• Title/Summary/Keyword: 현장관리업무

Search Result 687, Processing Time 0.029 seconds

Investigation of Domestic and Foreign Forest Resource Management Status and Analysis of Laser Scanning Technology Application (국내외 산림자원관리 현황 조사 및 레이저 스캐닝 기술의 산림적용 방안 분석)

  • Park, Joon-Kyu;Lee, Keun-Wang
    • Journal of Digital Convergence
    • /
    • v.19 no.11
    • /
    • pp.391-396
    • /
    • 2021
  • In this study, items for forest policy and forest resource research in Austria, Japan, New Zealand, and Indonesia, which are major forest advanced countries, were investigated, and the applicability of point cloud data acquired through laser scanning was identified. Through the study, it was found that forest policies in developed countries are being pursued for the purpose of sustainable forest conservation and management, job creation, and timber productivity improvement, and that new technologies are being researched and applied to actual projects. Korea has a high proportion of forests compared to the national land area compared to major forestry developed countries, but the accumulation of trees is relatively low, so it is a time for scientific forest management to improve the accumulation of trees. To understand the applicability of laser scanning technology, a forest resource survey using point cloud data was conducted, and the diameter of breast height, height, number of trees per unit area were calculated, and the shape of the crown was identified. If field experiments and accuracy evaluations applying various laser scanning technologies are carried out in the future, it will be possible to present the quantitative improvement of forest resource survey using foil cloud.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

A Prediction Model for the Radiation Safety Management Behavior of Medical Cyclotrons (의료용 Cyclotron의 방사선안전관리 행위 예측모형)

  • Jung, Ji-Hye;Han, Eun-Ok;Kim, Ssang-Tae
    • Journal of Radiation Protection and Research
    • /
    • v.33 no.2
    • /
    • pp.77-86
    • /
    • 2008
  • This study attempted to provide reference materials for improving the behavior level in radiation safety managements by drawing a prediction model that affects the radiation safety management behavior because the radiation safety management of medical Cyclotrons, which can be used to produce radioisotopes, is an important factor that protects radiation caused diseases not only for radiological operators but average users. In addition, this study obtained follows results through the investigation applied from January 2 to January 30, 2008 for the radiation safety managers employed in 24 authorized organizations, which have already installed Cyclotrons, through applying a specific form of questionnaire in which the validity was guaranteed by reference study, site investigation, and focus discussion by related experts. The radiation safety management were configured as seven steps: Step 1 is a production preparation step, Step 2 is an RI production step, Step 3 is a synthesis step, Step 4 is a distribution step, Step 5 is a quality control step, Step 6 is a carriage container packing step, and Step 7 is a transportation step. it was recognized that the distribution step was the most exposed as 15 subjects (62.5%), the items of 'the sanction and permission related works' and 'the guarantee of installation facilities and production equipments' were the most difficult as 9 subjects (37.5%), and In the trouble steps in such exposure, the item of 'the synthesis and distribution' steps were 4 times, respectively (30.8%). In the score of the behavior level in radiation safety managements, the minimum and maximum scores were 2.42 and 4.00, respectively, and the average score was $3.46{\pm}0.47$ out of 4. Prosperity and well-being programs in the behavior and job in radiation safety managements (r=0.529) represented a significant correlation statistically. In the drawing of a prediction model based on the factors that affected the behavior in radiation safety managements, general characteristics, organization characteristics, and selfefficacy didn't show a significant path statistically in which the prosperity and well-being programs in job characteristics affected the behavior in radiation safety managements. Therefore, it is necessary to establish a strategy that improves the level of prosperity and well-being levels in job characteristics in order to increase the behavior in radiation safety managements. Thus, this study provides basic materials for the radiation safety management of Cyclotron through the full-scale investigation that is first applied in Korea.

A Study on Local Three-Dimensional Visualization Methodology for Effective Analysis of Construction Environments in Extreme Cold Regions (효과적인 극한지 건설환경 분석을 위한 현지 3차원 가시화 방안 연구)

