• Title/Summary/Keyword: 현장 테스트

Search Result 348, Processing Time 0.032 seconds

A Method to Automatically Generate Test Scripts from Checklist for Testing Embedded System (임베디드 시스템 테스팅을 위한 체크리스트로부터 테스트 스크립트 자동 생성 방안)

  • Kang, Tae Hoon;Kim, Dae Joon;Chung, Ki Hyun;Choi, Kyung Hee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.5 no.12
    • /
    • pp.641-652
    • /
    • 2016
  • This paper proposes a method to generate test scripts in an automatic manner, based on checklist used for testing embedded systems in the fields. The proposed method can reduce the mistakes which may be introduced during manual generation. In addition, it can generate test scripts to test various mode combinations, which is not possible to be tested by the typical checklist. The test commands in a checklist are transformed into a test script suit referencing the signal values defined in a test command dictionary. In addition, the method to generate test scripts in sequential, double permutation and random manners is proposed useful to test the inter-operations between modes, a series of operations for a specific behavior. The proposed method is implemented and the feasibility is shown through the experiments.

Exploring Training Priority about IT Test and IT Quality Assurance Jobs (IT테스트, IT품질보증 직무분야 교육훈련 우선순위 탐색)

  • Kang, Ji-woon;Song, Hyun-kyung;Park, Jeong-hwan;Yoon, Jong-min
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.10a
    • /
    • pp.630-634
    • /
    • 2017
  • The importance of SW quality is also rising as the usage of SW is increased in the areas of society. The development of SW quality competency of the human resource is essential for ensuring the quality of SW product, and the details of it should be reflected firstly in the demands of industrial sites. In this paper, the needs assessment and the training priorities were identified by IT Test and IT Quality Assurance based on National Competency Standards(NCS). T-test, Borich's need assessment model, and the Locus for Focus Model were conducted for determining training priorities. As a result, top and post training priorities were drawn from the redundancy check and some related implications were suggested.

  • PDF

Diagnostic System for PC Motherboard (PC보드 진단 시스템 설계)

  • Lee, Woo-Young;Kim, Chang-Hoon;Choi, Young-Woong;Lee, Jae-Hoon;Kim, Seung-Jun
    • Proceedings of the Korea Multimedia Society Conference
    • /
    • 2012.05a
    • /
    • pp.99-101
    • /
    • 2012
  • 산업현장에서 최종 생산품의 신뢰성 검증단계에 사용되는 PC기반 테스트 장비들은 생산제품의 특성에 따라 인위적인 과전압 인가, 고/저온 테스트, 잦은 강제 셧다운 등 많은 스트레스로 인해 잦은 고장과 오동작을 일으킨다. 테스트 장비의 고장은 생산성 저하와 직결됨으로 신속한 고장원인의 파악을 위한 진단 시스템이 요구된다. 본 논문에서는 테스트 장비의 하드웨어 상태를 효율적으로 진단할 수 있는 하드웨어와 지식정보기반 진단결과의 분석을 통한 오류원인 및 불량파트의 범위를 줄여줄 수 있는 분석 소프트웨어를 제안한다.

  • PDF

A Study on the S/W Quality Improvement, Considering Fault Detection Rate (결함 검출비를 고려한 소프트웨어의 품질 향상에 관한 연구)

  • Che, Gyu-Shik
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.11b
    • /
    • pp.376-378
    • /
    • 2005
  • 일반적으로, 소프트웨어결함검출/제거메카니즘은 이전의 검출/제거결함과 테스트노력을 어떻게 활용하느냐에 달려있다. 실제 현장 연구로부터 우리는 테스트노력소모패턴을 추론하여 FDR의 경향을 예측할 수 있을 것으로 생각된다. 결함검출이 증가, 감소 및 일정한 것 등 광범위에 걸쳐서 나타나는 경향을 잡아내는 고유의 융통성을 가지는 하나의 시변수집합인 FDR모델에 근거한 테스트노력을 개발하였다. 본 논문에서는 FDR을 기술하고, 관련된 테스트 행위를 이러한 새로운 모델링접근법에 연합시킬 수 있다. 우리의 모델과 그리고 이것과 관련된 파라미터 분해기법을 적용한 것을 여러 가지 소프트웨어 프로젝트에서 도출한 실제 데이터집합을 통하여 시연한다. 모델들이 가중 산술, 가중 기하, 또는 가중 조화평균의 개념을 적용하여 어떻게 유도되는가를 기술한다. 그 외에도, 이러한 3개의 가중치 평균에 근거하여 유사산술의 관점으로부터 좀더 일반적인 NHPP 모델을 제안한다. 상기 3개 평균 외에 변환의 파라미터 계열을 포함한 좀더 일반적인 변환을 공식화한다.

