• Title/Summary/Keyword: 협의 지침

Search Result 34, Processing Time 0.02 seconds

A Mixed Method of Gap-jil Behavior in Educational Institutions : Focusing on abuse of authority (통합연구방법을 활용한 교육기관 내 갑질 행태에 관한 연구 : 권한남용을 중심으로)

  • Choi, Sung-Kwang;Choi, Ye-Na;Kim, Ok-Hee
    • Journal of Korea Entertainment Industry Association
    • /
    • v.15 no.4
    • /
    • pp.243-254
    • /
    • 2021
  • This study analyzed the abuse of authority among the types of power abuse in educational institutions in order to create an educational climate in which democracy and equality are respected and to create a better education and an equal society. First, we analyzed the concept and cause of power abuse through literature research, and then explored the cases of members of educational institutions according to the type of abuse of authority through qualitative research to derive implications. As a result, abuse of authority within educational institutions were found as follows: additional work without consultation, transfer of duties, coercive and unilateral instructions using status, instructions violating laws and guidelines, private instructions for personal convenience, specific institutions, personal rights, and privacy. Based on this analysis, a policy was proposed. First, an agreed standard for abuse of authority, an institutional mechanism to mediate conflicts and complaints over abuse of authority, mandatory installation and legislation of the best decision body, active and transparent disclosure of information, and a shift to open and listening administration are needed. Second, analyzing and seeking ways to reduce overuse of authority in educational institutions will be the cornerstone for leading education's democracy and equality by creating a culture of mutual respect and communication among members of the organization. Hope that follow-up studies will be carried out and that the Gap-jil in educational institutions will be reduced to create a better educational environment.

A Guide for Environmental Impact Assessment for the Installation of Water-friendly Facilities in River Zones (하천구역 내 친수시설물 설치를 위한 환경영향평가 검토 가이드 연구)

  • Kyoung-Ho Kim;Junyeong An;Min-Kyu Ji
    • Clean Technology
    • /
    • v.29 no.3
    • /
    • pp.227-234
    • /
    • 2023
  • Recently, local governments have recognized river zones as leisure spaces and local festival venues, and hence, the pressure for developing these zones has increased significantly. However, given the unique functionalities of river zones and the time and costs associated with maintaining facilities and restoring damaged areas, a development plan must be selected carefully. To preserve river zones and to facilitate nature-friendly space utilization, this study focused on improving environmental impact assessment (EIA), which is an institutional implementation procedure for project plans. This study prepared a draft guide for EIA by providing an overview of the research background and survey outcomes, including the status of laws and regulations on river zones, development plans, and opinions on EIA. The results showed that because strategic EIA of basic river plans is important for district designation of river zones and the scope and direction of space utilization, it is necessary to establish a more meticulous business plan before reviewing and evaluating the mini EIA linked to the future implementation of a plan to derive a reasonable assessment. Additionally, this study provides a draft guide for EIA to evaluate the suitability of water-friendly facility construction plans considering the location characteristics and to reflect the factors that can reduce the environmental impacts during the mini EIA stage. In the future, we expect that the results of this study will serve as a foundation for establishing instructions and guides for the development of nature-friendly and water-friendly facilities in river zones during the establishment of plans.

Policies to Manage Drug Shortages in Selected Countries: A Review and Implications (주요국의 수급불안정 의약품 관리제도에 관한 고찰과 한국에의 시사점)

  • Inmyung Song;Sang Jun Jung;Eunja Park;Sang-Eun Choi;Eun-A Lim;Sanghyun Kim;Dongsook Kim
    • Health Policy and Management
    • /
    • v.34 no.2
    • /
    • pp.106-119
    • /
    • 2024
  • Drug shortage is a persistent phenomenon that poses a public health risk worldwide and occurs due to a range of causes. The purpose of this study is to review key policies to prepare for and respond to drug shortages in selected countries, such as the United States, Canada, and some European countries in order to draw implications. This study reviewed the reports and articles derived from search engines and Google Scholar by using keywords such as drug shortage and stock-out. Over the last decade or so, the United States have strengthened requirements on advance notification for disruption and interruption of drug manufacturing, established the Inter-agency Drug Shortages Task Force to promote the communication and coordination of responses, and expedited drug regulatory processes. Similarly, Canada established the Multi-Stakeholder Steering Committee on drug shortages by involving representatives from central and local governments and private sectors. Canada also adopted a tiered approach to the communication of drug shortages based on the assessment of the severity of the shortage problem and released a detailed information guide on communication. In 2019, the joint task force between the European Medicines Agency and the Heads of Medicines Agencies issued guidelines on drug shortage communication in the European Economic Area. The countries reviewed in this paper focus on communication across different stakeholders for the monitoring of and timely response to drug shortages. The efforts to protect public health from the negative impact of the drug shortage crisis would require multi-sectorial and multi-governmental coordination and development of guidelines.

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.