  • Kim, Eui Myoung;Lee, Woo Sik;Hong, Chang Hee
    • Spatial Information Research
    • /
    • v.20 no.6
    • /
    • pp.129-137
    • /
    • 2012
  • For construction project in extreme cold region, it is essential to establish basic data on the site such as topographical data from the early stage of construction of planning and designing, and it is needed to frequently perform site investigation when necessary. However, extreme cold regions are characteristic of being at long distance and difficult in approaching, and special regions such as Antarctica, in particular, are hard to conduct site investigation. Although a site investigation may be conducted, those who can visit Antarctica are sufficiently limited so that most of the staff may participate in construction without knowledge of the site and increase the risk of errors in decision making or designing. In order to resolve such problems, the authors in this study identified methods of building wide-area topographical data and bedrock classification data of exposed areas via remote sensing and of building precise topographical data on the construction site. Also, the authors attempted to present methods by which such data can be managed and visualized integrally via three-dimensional GIS technology and all the participants in construction can learn sense of field and conduct necessary analysis as frequent as possible. The areas around the Jangbogo Antarctic Station were selected to be the research area for conducting effective integrational management and three-dimensional visualization of various spatial data such as wide-area digital elevation model, ortho-images, bedrock classification data, local precise digital elevation model, and site images. The results of this study may enable construction firms to analyze local environments for construction whenever they need for construction in extreme cold regions and then support construction work including decision making or designing.

Development of SaaS cloud infrastructure to monitor conditions of wind turbine gearbox (풍력발전기 증속기 상태를 감시하기 위한 SaaS 클라우드 인프라 개발)

  • Lee, Gwang-Se;Choi, Jungchul;Kang, Seung-Jin;Park, Sail;Lee, Jin-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.316-325
    • /
    • 2018
  • In this paper, to integrate distributed IT resources and manage human resource efficiently as purpose of cost reduction, infrastructure of wind turbine monitoring system have been designed and developed on the basis of SaaS cloud. This infrastructure hierarchize data according to related task and services. Softwares to monitor conditions via the infrastructure are also developed. Softwares are made up of DB design, field measurement, data transmission and monitoring programs. The infrastructure is able to monitor conditions from SCADA data and additional sensors. Total time delay from field measurement to monitoring is defined by modeling of step-wise time delay in condition monitoring algorithms. Since vibration data are acquired by measurements of high resolution, the delay is unavoidable and it is essential information for application of O&M program. Monitoring target is gearbox in wind turbine of MW-class and it is operating for 10 years, which means that accurate monitoring is essential for its efficient O&M in the future. The infrastructure is in operation to deal with the gearbox conditions with high resolution of 50 TB data capacity, annually.

Development of Unique Naming Algorithm for 3D Straight Bridge Model Using Object Identification (3차원 직선교 모델 객체의 인식을 통한 고유 명칭부여 알고리즘 개발)

  • Park, Junwon;Park, Sang Il;Kim, Bong-Geun;Yoon, Young-Cheol;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.6
    • /
    • pp.557-564
    • /
    • 2014
  • In this study, we present an algorithm that conducts an unique naming process for the bridge object through the solid object identification focused on 3D straight bridge model. For the recognition of 3D objects, the numerical algorithm utilizes centroid point, and solid object on the local coordination system. It classifies the object feature set by classifying the objects and members based on the bridge direction. By doing so, unique names, which contain the information about span, members and order of the object, were determined and the suitability of this naming algorithm was examined through a truss bridge model and a bridge model with different coordinate systems. Also, the naming process based on the object feature set was carried out for the real 3D bridge model and then was applied to the module on local server and mobile device for real bridge inspection work. From the comparison of the developed naming algorithm based on object identification and the conventional one based on field inspection, it was shown that the conventional field inspection work can be effectively improved.

Development plan and Inspection Status of Hydrological Measuring Instrument (수문조사기기 검정현황 및 발전방안)

