There have been 3E problems of energy, economy and environment since the earth has its history. Especially, as the industrial society is highly developing, human need in daily life has also changed drastically. With the introduction of 40 hour working week system, more households enjoy picnics on weekends. More gas accidents take place on Saturdays and on Sundays than any other days of week. Consequently, this study tries to find out the influence of flame caused by the explosion of butane canister on the adjacent combustibles and people by simulating relevant quantity of TNT. In addition, the damage estimation was conducted by using API regulations. If the scale of the radiation heat is known by calculating the distance of flame influence from the explosion site, the damage from the site can be easily estimated. And the accident damage was estimated by applying the influence on the adjacent structures and people into the PROBIT model. According to the pro bit analyze, the spot which is 50cm away from the flame has 97% of the damage probability by the first-degree burn, 8% of the damage probability by the second-degree burn and 4% of the death probability by the fire.
Severe dust explosions occurred frequently in food processing industries and explosion damage increase by flame propagation in pipes or plants. However there are few fire explosion data available due to various powder characteristics. We investigated the characteristics of ignition and explosion on sugar, cornstarch and flour dust with high frequency accidents and high social demand. The measurements showed the median diameter of 27.56, 14.76, $138.5{\mu}m$ and ignition temperature has been investigated using by thermo-gravimetric analysis (TGA) and differential scanning calorimeter (DSC). The maximum explosion pressure ($P_m$) and dust explosion index ($K_{st}$) of sugar, cornstarch and flour are 7.6, 7.6, 6.1 bar and 153, 133, 61 [$m{\cdot}bar/s$], respectively. The flame propagation time in duct was calculated in order to evaluate the damage increase due to flame propagation during dust explosion. The explosion hazard increase due to flame propagation was higher in the order of sugar, flour and cornstarch dust.
Keeping the gas pipelines in the common utility tunnel is useful because it has a lower risk of corrosion than conventional burial, and can prevent from excavating construction. But, explosions in common utility tunnels can cause greater damage from the blast overpressure compared to outdoor explosions, due to nature of the confined environment. Despite this fact, however, research on common utility tunnels has been limited to fire hazard and little has been studied on the dangers of explosions. This study developed scenarios of methane gas explosion caused by gas leak from gas piping within the common utility tunnel followed by unknown ignition; the study then calculated the extent of the impact of the explosion on the facilities above, and suggested the needs for designing additional safety measures. Two scenarios were selected per operating condition of safety devices and the consequence analysis was carried out with FLACS, one of the CFD tools for explosion simulation. The overpressures for all scenarios are substantial enough to completely destroy most of the buildings. In addition, we have provided additional measures to secure safety especially reducing incident frequency.
Journal of Advanced Marine Engineering and Technology
/
v.35
no.8
/
pp.1117-1123
/
2011
Ungrounded power systems are adopted onboard vessels which enable more stabilized power supply even in case of electric leakage to hull. If earthing faults happen at these systems, they make grounding impedances of power lines unbalanced each other on the three phases, resulting in high voltages to hull which can bring more possibilities of electric shocks and electric fires. This study focuses on how to configure a calculation module for transferring a grounded condition by lowered insulation resistance into a vector diagram of the voltages to hull. By using the module, the loci of neutral points were acquired to analyze how voltages to hull are affected by earthing faults and the distributed capacitances between power lines and hull. The suggested module was simulated and compared to the measured values from a test power system in good results.
There are lots of energy facilities using gas(storage facility, compressed gas pipe, station, tank lorry) on the domestic. These major gas facilities cause major accidents associated with fire, explosion, toxic and etc. With the increased interest in reducing air pollution, supply of natural gas for gas vehicles is increasing. Thus, the number of establishments of LNG (Liquefied Natural Gas) and CNG(Compressed Natural Gas) stations is increasing as well. However, due to major gas accidents such as the fire and explosion accident of a Buchen LPG (Liquefied Petroleum Gas) station, it is difficult to establish a new station. In this research, we present quantitative risk assessment for LCNG;LNG multi-station and compare it result against individual risk criteria of HSE.
