• Title/Summary/Keyword: 화력발전시스템

Search Result 192, Processing Time 0.025 seconds

Anticipatory Generation Control of Fossil Power Plant for Large and Rapid Recurring Load Fluctuations (부하변동이 심한 화력발전소의 예상 발전 제어)

  • 박영문;박종근;김재철;김봉희
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.35 no.6
    • /
    • pp.237-245
    • /
    • 1986
  • Most fossil steam generating units are currently being designed for base load operation and are not therefore generally suitable for large and rapid recurring load fluctuations. In particular the control systems adopted for such units are not adequate for the severe recurrent load fluctuations. In particular the control systems adopted for such units are not adequate for the severe recurrent load fluctuations that are expected by the plant supplying the power requirements of the electric are furnaces and rolling mills employed by the steel industry. This paper presents a feasible Anticipatory Control Algorithm which ensures that the fossil fuel fired plant can meet such severe requirements from the control point of view. Details of such a control algorithm and its dynamic simulation on a sample power system are also presented.

  • PDF

Drum Level Control in Thermal Power Plant (화력발전소의 드럼수위 제어)

  • Byun, S.H.;Park, D.Y.;Kim, B.C.;Shin, M.S.;Shin, S.D.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2163-2165
    • /
    • 2001
  • 화력 발전소 드럼수위의 제어는 보일러 시스템의 효율적인 운용을 위해 중요한 위치를 차지하고 있다. 드럼수위의 제어 목적은 드럼수위를 외란에 관계없이 항상 설정치로 유지하는 것이다. 정상 운전중에는 드럼의 중앙이하 부분에는 물이 차 있고, 상부에는 증기가 차 있으나 만일 수위가 너무 높아지면 carry over 현상이 발생하며 반대로 너무 낮으면 드럼 하부의 과열 및 튜브의 손상을 초래하여 대사고를 유발하게 되므로 드럼수위는 항상 정상으로 유지해야 한다. 드럼수위 제어루프는 처음에는 드림수위만을 제어입력으로 취하는 PI 제어기에 의해 이루어지다가, 주증기량이 일정량 이상 유지되면 드럼수위가 일정한 설정치를 유지하도록 급수량, 드럼수위, 주증기량에 의한 PI-PI 캐스케이드 형태의 제어로 절환되어 제어가 이루어진다. 또한 드럼 수위는 차압검출기에 의해서 측정되어지는데, 드럼의 압력에 따라 물과 증기의 밀도가 변하기 때문에 차압검출기에 의한 드럼수위 지시치는 드럼압력에 의한 보상도 요구되어진다. 본 논문에서는 중용량 화력발전소를 대상으로 드럼수위 보상과 드럼수위 제어기를 구현하고, 적용하여 실제 발전출력 증발시의 드럼수위 제어결과를 보임으로서 구현한 드럼수위 제어기의 효용성을 보인다.

  • PDF

Performance Evaluation of the IGCC PDU System by Static Process Simulation (IGCC PDU 플랜트의 정적모사를 통한 성능평가)

  • 이승종;이진욱;윤용승
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 1998.05a
    • /
    • pp.9-14
    • /
    • 1998
  • 석탄가스화 복합발전시스템(Integrated Gasification Combined Cycle, IGCC)은 기존의 미분탄 연소 발전 방식에 비해 발전효율이 5-10%이상 높고, 공해물질 배출 특성에 있어서도 SOx와 NOx를 각각 95% 및 75% 이상 감소시키고 재는 용응 슬러 형태로 처리하는 발전시스템이다. 이와 같은 고효율 및 환경 친화적인 특성으로 인하여 IGCC 시스템은 차세대 석탄화력 발전 방식으로서 각광받고 있으며, 이미 선진 공업국들은 70년대 석유파동 이후 IGCC 기술의 개발을 활발히 진행하여, 최근에는 250MW 이상 출력의 상용화급 플랜트를 가동 또는 건설 중에 있으며, 머지않아 상업화에 도달할 전망이다. 또한 국내에서도 최근 전력 수요의 급증과 전 세계적으로 확산되고 있는 환경 규제의 강화 등으로 우리의 실정에 맞는 IGCC 공정의 개발이 활발히 진행되고 있다. (중략)

