• Title/Summary/Keyword: 확폭

Search Result 62, Processing Time 0.029 seconds

A remedy measure for large cavities of an existing tunnel (기존터널의 대규모 공동 처리대책)

  • You, Kwang-Ho;Park, Kwang-Joon;Lim, Chul-Soon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.3
    • /
    • pp.241-250
    • /
    • 2007
  • During enlarging an existing tunnel under operation, unexpected excessive overbreaks and large cavities around the tunnel were found. It was an issue that they might influence the stability the new tunnel. The overbreaks and cavities are assumed that they were attributed to excessive blasting under the condition of insufficient ground investigation. To enlarge the existing tunnel safely, therefore, a remedy measure for the overbreaks and cavities is suggested.

  • PDF

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

An Analysis of Effectiveness of Geometric Improvement on Horizontal Curves in Two-Lane Highway (2차로도로 평면선형 구간의 기하구조 개선대책별 효과평가)

  • Shim, Kywan-Bho;Choi, Jai-Sung
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.33-46
    • /
    • 2008
  • A two-lane highway has a high rate of head-on collisions, sideswipe collisions, crashes with an fixed object. This study was to analyze the weakness of a cross section and a horizontal curve in a two-lane highway and find countermeasures to improve the traffic operations and safety. This study evaluated the effectiveness of widening, curve flattening and superelevation, verified it with a case study and assessed the economical efficiency. This study selected the difference between tangent section operating speeds and curve section operating speeds as an evaluation index of horizontal curve section in a two-lane highway. The results indicated that curve flattening is the best way to improve the traffic safety in a two-lane highway. This study has implication that it provides the quantitative effects of curve flattening. Also directions for future study were discussed.

  • PDF

Hydrodynamic Changes in the Keum River Estuary (2) - By Numerical Model Tests - (금강하구역의 수동역학적 변수 (2) -수치실험을 중심으로-)

  • 서승원
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.10 no.1
    • /
    • pp.18-26
    • /
    • 1998
  • In order to find out hydrodynamic changes due to huge complex constructions in the Keum River Estuary, two-dimensional finite element model is applied. Model results show that gate closing of the estuary dam yields tide amplifications at Kunsan Inner Port to 17 cm and 6 cm of M$_2$ and S$_2$, while 5 cm and 3 cm of amplification at Kunsan Outer Port. Tidal currents in the main channel due to stepwise flow-guide dikes construction have been simulated and show that dynamic equilibrium bottom shear stress is 0.4 N/m$\^$2/ on this Keum River Estuary. Sedimentation rates R have correlation with maximum bottom shear stress (equation omitted), R=-0.37-0.40 ln $\tau$.

  • PDF

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

Effect of widening excavation in divergence section of a double-deck tunnel on its stability (복층터널 분기구 확폭구간 굴착에 따른 안정성 영향)

  • La, You-Sung;Kim, Yunhee;Lee, Kangil;Kim, Yongseong;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.435-450
    • /
    • 2020
  • The divergence section of a double-deck tunnel can be divided into a 'widening pre-divergence section', a large cross-section with a cap shape and a 'post-divergence section' where the separation between the main and the branch tunnel is made. Since the cross-section of the widening pre-divergence section is considerably larger than that of the post-divergence section, the influence of excavation due to the different sizes and shapes in the cross-section should be considered in the examination of the tunnel stability. In this study, the effect of the preceding excavation, that is the excavation of the widening pre-divergence section, on excavation stability of the post-divergence section was examined by varying the excavation methods and bench lengths through 3D finite element analysis. The results showed that although the effects of the excavation methods and the bench lengths are not significant on the variation of principal stresses, the preceding excavation causes a relatively large variation on the stresses which may have an impact on the stability of the post-divergence section from the comparison of Stress-Strength Ratio (SSR) between the cases with and without the consideration of the preceding excavation effect by 2D finite element analysis.