the Lake Youngsan and Yeongam for the Flood Control in the Downstream of the Youngsan River (영산강 하류부 홍수조절을 위한 영산호-영암호 연계운영 방안)

  • Kim, Dae Geun;Lee, Jae Hyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3B
    • /
    • pp.297-306
    • /
    • 2008
  • In order to determine the effects of lock gate expansion at the Lake Youngsan and Yeongam as well as increase in the width of the connecting channel of the two lakes on flood control downstream of the Youngsan River, an unsteady hydraulic flood routing was conducted by combining the Lake Youngsan and Yeongam as a single connected system. The coupled operation of the two lakes was found to have little effect when the widths of the lock gates and the connecting channel are set at the current level. It was also found that increasing the width of the connecting channel as well as the lock gate of the Lake Yeongam is an effective means of reducing the stage of the Lake Youngsan, whereas an increase in the width of the Lake Youngsan's lock gate had a relatively smaller effect. The extended width of the connecting channel leads to a rise in the stage of the Lake Yeongam. In order to reduce the elevated stage, The Lake Yeongam's lock gate must be expanded along with the Lake Yeongsan's lock gate. The analysis found that the stage of the Lake Yeongsan can be effectively controlled through adjustment of opening and shutting criteria of the connecting channel's lock gate, when diversion discharge between the lakes is increased as a result of expanding the width of the connecting channel.