A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.

Factors Influencing the Work Ability of Building Construction Field Managers (건축공사 현장관리자 작업능력에 영향을 미치는 요인)

  • Shin, Jung-Hyun;Lee, Woo-Hwan;Choi, Young-Wha;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.2
    • /
    • pp.150-155
    • /
    • 2014
  • The success of construction projects is heavily dependent on the work ability of the field managers who manage the execution of projects. The work ability of field managers is influenced by various elements such as job stress and individual characteristics. The purpose of this study is to reveal the factors influencing the work ability of construction field managers in Korea. Work ability is evaluated bases on the Work Ability Index(WAI) developed by the Finnish Institute of Occupational Health, while job stress is measured using the Korean Occupational Stress Questionnaire Short Form developed by the Korean Occupational Safety & Health Agency. The results showed that field managers under higher job stress have lower work abilities. In addition, it is revealed that exercise or religious practice have a positive influence on work ability. This study will help to increase the work ability and enable the efficient management of organization at building construction sites.

Analyzing the Requirements for Improving Construction Managers' Work-life Balance (건축공사 현장관리자의 근로실태 및 워라밸 분석)

  • Kim, Jae-Yeob;Lim, Hyeong-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.603-609
    • /
    • 2018
  • It has been widely-reported that the quality of life in Korea is lower than that of the economic growth. In particular, construction managers are reported to have a lower quality of life compared to people in other job types due to the specific nature of the tasks they have to carry out. These include early work attendance time and fewer holidays. In this respect, the aim of this study is to analyse construction managers' requirements on work-life balance. The results showed that the working hours of construction managers were long and their leisure hours were shorter. The requirements for work-life balance were in the order of non-working time, working time, salary, and job security. The requirements by group showed a statistically significant difference in work hours. The requirements on the shortening of work hours were highest in the group of "section chiefs and deputy heads" and lowest in the group of "department heads" and up. It is hoped that the results of this study will be used as basic data for future government-level policy making and construction companies' business directions in relation to the improvement of workers' work-life balance.

Study installing a manhole to on-site methods to assemble as use polymer concrete segment (폴리머 콘크리트 세 그먼트를 이용한 현장 조립식 맨홀 설치 연구)

  • Kim, Dong-Hun;Han, Jin-Woo
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.315-319
    • /
    • 2007
  • 지하에 설 치된 맨홀의 구조물이 노후되거나, 내부에 수 용된 시설물로 작업 공간이 협소하여 맨홀 구조물을 대개체 할 펼요가 있을 경우, 지금까지는 대부분 현장 콘크리트 타설에 의한 방법을 사용하였다. 이러한 방법은 거푸집 시공, 콘크리트 타설, 콘크리트 양생, 거푸집 철거 등의 공정이 소요되어 공사 기간이 장기화 되고, 도심지에 위치한 맨홀인 경우에는 차량과 보행자의 통행 불편을 초래하기도 하였다. 또한, 통상적으로 사용되고 있는 프리캐스트 맨홀에 비해 시공 품질이 낮아 향후 맨홀의 운용 및 유지관리에 많은 어려움을 겪는 원인이 되기도 하였다. 본 논문에서는 이러한 문제점들을 해결하기 위해, 폴리머 콘크리트를 이용하여 하부, 벽체, 상부로 구성된 다수의 세그먼트를 생산한 후, 현장에서 이들 세그먼트를 조립하여 맨홀을 설치하는 방법을 연구하였다. 가변형 거푸집을 이용한 세그먼트 제작과 조립식 블록에 의한 관구를 사용하여 현장 적용성을 높임은 물론, 프리캐스트로 생산되는 폴리머 콘크리트 맨홀 수준의 시공 품질을 확보할 수 있도록 하였다.

  • PDF

A Field Case Research by Construction Management of Underground Excavation Construction Using Inverse Analysis Method (역해석 기법을 이용한 지하굴착공사의 시공관리에 관한 현장사례연구)

  • Park, Hyun-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1089-1095
    • /
    • 2014
  • In this study, we compared and analyzed the displacement of final excavation with measured value through an inverse analysis method used in urban excavation construction. We maximized the effectiveness of the inverse analysis method, and plan to achieve cost-effective and practical construction management in the field with identical conditions. As the first stage, we suggest an example of a field which has the inverse analysis method. We applied the inverse analysis method to three different fields on which construction and measuring were finished. Of these three fields, two fields showed a very satisfactory result. However, in one field, there were significant differences between the analysis and measured value. The result of our analysis indicated that, we should unite the conditions of the inverse analysis method and field construction. We need to thoughtfully reconsider the RANKINE earth pressure application in a triangle type. This is because the uniformity of earth pressure is made by its arching effect, in the condition of the displacement of lower underground occurring widely, which is differentiated with the earth pressure conditions of RANKINE, even if the slurry wall has stiffness. Also, when recalculating the soil parameter, we should emphasize the adhesion of the weathering zone, and give experimental consideration to ground water level.

