• Title/Summary/Keyword: 호남고속

Search Result 111, Processing Time 0.031 seconds

Development of Optimal Train Operation System in Bottle-neck Section According to the Opening of High Speed Railway in Seoul Metropolitan Area (수도권 고속철도개통에 따른 고속선 병목구간 최적열차운행 체계 연구)

  • Chun, Chunggeun;Chung, Sungbong;NamKung, Baekkyu
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.631-637
    • /
    • 2012
  • New Opening of Suseo-Pyeongteak High Speed Railway (HSR) will be a new leap in the Korean railway history. However if this section of HSR line around Seoul Metropolitan Area opens, the confluence of new HSR and existing HSR line in Pyeongteak-Osong section will cause a bottle neck problem. In other words, the opening of Suseo-Pyeongteak HSR line will make the capacity of track reach the limit and the section of railroad between Pyeongteak and Osong will be saturated. This will also make such troubles as restricting the number of train which stops at Cheonan-Asan station. In this study, based on the train assignment theory of TVM430 signal system, the methods of calculating headway and number of train are reviewed and the plan for application of optimal operation pattern during peak hour between Pyeongteak-Osong section is also suggested. To remove the bottle neck problem in this HSR section, 3 alternatives are suggested and the expected effects and problems of each alternative are also analyzed. The results show that the troubles caused by excess of track capacity can be removed without any additional cost if the minimum headway in operating system for HSR is adopted in this section. In the future, if these alternatives are considered to the long-term plan for operating train and signal systems, this will improve the efficiency of train operation, which can remove the bottle neck in the HSR line.

철도기준점을 이용한 철도중심선형 좌표변환에 관한연구 - 호남고속철도 계획노선을 중심으로 -

  • Moon, Cheung-Kyun;Heo, Joon;Kang, Sang-Du;Kim, Sang-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1141-1151
    • /
    • 2007
  • In this paper through Honam high-speed railroad which is planned with the north and south axis, we will verify the feasibility of the coordinate conversion using railroad control points after regarding current planned-railroad as the linear central axises. From analysis, distortion of Y axis varies 21cm to 40cm diminishing to a gentle straight line, distortion of X axis varies 14cm to 29cm. Through a revision, the deviation value between the coordinates were 6mm to 9mm and it satisfied the allowable error of national geographic information institute which is following ITRF (International Terrestrial Reference Frame) and cadastral boundary survey(10cm). consequently the coordinate conversion is possible using railroad control points as common control points.

  • PDF

Deflection Limit based on Vibration Serviceability of Railway Bridges Considering the Correlation between Train Speed and Vertical Acceleration on Coach (열차의 주행속도와 차체연직가속도의 상관관계를 고려한 철도교량의 진동사용성 처짐 한계)

  • Jeon, Bub-Gyu;Kim, Nam-Sik;Kim, Sung-Il
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.545-554
    • /
    • 2011
  • In order to get dynamic serviceability of a train travelling on a railway bridge, comfort limits with the deflection of bridge and vertical acceleration on car body are proposed in Eurocode, Shinkansen design criteria, The design guideline of the Honam High-speed railway. The design guideline of the Honam High-speed railway has quoted Eurocode. Therefore it is expected that supplementation of comfort limit of railway bridge according to expansion of span length and the improvement traveling speed of trains in the future would relatively fall behind developed countries in railway. Therefore, in order to secure technological competitiveness in world market, the study was conducted to propose the deflection limit based on vibration serviceability of railway bridges that can consider bridge-train interaction and travelling speed increase. The parameter study and bridge-train dynamic interaction analysis was conducted to figure out the correlation of vertical acceleration on car body and bridge displacement according to the increase in travelling speed. Also, the trend of increasing vertical acceleration on car body according to the increase in travelling speed was confirmed, and the amplification coefficient of vertical acceleration on car body was suggested. And the deflection form and vibration of the bridge were assumed to be in harmonic motion, and transfer function and the amplification coefficient were used to develop the dynamic serviceability deflection limit of the high-speed railway bridge as a formula.

A Study on Estimation of Air Tightness for Train (철도차량의 공기압 기밀도 평가에 관한 연구)

  • Nam, Seong-won
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.576-584
    • /
    • 2016
  • In this study, we measured the air tightness of a train using pressure variation in tunnels. To estimate the air tightness of a train is essential to comprehend the pressure variation of the cabin because air tightness is strongly related with ear discomfort. If we can determine the air tightness, we can predict the pressure variation of the cabin. Also, ear discomfort is a problem that can be caused in a high speed train, as well as in Korea's Great Train Express. In this study, we compared the various international standards for ear discomfort and estimated the air tightness of each vehicle based on experimental data obtained using the ITX, KTX and KTX-sancheon(honam) vehicles. The internal pressure variation of the trains is numerically calculated using the air tightness value. The results are good compared to the experimental results. Instead of flap type ventilation, in the future, continuous ventilation equipment will be needed for speed-up.

A Review on the Performance Test of a High-Speed Planing Hull with 35 knot Speed by Appling the Streamlined Step of Hull Form (유선형 스텝 선형을 적용한 35 knot급 고속활주선의 성능평가에 대한 고찰)

  • Moon, Byung Young;Go, Ho Nam;Lee, Ki Yeol
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.30 no.3
    • /
    • pp.95-102
    • /
    • 2018
  • As a recent technical approach, a high-speed planing hull was tried to realize a friction reducing system by simultaneously actuating the triple streamlined step hull form in association with optimum speed of 35 knot planing for fishing boat. In this approach, the streamlined step hull form with triple structure of type was attached under the bottom of high-speed planing hull, while a friction resistance is reduced in the process of running at the speed of 35 knot. In addition, this research was to make a performance test as to the manufactured product and acquire the purposed values and the development items. Actually, after manufacturing the desired prototype of high-speed planing hull, the significant items, fuel efficiency (second) and amount of fuel consumption (degree) including maximum speed (knot) were estimated for a performance test. And tensile strength (MPa) and bend strength (MPa) as to the completed prototype like a high speed planing hull were also acquired during the test.

