• Title/Summary/Keyword: 현장시공관리

Search Result 910, Processing Time 0.025 seconds

A Review of In-Situ Characterization and Quality Control of EDZ During Construction of Final Disposal Facility for Spent Nuclear Fuel (사용후핵연료 최종처분장 건설과정에서의 굴착손상영역(EDZ)의 현장평가 방법 및 시공품질관리 체계에 관한 사례검토)

  • Kim, Hyung-Mok;Nam, Myung Jin;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.32 no.2
    • /
    • pp.107-119
    • /
    • 2022
  • Excavation-Disturbed Zone (EDZ) is an important design factor in constructing final disposal facilities for spent nuclear fuel, since EDZ affects mechanical stability including a spacing between disposal holes, and the hydraulic properties within EDZ plays a significant role in estimating in-flow rate of groundwater as well as a subsequent corrosion rate of a canister. Thus, it is highly required to characterize in-situ EDZ with precision and control the EDZ occurrence while excavating disposal facilities and constructing relevant underground research facilities. In this report, we not only reviewed EDZ-related researches carried out in the ONKALO facility of Finland but also examined appropriate methods for field inspection and quality control of EDZ occurrence. From the review, GPR can be the most efficient method for in-situ characterization of EDZ since it does not demand drilling a borehole that may disturb a surrounding environment of caverns. And the EDZ occurrence was dominant at a cavern floor and it ranged from 0 to 70 cm. These can provide useful information in developing necessary EDZ-related regulations for domestic disposal facilities.

A Self-control Safety Management Activity Model in Construction Sites through Analysis of Success Factors (건설현장 안전관리 성공요인 분석을 통한 자율안전관리활동 개선에 관한 연구)

  • Lee, Joo-Sung;Hong, Jung-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.109-117
    • /
    • 2008
  • Recently, there has been constituted the government regulations and the normative methods to control the safety management activities in construction fields, but almost of these regulations are ineffective, because of some characteristics safety management have. The needs of the times make government regulations and the normative methods change to autonomic management methods. In this context, it is significant certainly to improve the standard of safety management that is used as a tool to protect the workers from the accidents or industrial disasters in the construction field. In this research, it will be showed that the outside regulations and safety management systems of the head office have their limits to reflect the safety managements of field participants. Then, it will be presented the improved model of self-control safety management activities which is essential for success safety management.

A Study on Improvement of the Quality Management for Fire Doors (방화문의 현장품질관리 개선방안에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.93-94
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. In order to improve the on-site quality management of the fire door, we comprehensively classify the quality management items of the fire door according to the management subject and the step by stage and set the field quality management procedure, the field quality management inspection item, regulations and standardized checklists were presented.

  • PDF

Analysis of Competency Assessment Using IPA for Construction Project Managers (IPA 기법을 활용한 현장소장 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Lee, Na-Kyung;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.115-123
    • /
    • 2013
  • Changes have occurred in the professional capabilities of the construction project managers after the global financial crisis. As representatives of construction companies and projects, construction project managers have full responsibility over a construction project. Throughout its life cycle, from design through construction to completion, the business capabilities of such managers are regarded as critical elements in the changes in the country's construction economy. Therefore, this study aimed to determine the main capabilities of current construction project managers, and to analysis of its competitiveness using Important-Performance Analysis(IPA). The results of IPA were as follows; (1)capability to win new contracts and capability to collect information of new project are needed for external relation competitiveness, (2)gerentocratic management mind-set and active breakthrough are needed for internal project management competitiveness, and (3)capability to predict issues and self-improvement are needed for self discipline competitiveness. However, this work is still considered to provide the basic data that can help Korean construction companies who plan to educate the project manager's strengthen their medium and long-term capabilities.

Checklist Development for Prevention of Safety Accidents in Form Work in Small and Medium Sized Construction Sites (중소규모 건설현장의 거푸집 공사 안전사고 예방을 위한 체크리스트 개발)

  • Cho, Ye-Rim;Shin, Yoon-Seok;Shin, Jae-Kwon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.587-594
    • /
    • 2017
  • The construction industry generates the greatest number of disasters. Laborer injury at construction sites is mostly reported by small and mid-sized construction sites. Moreover, of the injuries, the greatest number is related to formwork. The objective of this study is to propose a checklist of the risk factors of formwork, in which industrial injuries occur most frequently in small and mid-sized construction sites, with which safety management can be done thoroughly. Risk factors and preventive measures are derived by analyzing 9,396 industrial disasters occurring at construction sites in Korea. The checklist drawn in this study was reviewed by five specialists in safety management, and applied to construction sites to verify its applicability. In a result, applying the checklist to the site showed that the safety management system of small and medium-sized construction sites were insufficient. It is expected to contribute to the effective safety management of small and mid-sized construction sites.

Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field (건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발)

  • Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.467-476
    • /
    • 2014
  • According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

Partner 1 - '기술 중심, 고객 중심'으로 한 단계 도약하는 기업 - 대현산업기술(주) -

  • Choe, Won-Geun
    • The Magazine for Energy Service Companies
    • /
    • s.61
    • /
    • pp.36-39
    • /
    • 2009
  • 고객 중심에서 끊임없이 고민하는 마음, 새로운 기술력과 사업개발에 앞장서는 열정, 보다 높은 곳을 향해 도약하는 희망찬 자세. 이는 대현산업기술(주)를 두고 하는 말이다. 1987년 냉 난방 및 기계시공 관리업체로 시작한 대현산업기술(주)은 2007년부터 ESCO 전문기업으로 활동하고 있으며, 현재 난방 시공 관련 분야에서 국내 선두의 기술력을 자랑하고 있다. 향후 '종합솔루션기업'을 목표로 도약하고 있는 기업. 그 신나는 현장을 찾아가 보았다.

  • PDF

The Simulation Function Analysis for BIM based construction planning (BIM기반 시공계획의 시뮬레이션 기능 분석 연구)

  • Jun, Ki-Hyun;Kim, Chang-Seob;Yun, Seok-Heon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.95-98
    • /
    • 2011
  • 건설공사 프로젝트는 사전 기획 단계, 설계, 계약, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주체에 의해 프로젝트가 진행되고 각 분야 간의 원활한 의사소통을 통한 협력 작업으로 일을 진행한다. 그러나 각 단계별 참여주체간의 협업이 어렵고 정보교류가 원활하지 못한 문제점들이 있다. 또한 건설공정은 현장여건의 변화와 불확실성으로 인해 예측이 어렵고, 보다 신뢰성이 있는 계획의 부재로 인하여 각종 세부 공정들 간의 간섭을 유발하고 계획된 일정을 준수하기 어려워 불필요한 비용의 낭비와 공사기간의 증가를 야기한다. 이러한 낭비요인을 최소화하고 건축 프로젝트를 진행하는데 있어서 효율성을 높이기 위해서는 시공계획 단계의 신뢰성을 높여야 한다. 따라서 시공전의 계획 단계에서부터 4D 시뮬레이션을 통하여 이러한 문제점들을 파악하고 개선하는 것이 중요하다. 본 연구에서는 BIM기반의 시뮬레이션 프로그램의 기능분석을 통하여 효율적인 적용과 발전과정을 알아보고자 한다.

  • PDF

A Study on the Task Variation and Social Network Analysis in the Construction Process (시공 프로세스에서 발생하는 공사변동 요인 및 네트워크 분석에 관한 연구)

  • Park, Yoona;Lee, Dongdeok;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.105-113
    • /
    • 2019
  • A construction project is a complex process consisting of interdependent tasks. If one task has variation, other tasks will be affected additionally and it is difficult to reach consensus on task variation due to the characteristics of the construction site that is going on quickly and complicatedly. Therefore, this study identified the root cause of task variation in construction process. Adjacent matrix was created with the tasks corresponding to major causes of variation, and the network analysis was performed. The results of social network analysis in the construction process can stabilize the work flow in the complex process and improve the reliability of the process plan and the project performance.

Development of Site Management System for Temporary Facility Construction Using Back Analysis (역해석을 이용한 가시설공사 현장관리 시스템 개발)

  • Yun, Youngman
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.4
    • /
    • pp.570-577
    • /
    • 2019
  • Purpose: The purpose of this study is to develop a system that enables quick on-site response using real-time decision-making by sharing the results of measurement and management performed in the field for safe temporary construction. Method: It is possible to take preemptive responses during construction by identifying the safety factors of construction conditions from measurement results and determining the risk factors such as soil properties and variability of climate change that can occur during construction by simultaneously using the back analysis method reflected in the measurement system and structural review. Result: we developed a back analysis algorithm of the SUNEX program to cope with the discrepancies between the design results and measured results due to inconsistency between site conditions and design properties, unexpected loads, and outdoor environment. The process of matching the measurement result with the analysis result can be confirmed in the safety management system. Conclusion: Gateway was used to communicate with real-time measurement results and safety management system program. It was made possible to preemptively respond to risk factors that may occur in the field.