In the Active Pharmaceutical Ingredient(API) manufacturing company, since the product is produced by the chemical reaction, fire and explosion are frequently occurred in the process of inputting the raw powder as the chemical reaction stage. There are not many studies on safety measures through analysis of cause of accident in the actual chemical reaction stage. In this study, we investigated the heat flow in the boron removal reaction process to investigate the risk in the chemical reaction stage. The study reaction process was performed by using the reaction calorimeter for the products synthesized at the actual raw material in pharmaceutical factory. The risk was estimated by comparing the maximum temperature of the synthesis reaction, which can generate heat due to the failure of cooling in the actual manufacturing process, and the technical temperature. These results are applied to commercial manufacturing sites and safety measures to control the risk of runaway reaction due to reaction heat are suggested.
There is growing interest in solar power generation due to global warming. As a result, demand for polysilicon, which is the core material for solar cells, is increasing day by day. As the market grows, large and small accidents occurred in the production process. In 2013, hydrochloric acid leaked from the polysilicon manufacturing plant in SangJu. In 2014, a fire occurred at a polysilicon manufacturing plant in Yeosu, and in 2015, STC(Silicon Tetrachloride) leaked at a polysilicon manufacturing plant in Gunsan City. Leakage of chemicals in the polysilicon manufacturing process can affect not only the workplace but also the surrounding area. Therefore, in this study, we identified the hazardous materials used in the polysilicon manufacturing process and quantitatively estimate the amount of leakage and extent of damage when the worst case scenario is applied. As a result, the damage distance by explosion was estimated to be 726 m, and the damage distance to toxicity was estimated to be 4,500 m. And, if TCS(Trichlorosilane), STC(Silicon Tetrachloride), DCS(Dichlorosilane) leaks into the air and reacts with water to generate HCl, the damage distance is predicted to 5.7 km.
The BEF on the radial distribution line refers to a class of ground faults in which the load-side power line only is grounded, with the distribution line broken into two parts, the source-side and the load-side. Because its mechanism is remarkably different from that of other earth faults, the fault current is very low, and then difficult to detect the BEF. Thus, it is necessary to analyze its properties and to find an appropriate method that can economically protect the BEF of nonautomation area in the substation. As a result of analyzing the BEF data obtained by the RTDS, EMTP simulation, and the field test data of ETSA, we believe that it is the dominant factor in distinguishing the BEF from normal conditions by a criterion value that is appropriately handled from the zero-sequence current. Thus, with this criterion value, a BEF detecting algorithm is constructed which measures the variations of the zero-sequence current and processes then properly so as to make the fault decision. To prove the accuracy of this algorithm, it is compared with the field test data of ETSA under various conditions. The results show that the proposed algorithm is accurate.
Journal of Korean Tunnelling and Underground Space Association
/
v.9
no.3
/
pp.287-298
/
2007
Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures get longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest on safety in long tunnel has been growing and the safety standard for long tunnels is tightening. For that reason, at the planning stage of a long tunnel, the optimum design of safety facility for minimizing the risks and satisfying the safety standard is required. For the reasonable design of a long railway tunnel considering high safety, qualitative estimation for tunnel safely is required. In this study, QRA (Quantitative Risk Analysis) technique is applied to design of a long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design was carried out to verify the QRA technique for two railway tunnels.
When a ship accident occurs, it is imperative that the captain makes a prompt decision because the accident directly leads to the loss of human lives. The purpose of this study is to quantitatively analyze the main factors and to provide basic data for making decisions in case of ship related contingencies. Experts were surveyed using questionnaires containing eight main factors. The priorities based on relative importance of those factors were determined using the analytic hierarchy process (AHP). As a result, the main priority factors were capsizing (heeling occurs), and fire/explosion, which could have the greatest impact on decision making. We plan to do a larger, more detailed scale survey to improve the reliability of the results. The results above will be used as a basis for the main factors of ships and passenger evacuation decision-making procedures.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.