Estimating the Impact on Aviation Demand by High Speed Railroad Service in Korea (고속철도 개통으로 인한 항공수요 변화에 대한 추정)

  • Park, Yong-Hwa;Kim, Yeon-Myung;Oh, Sung-Yeol
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.6
    • /
    • pp.47-54
    • /
    • 2004
  • Recently, a large reduction in domestic aviation demand had roughly shown in the range between 34% and 75% in east central and western corridor of Korea. The reasons for the drop in air traffic demand were the provisioning of several new highway serveces and the national economic difficulties. Since April 2004, moreover, the Korea Train Express(KTX) was operated between Seoul and Daegu in the first phrase of 293Km in KTX operational distance and 258Km in air route distance. The operation of KTX significantly impacted air traffic volume, particularly on the overlapped air routes with KTX routes. This study analyzed the effects on air traffic demand in accordance with the opening of KTX by applying the Stated Preference (SP) survey method, the survey conducted prior to 8 months of the KTX initiative. Also, the comparison of the decreased demand forecast by SP analysis and actual revealed traffic volume during two months service after inauguration of KTX was conducted. The Seoul-Daegu route was analysed using the 3 variables considered access and egress time, fare rate, operational frequency. The result obtained from the analysis showed that air users would be preferred only 14%. Comparatively, however, the actual revealed air passengers after the opening KTX were remained 28%, The less "decreased demand" was caused by the instability of the KTX's operation in the initial stage. Therefore, small numbers of passenger were preferable to airservices rather than high speed railroad service.

A Study on the Status and Development Suggestions of Railway Operation Polices in the Honam-Jeonra railway Line - Focused on the commuters' train between Iksan and Jeonju section - (호남선 인접 도시구간 철도운영 현황과 시사점 - 익산~전주 구간 통근열차 중심으로 -)

  • Yang, Jun-Gyu;Lee, Kyeong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.933-941
    • /
    • 2010
  • KORAIL has improved profitability through abolition of nonprofitable route and withdraw rolling stocks, operated at that route. as a part of that process, most sections of commuters' train are gone. presently, gyeongui-line and gyeongwon-line's commuter's trains are operated. Despite the abolition, there are demands for commuters' train. so, nonprofitable route operation policies are needed to meet the demands and connect seamlessly to KTX. In this study, we consider the overall operation policies and problems of commuters' train in the past. and then, we analyze foreign nonprofitable route, connected with high speed train, operation policies and search for the development suggestions for applying to the nonprofitable route between Iksan - jeonju section at Honam and joenra line.

  • PDF

Study of the Behavior of Concrete Slab Track on Earthwork According to the Variation of Train Axle Load and Speed (열차하중, 속도변화에 따른 토공상 콘크리트 슬래브궤도의 거동특성연구)

  • Chun, Hee-Kwang;Kang, Yun-Suk;Park, Yong-Gul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.6788-6798
    • /
    • 2015
  • In recent high speed rail way, the operating speed of train is enhanced and the introduction of EMU train vehicles is increased. In addition, as expected the demand of the concrete slab track and the trend of design cross-section reduction, the clear behavior of evaluation of internal slab layer is demanded about the variation of design load and speed. The purpose of this study is to evaluate and identify the mechanical behavior pattern of concrete slab track and track-road bed with the variation of axle load and train speed. To this end, the behavior of TCL and HSB was evaluated in according to the variation of axle load and speed. And the analysis results and the data measured TCL strain sensor, which was embedded in TCL slab under installation on Honam high speed railway, was analyzed. The analysis result shows that the strain are increasing in according to the speed-up of train, and line regression was obtained from measured data. Analysis data of the state of bonding condition of slab layer and measured data was analyzed. It is conducted that the TCL layer stress of HEMU 430X, which of axle load, is lighter was similar to the stress of KTX-Honam, the standard deviation of measured stress is dramatically increased.

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF

Analysis of Aerodynamic Characteristics for determination of tunnel cross section in Honam high speed railway (호남고속철도 터널 단면선정을 위한 공기역학적 특성 분석)

  • Kim, Seon-Hong;Moon, Yeon-Oh;Seok, Jin-Ho;Jo, Hyeong-Jae;Yoo, Ho-Sik;Choi, Jeong-Hwan;Rim, Hyoung-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.313-336
    • /
    • 2007
  • Unlike a conventional railway system, a high-speed rail system experiences various aerodynamic problems in tunnel sections. Trains running at a high speed in a small tunnel, when compared with the open field, face significant air pressure, resulting in reduced operating stability and fast change in pressure inside the tunnel. These phenomena further cause some unexpected problems such as the passengers onboard feeling an aural discomfort and an impulsive noise at the tunnel exit. To solve these problems, this paper introduces analysis of aerodynamic characteristics for determination of tunnel cross section. The optimum cross-section that satisfies the criteria of aural discomfort was reviewed through lots of numerical simulation analysis. Also, the pressure inside the passenger car of a train operating on Kyungbu HSR line was measured, and the pressure inside the tunnel and the micro-pressure waves at tunnel exit were measured at Hwashin 5 Tunnel. At the same time, a test of train operation model was performed and then the measurement results and test results were compared to verify that various parameters used as input conditions for the numerical simulations were appropriate.

  • PDF