  • PDF

Design of a Programming Language and a Compiler for Test Systems (테스트 시스템을 위한 프로그래밍 언어와 컴파일러 설계)

  • Go, Hoon-Joon;Yoo, Weon-Hee
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.8 no.3
    • /
    • pp.356-365
    • /
    • 2002
  • Test systems verify and classify the various kinds of semiconductor products. So test systems need programs that can test the various special functions of hardware modules and products. Programs can be modified, compiled and executed by engineers. Consequently, the systems needs programming languages that can be easily programmed by engineers and their compilers that can compile and execute teat programs. In this paper we discuss the environment of programming languages and their compilers for the existing domestic teat systems. We design a programming language and implement its compiler that can be conveniently used by the experienced engineers in the industry field. Experimental results show that a newly designed test system with our programming language and compiler can teat products faster than the existing test system.

A Study on the Performance Evaluation and Field Application of Synthetic Resin Formwork (합성수지 거푸집의 성능평가 및 현장 적용성에 관한 연구)

  • Kim, Tae-Hui;Ahn, Sung-Jin;Lee, Young-Do;Nam, Kyung-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.577-584
    • /
    • 2018
  • In This study, length variation test, shock test, and noise test were conducted to evaluate the performance of synthetic resin form. In addition, the handling easiness of synthetic resin form was examined through field application. Results of both thermal length variation test and shock test satisfied the KS standards. for noise test, the result of uro-form was 106.7dB(A) in average while that of synthetic resin form was 100.4dB(A) in average. It is considered that the high sound pressure level of euro-form with this noise characteristic may have negative physical and psychological impact on people who are consistently exposed in the residential area. Finally, there was no warping or bulging of the mold during concrete placement in the field application. Also, the concrete surface finish of synthetic resin form was better than that of euro-form.

A Software Framework for Verifying Sensor Network Operations and Sensing Algorithms (센서네트워크 동작 및 센싱 알고리즘 검증을 위한 소프트웨어 프레임워크)

  • Yoo, Seong-Eun
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.17 no.1
    • /
    • pp.63-71
    • /
    • 2012
  • Most of sensor networks are difficult to be debugged, verified, and upgraded once they are deployed in the fields, for they are usually deployed in real world and large scale. Therefore, before deploying the sensor networks, we should test and verify them sufficiently in realistic testbeds. However, since we need to control physical environments which interact with sensor networks, it takes much of time and cost to test and verify sensor networks at the level of resource-constrained sensor nodes in such environments. This paper proposes an efficient software framework for evaluating and verifying sensor networks in the view points of network and application operations (i.e., accuracy of sensing algorithms). Applying the proposed software framework to the development of a simulator for a smart parking application based on wireless sensor network, this paper verifies the feasibility of the proposed framework.

A Case Study on the Application of Machine Guidance in Construction Field (공사 현장에서의 Machine Guidance 적용에 관한 사례연구)

  • Kim, Wanbong;Park, Sangil;Lee, Riho;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.721-731
    • /
    • 2018
  • Manpower in domestic construction sites is becoming more and more aging. Various methods have been devised to prevent productivity and quality deterioration of construction due to absence of skilled workers and difficulty in supplying manpower. Especially, many researchers study various methods such as Machine Guidance (MG) and Remote Machine Control to improve productivity and quality. Although many prior studies have been conducted since the advent of MG, There is lack of field test in a difficult site to stakeout. In this study, field test of MG excavator was carried out at difficult site to stakeout, and productivity analysis and quality evaluation were conducted. As a result of the analysis of productivity, the minimum value was 20.5%, the maximum value was 56.9%, and the average productivity in 4 days was 38.3% higher than the standard product. As a result of the analysis of quality, the horizontal error ${\pm}1cm$ and the vertical error ${\pm}2cm$ confirmed in the previous study were verified.