  • Kim, Ji Hun;Jang, Bok Jin;Kim, Ji Chan;Jung, SungWon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.213-213
    • /
    • 2016
  • 수문조사기기의 검정은 수문조사에 활용할 기기를 일관되고 표준화된 기준으로 검사하여 수문조사에 적합한 기기인지 확인하는 것이다. 이러한 검정은 국가수문자료의 신뢰도를 높이고 유지하는 기본적이고 중요한 업무이다. 검정대상기기는 강수량측정기기, 유속측정기기, 수위측정기기, 부유사측정기기, 토양수분측정기기, 증발산량측정기기로 총 6가지이며, 2009년부터 국토교통부 위탁사업으로 한국건설기술연구원(유량조사사업단)에서 수행하고 있다. 특히 유량조사사업단에서는 유속측정기기를 제외한 나머지 5개 수문조사기기에 대해 검정을 수행하고 있다. 연도별로 2009년부터 2015년까지 98대, 334대, 572대, 539대, 359대, 682대, 690대로 총 3,274대를 검정하였고, 관측기종별로 강수량 1,579대, 수위 1,589대 부유사 23대, 토양수분 33대, 증발산량 50대이다. 신청기관별로는 국토교통부(홍수통제소) 1,847대, 환경부(국립환경과학원) 4대, 한국건설기술연구원(유량조사사업단 포함) 81대, K-water 338대, 한국수력원자력(주) 91대, 일반업체 913대에 대한 검정을 실시하였다. 검정을 실시한 강수량측정기기 1,579대 중 보정없이 합격된 기기는 1,495대, 허용오차기준에 미달되어 보정 실시 후 합격한 기기는 76대이며, 불합격 처리된 기기는 8대이다. 수위측정기기는 합격이 1,586대, 기준에 미달되어 불합격된 기기가 2대로 나타났다. 강수량측정기기의 각 연도대비 통계분석 결과 보정률은 2009년 97대 중 8대(8.2%), 2010년 194대 중 3대(1.5%), 2011년 180대 중 24대(13.3%), 2012년 175대 중 17대(9.7%), 2013년 165대 중 15대(9.1%), 2014년 547대 중 8대(1.5%), 2015년 221대 중 9대(4.1%)로 다소 낮은 수치로 나타났다. 이처럼 보정률이 낮게 나타난 이유는 관할기관의 검정을 위한 유지관리 및 사업자의 사전검사 등을 통해 감소한 것으로 판단되며, 이와 같은 결과는 수문자료의 품질 및 신뢰도 향상으로 이어졌다. 그러나 여전히 선진국에 비해 수문조사기기 검정의 중요성에 대한 인프라 구축이 미흡한 실정이다. 수문조사기기 검정의 선진국이라 할 수 있는 미국의 경우 USGS에서 HIF(Hydrogical Istrumentation Facility)라는 별도 조직을 운영하여 관측기기의 렌탈, 수리, 교정 및 검정, 개발, 교육 등 이러한 작업을 일괄 수행하고 있고 조직 내 자체 시설로 수중펌프 시험소, 자연과 유사한 환경에서 테스트 하는 장소, 대형온도챔버 등을 갖추고 있으며, 이러한 시설을 이용하여 기기의 교정 및 검정, 연구 등을 현장과 비슷한 환경에서 다양한 실험을 통해 검정방법을 비교, 분석하는 것을 볼 수 있다. 현재 우리나라의 수문조사기기는 다양한 방법으로 현장에 설치되어 검정방법의 다양성이 요구된다. 향후 우리나라도 HIF와 같이 다양하고 선진화된 시설과 기술을 개선하고 다각적인 시험 과정을 통해 수준 높은 검정방법체계를 갖추려는 노력이 필요하다.

  • PDF

An Analysis Study on the Current Status and Integration Methods of the Domestic Early Warning System (국내 재난 예경보 시스템 현황 및 통합 방안에 대한 분석 연구)

  • Hwang, Woosuk;Pyo, Kyungsoo
    • Journal of Broadcast Engineering
    • /
    • v.27 no.1
    • /
    • pp.80-90
    • /
    • 2022
  • Currently, the domestic early warning system is issued differently for each disaster, and is operated independently by relevant organizations from central government to local governments. Representative domestic disaster warning systems include disaster broadcasting using CBS(Cell Broadcasting Service) and DMB(Digital Multimedia Broadcasting) Automatic Emergency Alert Service, DITS(Disaster Information Transform System) transmitted and displayed on TV screens, automatic response system, automated rainfall warning system, and disaster message board. However, due to the difference in the method of issuing each emergency alert at the site of an emergency disaster, the alerts are issued at different times for each media, and the delivered content is also not integrated. If these systems are integrated, it is expected that damage to people's property and lives will be minimized by sharing and integrated management of disaster information such as voice, video, and data to comprehensively judge and make decisions about disaster situations. Therefore, in this study, we present a plan for the integration of the disaster warning system along with the analysis of the operation status of the domestic early warning system.