  • PDF

Studies of Alkali Vapor Removal Efficiency for Various Sorbents Under High-Temperature and High-Pressure Environments (고온고압 조건에서 다양한 흡착제들을 이용한 알칼리증기 제거효율 연구)

  • 전수한;최병철;김형택
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2000.11a
    • /
    • pp.55-60
    • /
    • 2000
  • 현재 석탄화력발전 분야에서 석탄의 효율적인 이용을 목적으로 Pressurized Fluidized Bed Combined cycle(PFBC)과 Integrated Gasification Combined cycles(IGCC) 둥이 연구개발되고 있다. 특히, 가압유동층 복합발전 시스템은 석탄의 직접연소 방식으로 가격경쟁력이 있고, 신뢰성이 우수하며, 환경 친화적인 발전기술이다.(중략)

  • PDF

Management of Combined Cycle Plant in Real-Time Economic Dispatch (실시간 경제급전 프로그램에서 복합화력 처리 방안)

  • Lee, Sang-Ho;Lee, Jeong-Ho;Oh, Tae-Kyoo;Kim, Ki-Woon;Lee, Jin-Soo;Seo, Eun-Seong
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.40-41
    • /
    • 2008
  • 본 논문에서는 한국형 통합 에너지관리시스템(K-EMS)용 발전계획 응용프로그램 중에서 경제급전(Economic Dispatch) 프로그램 개발의 상세 내용을 소개한다. 특히 복합화력에서 가스터빈(GT)과 스팀 터빈(ST)의 현재출력을 고려하여 등가복합화력기로 변환하여 경제배분에 포함시키는 방안 및 데이터 이상 또는 데이터 미비 처리 방안 등을 소개한다.

  • PDF

A Study on the Step Response Model Development of a Dynamic Matrix Control(DMC) For Boiler-Turbine Systems in a Fossil Power Plant (화력발전 보일러-터빈 시스템을 위한 Dynamic Matrix Control(DMC)의 계단응답모델 선정에 관한 연구)

  • Moon, Un-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.5
    • /
    • pp.125-133
    • /
    • 2006
  • This paper presents comparison results of Step Response Model of Dynamic Matrix Control(DMC) for a drum-type boiler-turbine system of a fossil power plant. Two possible kinds of step response models are investigated in designing the DMC, one is developed with the linearization of theoretical model and the other is developed with the process step-test data. Then, the control performances of each model-based DMC are simulated and evaluated. It is observed that the simulation results with the step-response model based on the test data show satisfactory results, while the linearized model is not suitable for the control of boiler-turbine system.

The Strategy Design of Control Logic for Ultra Super-Critical Power Plant Boiler (초초임계압 발전소 보일러 제어전략 설계)

  • Park, Doo-Yong;Kim, Byung-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2008.04a
    • /
    • pp.223-224
    • /
    • 2008
  • 초초임계압 화력발전 제어계통 설계와 관련하여 보일러 제어시스템의 기본 요건인 제어전략을 구현하기 위해 현재 표준화력 500MW 제어시스템과 제어로직을 기반으로 1000MW급에서 필요로 하는 새로운 구조의 제어에 요구되는 제어전략에 대해 각종 제어 운전 모드의 구성과 각 운전 모드에서의 제어전략을 개발하고 있다. 최신제어시스템에서 중요하게 취급되는 자동 플랜트 제어(Automatic Plant Control, APE)의 각종 제어전략 구성에 중점을 두고 있으며 Unit Master Control, Boiler Master Control, Turbine blaster Control, Throttle Pressure Control, Fuel/Air Master Control, Forced Draft Fan Control, Induced Draft Fan Control, Primary Air Fan, Feed Water Master Control, Super Heater/Reheater Steam Temp Control 등의 제어전략을 논하고, 실제 프로세스 응단특성 파악을 위해 국내 신규발전소를 방문하여 수집한 프로세스 응답시험 결과와 특성을 분석하고 USC에 적용하기위한 보일러 제어전략에 대해 논하고자 한다.