A Study of Correlation between SPT N-value and Exerted Electrical Energy Required for Ground Drilling II : Application Study (Field Pilot Test) (지반굴착에 소요되는 전기에너지와 표준관입시험 N값과의 상관관계 연구 II : 적용성 평가(현장시험시공))

  • Choi, Changho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.4
    • /
    • pp.55-62
    • /
    • 2012
  • In this application study, field pilot tests were performed to evaluate the validity of a proposed formula between the exerted electrical energy and SPT N-value based on the result of the basic study. Measurement sensors and recording system were developed to obtain exerted motor current and drilling depth in a field. By using the correlation formula proposed in the basic study, the measured motor current and boring speed were applied to predict SPT N-value and the predicted N-values were compared to SPT N-value of site exploration. From the comparisons it is verified that the exerted electrical energy to bore ground might be used to predict SPT N-value and pile tip location.

The construction management of tunnel using 3D laser scanner (3차원 레이저 스캐너를 활용한 터널 시공관리)

  • Lee, Kang-Hyun;Heo, In-Wook;Kim, Do-Hoon;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.159-176
    • /
    • 2011
  • A 3D laser scanner is widely used in various fields such as games, movies, medicines, art, design, etc. Many studies for utilizing the 3D laser scanner in the fields of civil engineering have also been carried out, for example, for systematically managing tunnel and/or bridge construction. However, since a software which is directly applicable to Korean construction system does not exist, the amount of data obtained from existing the 3D laser scanner is too much to handle in a systematic way. Therefore, in this paper, a new data processing technique was established which can rapidly and effectively treat the 3D laser scanning data. Moreover, a software that can systematically manage the tunnel construction was developed. The developed software can assess the construction quality of tunnel excavation such as under-break, over-break, cracks, leakage and efflorescence, etc. A 3D laser scanner and the developed software was applied to an in-situ tunnelling site, and verified usefulness of the 3D laser scanner. The developed software may be useful for tunnel maintenance as well as for systematic management of tunnel construction.

Engineering interpretation of critical strains in the ground based on the tunnel engineering (터널공학을 중심으로 한 한계변형률의 공학적 적용성)

  • Shin, Yong-Suk;Park, Si-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.4
    • /
    • pp.403-410
    • /
    • 2009
  • This paper discusses an application method of critical strains concept for tunnels' safety by using the values of measured displacements which are obtained in the field. The aim of this paper is to: (1) study on the engineering meanings of critical strains concept by reviewing the previous researches and application examples with measured displacement values; (2) study on the engineering reasonability of critical strains concept with the view point of a tunnel engineering and a geotechnical engineering; (3) study on the features of ground deformation due to tunneling and reciprocal relation between total displacement and measured displacement; (4) evaluate a tunnel safety by using domestic measurements collected in the field; and (5) re-evaluate the control criteria which were previously used in the field, with the view point of critical strains concept. Consequently, it was confirmed that critical strains in the ground has a reasonability and a possibility of unified or common concept with the view point of a tunnel engineering.

Development of Building Monitoring Techniques Using Augmented Reality (증강현실을 이용한 건물 모니터링 기법 개발)

  • Jeong, Seong-Su;Heo, Joon;Woo, Sun-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.3-12
    • /
    • 2009
  • In order to effectively distribute the resources, it is very critical to understand the status or progress of construction site quickly and accurately. Augmented Reality (AR) can provide this situation with information which is convenient and intuitive. Conventional implementation of AR in outdoor or construction site condition requires additional sensors or markers to track the position and direction of camera. This research is aimed to develop the technologies which can be utilized in gathering the information of constructing or constructed buildings and structures. The AR technique that does not require additional devices except for the camera was implemented to simplify the system and improve utility in inaccessible area. In order to do so, the position of camera's perspective center and direction of camera was estimated using exterior orientation techniques. And 3D drawing model of building was projected and overlapped using this information. The result shows that by using this technique, the virtual drawing image was registered on real image with few pixels of error. The technique and procedure introduced in this paper simplifies the hardware organization of AR system that makes it easier for the AR technology to be utilized with ease in construction site. Moreover, this technique will help the AR to be utilized even in inaccessible areas. In addition to this, it is expected that combining this technique and 4D CAD technology can provide the project manager with more intuitive and comprehensive information that simplifies the monitoring work of construction progress and planning.

A Study on the Quality Control Effectiveness in the High-rise residential-commercial Complex Building Project (초고층 주상복합건물의 품질관리 효율성에 관한 연구)

  • Kim, Suk-Hoi;Im, Chil-Soon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.4
    • /
    • pp.79-87
    • /
    • 2007
  • The object of this study is to understand of the effectiveness characteristic in the field work which is controlled by the quality in the high-rise residential-commercial complex building. From the previous study, the quality improvement factors are investigated. Through the structured questionnaire, the opinions of the field engineers(University, Design firms, Construction company) are gathered in the improvement factors of construction phase. Comparing the results of questionnaire with the conception of field engineers, this study helps in revising and improving the quality control system including tangible factors and intangible factors in the frame work of the high-rise residential-commercial complex building project.