1 |
Korea Railroad Research Institute, System Performance Evaluation of Next High Speed Train, Ministry of Land, Transport and Maritime Affairs, 2013.
|
2 |
Ministry of Land, Infrastructure and Transport., Study on design standards of track systems for the high-speed railway at 400km/h, KAIA, 2015.
|
3 |
Kang Y.S. et al, Study on the Behavior of Curved Track in Honam High-Speed Line considering the Running Performance for HEMU 430-X, KAIS, Vol.14 No.8 4068-4076, 2013. DOI: http://dx.doi.org/10.5762/KAIS.2013.14.8.4068
DOI
|
4 |
Eisenmann.J, Leykauf.G, Feste Fahrbahn fur Schienenbahnen, Beton Kalender 2000, 291-326 (2000)
|
5 |
Korea Railway Network Authority, KR CODE 2012, KR C-14(Track), Korea Railway Network Authority, 2012.
|
6 |
Korea Rail Network Authority, Report of practical application design for Honam high Speed line(2nd section of track work) 2012.
|
7 |
DB Systemtechnik, Requirements Catalog for the Construction of the Permaent way(AKFF) 2002.
|
8 |
DIN 1045-1(2001), Plain, reinforced and prestressed concrete structures 2001.
|
9 |
Bernhaed Lichtberger, Track Compendium, Eurail press(Hamburg,Germany), 309-345, 2005.
|
10 |
Coenradd Esveld, Modern Railway Track 2nd Edition, MRT-Production(Netherlands), 71-108, 2001.
|
11 |
Kim J.I, Ahn S.J., Kwon J.W., Kim J.I., Analysis of the Behavior of Concrete Track on Earthwork, KSR conference 2011, 3214-3219, 2011.
|
12 |
Kwon J.W., Ahn S.J., Hwang H.S., Choi W.I., Analysis of the Behavior of Section thickness Slab Track Considering the Increase in Train Speed, KSR conference 2014, 384-389, 2014.
|