  • PDF

Internet Mornitoring with Wind-Photovoltaic Power Hybrid System (풍력-태양광 복합발전 시스템의 인터넷 모니터링)

  • Yang, Si-Chang;Moon, Chae-Joo;Chang, Young-Hak;Lim, Jung-Min;Kim, Eui-Sun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.305-308
    • /
    • 2005
  • 풍력 및 태양에너지는 기존의 화력, 수력, 원자력 발전 등을 대신할 친환경적이고 공해가 없으며 양적으로도 무한한 대체 에너지원이다. 계절적인 기상변화 특성을 이용하여 풍력 발전 시스템과 태양광발전 시스템을 상호 보완시킴으로써 안정적인 전력 공급과 에너지이용 효율의 향상을 꾀할 수 있는 풍력-태양광 복합발전 시스템에 대한 관심이 고조되고 있다. 본 연구에서는 이러한 복합 발전 시스템을 효율적이고 안정적으로 운용하기 위하여 시스템의 각종 데이터들을 수집, 분석하고 파일로 저장하며 이를 인터넷을 이용하여 원격에서도 모니터링 할 수 있는 시스템을 구축한다. 여러 가지 교류와 직류의 전압, 전류들을 비롯한 풍속, 조도, 온도 등의 물리량을 측정하기 위하여 여러 형태의 변환기를 사용하였고 신호 조절 회로를 구성하였다. 데이터 수집 보드(DAQ)를 이용하여 컴퓨터로 데이터들을 읽어 들였으며, 시스템 운용을 위한 서버 프로그램과 이를 원격지에서 실시간 모니터링 및 저장된 데이터들을 다운로드 할 수 있는 클라이언트 프로그램을 작성하였다. 측정된 데이터를 시간, 기상 등의 여러 조건과 연관하여 분석하였다.

  • PDF

An Economic feasibility Analysis for New and Renewable Hybrid Energy System by using HOMER (HOMER를 이용한 신재생복합전력시스템의 경제성 분석 - Off-grid 도서지역을 중심으로 -)

  • Baek, Minho;Cho, Seulgi;Kim, Suduk
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.75.2-75.2
    • /
    • 2011
  • 국내 유인도서의 상당수는 전력의 대부분을 디젤발전으로 생산한다. 향후 발전설비의 교체 혹은 증설이 있을 경우 신재생에너지원 설비의 보급 여지가 있다. 이에 본 연구는 울릉도에 화력발전 설비만을 증설했을 경우와 이를 신재생에너지복합시스템 설비로 대체했을 때의 경제적 타당성을 비교분석한다. 우리는 복합발전 시스템을 풍력터빈, PV, 소수력발전 등의 신재생에너지 설비, Batteries, Converter와 같은 보조전원, 저장 및 back up을 위한 flywheel과 Diesel generator등으로 구성했다. 분석에 사용한 HOMER(Hybrid Optimization for Energy Renewable)는 신재생에너지복합 발전시스템 분석에 사용되며 결과를 NPC(Net Present Cost)의 오름차순으로 제시하여 발전설비구성의 조합들 중 최적의 시나리오를 보여준다. 분석결과 울릉도의 경우 신재생에너지복합 발전의 보급이 잠재적으로 가능할 것으로 보인다. 또한 계통운영의 기술적인 측면을 감안할 경우 정밀한 분석이 가능할 것이다. 따라서 본 연구는 계통운영과 경제성분석 연구의 연계를 위한 사전연구로써 그 의미를 갖는다.

  • PDF

$CO_2$ removal of coal power plant by cryogenic separation process (저온분리공정에 의한 석탄화력발전시스템의 이산화탄소 분리)

  • Park, Moung-ho;Hong, Jong-chul;Kim, Chul
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 1999.05a
    • /
    • pp.63-68
    • /
    • 1999
  • 화석연료의 배기가스로부터 온실가스를 저감할 수 있는 기술은 아민 등의 용매를 사용하여 물리 및 화학적으로 제거하거나, 막분리 등을 통하여 분리하는 기술이 이미 상용화단계에 도달하고 있지만, 이러한 기술들은 이산화탄소의 분리를 위하여 많은 에너지를 필요로 하고, 시스템의 효율을 크게 저하시키는 단점들이 있는 것으로 나타나고 있다[1]. 본 연구에서는 발전시스템으로부터 이산화탄소를 분리할 수 있는 여러 개념들에 대한 시스템설계기술의 개발을 목적으로 수행되었다[2,3]. 첫 단계로서, 기존의 개념들에 대하여 보다 단순화되어 질 수 있는 이산화탄소를 고형화시켜 배기가스로부터 분리시키는 공정을 도입하는 경우에 대한 발전시스템의 성능분석을 수행하였다.(중략)

  • PDF