Cable Tension Force Management Using Vibration Method at Cable Stayed Bridge Construction Stages (진동법을 이용한 사장교 시공단계별 케이블 장력관리)

  • Park, Yeon-Soo;Cheon, Dong-Ho;Cheon, Yang-Bae;Kang, Kyoung-Koo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.4
    • /
    • pp.127-134
    • /
    • 2005
  • Design and construction of long-span bridge are recently increasing by development of computer technology. Specially, cable stayed bridge and suspension bridge having cable component are representative of long-span bridge may do. Therefore, this paper a present a methodology for cable tension force monitoring in cable-stayed bridge under construction using acceleration data acquired by the vibration method. To improve accuracy construction, all stay cables are measured, according to 4-step construction stage and change of temperature.

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

Research Of Construction Quality Execute Management A Plan Using TS (TS를 활용한 건설공사 품질시공 관리방안에 관한 연구)

  • 김감래;이재기;장우영
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.04a
    • /
    • pp.485-488
    • /
    • 2003
  • 본 연구는 건설공사의 경계점 및 구조물의 기준점을 TS를 활용하여 현장 측지좌표체제를 탈피지적좌표로 전환 관리하여 토지경계분쟁 문제의 사전제거 및 공사품질시공관리에 향상을 기하고자 연구하였다.

  • PDF

Improvement Prospect and Problems of Revegetation Method in the Cutting Slope (절토사면의 보호 및 녹화공의 문제점과 개선방향)

  • 전기성;유병옥;황영철;김태수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11b
    • /
    • pp.123-135
    • /
    • 2000
  • 절토사면 보호.녹화공의 개념과 분류체계가 아직까지 확립되어 있지 않으며, 현장에서 공법의 선정과 시공도 여러 가지 적절하지 못한 경우가 자주 발생하고 있다. 이러한 것을 해결하기 위해서는 이 분야에 대한 지속적인 투자와 관심, 그리고 관련회사의 사면의 환경특성을 고려한 성실시공이 수반되어야 한다. 또한, 절토사면의 장.단기적인 유지관리를 위해서 사면의 분포현황, 사면녹화공의 시공.관리상태, 환경특성 등의 자료를 조사하여 종합적인 사면유지관리시스템과 연계해야 할 것이다.

  • PDF

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

Analysis of the cause of breakdown in Underground Transmission cable of Pipe (관로내 송전 XLPE 케이블 고장분석 및 검토)

  • Moon, Kyoung-Hee;Kang, Ji-Won
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.513-514
    • /
    • 2011
  • 본 논문에서는 154kV 지중송전선로의 관로내 XLPE 케이블에서 발생하는 절연파괴 고장원인을 분석하였다. 일반적으로 케이블은 제조공정 과정에서 결함을 철저히 걸러내도록 조치하고 공장 출하시 시험을 통해 점거하고 있어, 케이블 자체고장은 현장에서 시공하는 접속함에 비해 매우 작지만 드물게 발생하고 있다. 케이블 자체에서 고장 발생시 고장원인 파악을 위해 제조 품질, 시공과정 등을 체계적으로 분석하고 검토하여 케이블 생산, 시공현장 품질저하 및 관리소홀 등으로 인한 케이블 고장을 최소화하고자 한다.

  • PDF

아파트 설비시공 지침

  • 이동진
    • 월간 기계설비
    • /
    • s.35
    • /
    • pp.97-103
    • /
    • 1993
  • 아파트의 주거환경을 집단거주지로 편리성 및 안정성, 쾌적한 환경 등의 주거목적을 추구하고 있다. 사용자 위주의 편리성을 추구하는 시공이 되어야 하며, 시공업무에 종사하는 사람 모두가 본연의 임무를 소중하게 여기고 사용자의 편안함과 쾌적함을 고려하는 정성이 모아진 시공이어야 한다. 아파트 시공은 여러가지 자재와 여러공종이 시기적절하게 투입되므로 종합관리가 필요한 복잡한 공정들의 만남이다. 공정표는 비교적 정확히 작성되어야 하고 작성된 공정표는 지키겠다는 의지가 필요하다. 또한 시공자는 시작과 끝을 명확히 하고 과정을 중요시하며 수많은 과정을 확인하는 꼼꼼한 자세도 빠져서는 안된다. 본 시공지침서는 현장에서 시공할 때 도움을 주고자 설비시공의 기본골격을 언급하였다. 본 시공지침서는 시간의 흐름에 따라 공법개선 또는 여러 여건에 따라 변할 수도 있음을 감안하여 참고하기 바란다.

  • PDF

법령과고시 - '건설업 산업안전보건관리비 계상 및 사용기준' 개정.시행

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.261
    • /
    • pp.66-72
    • /
    • 2012
  • 고용노동부는 건설현장 근로자의 재해예방을 위해 쓰게 돼 있는 산업안전보건관리비의 사용기준을 현장에서 좀 더 쉽게 이해해서 적극 활용할 수 있도록 개선하기로 했다. 또 건설현장의 안전관리 내실화를 위해 시공사가 재해예방기술지도 계약을 체결했는지 발주자가 반드시 확인하게 할 계획이다. 고용노동부는 이같은 내용의 '건설업 산업안전보건 관리비 계상 및 사용기준'을 개정하고 지난 2월 8일부터 시행에 들어갔다.

  • PDF

A Study on Non-contact Penetration and Rebound Measurement Device for Quality Control in Driven Piles (말뚝 시공관리를 위한 비접촉식 관입량 측정장치 활용에 관한 연구)

  • Seo, Seunghwan;Kim, Juhyong;Choi, Changho;Chung, Moonkyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.11
    • /
    • pp.97-106
    • /
    • 2022
  • The domestic auger-drilled pile method generally manages the driving penetration (set) value with the final stage of construction. The penetration value has been estimated by manual measurement for a long time. The automation technology is yet to be applied due to workability and high-cost limitations, despite safety issues and lack of reliability in measured results. In this study, a non-contact pile penetration measurement device was developed. Further, the field performance was verified by comparing the measurements with a conventional automation device. In addition, the on-site field quality control method was analyzed using the penetration measuring device. The field experiments confirmed that more reliable bearing capacity estimation could calculate the dynamic damping coefficient and the modified Hiley formula with the developed device. Furthermore, it can be used for pile construction management from the bearing capacity viewpoint, even for piles not subjected to dynamic load tests.