Risk Management and Strategies in Airport Security Check (공항 보안검색에 있어서의 위험관리와 대응과제)

  • Kim, Jae-Woon
    • Korean Security Journal
    • /
    • no.34
    • /
    • pp.89-113
    • /
    • 2013
  • Travel by airplane using airport in globalized modern society is familiar to our life but such airport can be a target of terrorists who would threaten our safety. However, aviation terrorism which is represented by 9.11 terror gives horror beyond our imagination to modern people. Since the first airplane hijacking in Peru in 1931 happened, security organization in each nation has taken various prevention measures to block aviation terrorism. The most realistic measures to prevent aviation terrorism would be security check activity to control approach of terrorist that passengers on airplane and cargos are checked to find out dangerous article like explosive etc. But security check activity in Korea shifted to security check activity focused on private security for efficiency of airport operation differently from security check activity in advanced countries where public interests is strengthened according to risk of terror after 9.11 system. That is, since Incheon airport opened in March 2001, security check system focused on the police was changed. Now Incheon international airport Corporation instructs and supervises security check job and private security personnel are in charge of actual security check activity. But this check system has limitation in blocking terror activity by terrorists which is systematized and intelligent as time passes due to deteriorated job satisfaction of private security personnel and confusing supervising system. Accordingly, it is suggested to introduce risk management skill which is one of management strategy of private corporation for security check activity to prevent terror activity. With this skill, risk factors of aviation terror are identified and analyzed regularly, and each process such as setting of priority, activity to reduce risk, and assessment of security is carried out. And it would be necessary to do efforts, for example, to properly change level of security check according to threat of terror such as to place policeman at airport security in case threat of terror is severe. On the other hand, it is necessary to establish national police organization for good communication of security check activity in field and supervising function, which can encourage systematization and specialization of aviation security job.

  • PDF

A Study of Factors Associated with Software Developers Job Turnover (데이터마이닝을 활용한 소프트웨어 개발인력의 업무 지속수행의도 결정요인 분석)

  • Jeon, In-Ho;Park, Sun W.;Park, Yoon-Joo
    • Journal of Intelligence and Information Systems
    • /
    • v.21 no.2
    • /
    • pp.191-204
    • /
    • 2015
  • According to the '2013 Performance Assessment Report on the Financial Program' from the National Assembly Budget Office, the unfilled recruitment ratio of Software(SW) Developers in South Korea was 25% in the 2012 fiscal year. Moreover, the unfilled recruitment ratio of highly-qualified SW developers reaches almost 80%. This phenomenon is intensified in small and medium enterprises consisting of less than 300 employees. Young job-seekers in South Korea are increasingly avoiding becoming a SW developer and even the current SW developers want to change careers, which hinders the national development of IT industries. The Korean government has recently realized the problem and implemented policies to foster young SW developers. Due to this effort, it has become easier to find young SW developers at the beginning-level. However, it is still hard to recruit highly-qualified SW developers for many IT companies. This is because in order to become a SW developing expert, having a long term experiences are important. Thus, improving job continuity intentions of current SW developers is more important than fostering new SW developers. Therefore, this study surveyed the job continuity intentions of SW developers and analyzed the factors associated with them. As a method, we carried out a survey from September 2014 to October 2014, which was targeted on 130 SW developers who were working in IT industries in South Korea. We gathered the demographic information and characteristics of the respondents, work environments of a SW industry, and social positions for SW developers. Afterward, a regression analysis and a decision tree method were performed to analyze the data. These two methods are widely used data mining techniques, which have explanation ability and are mutually complementary. We first performed a linear regression method to find the important factors assaociated with a job continuity intension of SW developers. The result showed that an 'expected age' to work as a SW developer were the most significant factor associated with the job continuity intention. We supposed that the major cause of this phenomenon is the structural problem of IT industries in South Korea, which requires SW developers to change the work field from developing area to management as they are promoted. Also, a 'motivation' to become a SW developer and a 'personality (introverted tendency)' of a SW developer are highly importantly factors associated with the job continuity intention. Next, the decision tree method was performed to extract the characteristics of highly motivated developers and the low motivated ones. We used well-known C4.5 algorithm for decision tree analysis. The results showed that 'motivation', 'personality', and 'expected age' were also important factors influencing the job continuity intentions, which was similar to the results of the regression analysis. In addition to that, the 'ability to learn' new technology was a crucial factor for the decision rules of job continuity. In other words, a person with high ability to learn new technology tends to work as a SW developer for a longer period of time. The decision rule also showed that a 'social position' of SW developers and a 'prospect' of SW industry were minor factors influencing job continuity intensions. On the other hand, 'type of an employment (regular position/ non-regular position)' and 'type of company (ordering company/ service providing company)' did not affect the job continuity intension in both methods. In this research, we demonstrated the job continuity intentions of SW developers, who were actually working at IT companies in South Korea, and we analyzed the factors associated with them. These results can be used for human resource management in many IT companies when recruiting or fostering highly-qualified SW experts. It can also help to build SW developer fostering policy and to solve the problem of unfilled recruitment of SW Developers in South Korea.