The blast demolition technology has been used to demolish various industrial facilities and tall buildings since 1950s in the advanced countries such as USA and U.K. It is now considered as one of safe demolition methods in the above countries. In Korea, several companies have tried to introduce blast demolition technology in the early days of the 1990s. However, this technology is still at the beginning stage and not fully adopted due to situation of avoiding technology transfer by overseas technical tie-up companies, lack of objects to be demolished and low level recognition on blast demolition. This technology shall be considered as a cutting edge technology to be applicable to demolition of skyscrapers, various industrial structures and factory buildings in the near future. Blast demolition of a pier structure was carried out under the site condition where there were already the constructed 2 pier structures of up and down line which had safety problems in an expressway construction project. The pier structures need to be demolished and reconstructed for a short period of time in consideration of the construction work process to be followed.
Proceedings of the Korean Nuclear Society Conference
/
1998.05b
/
pp.503-508
/
1998
연구용원자로인 하나로(HANARO)에서 중성자 조사된 캡슐 및 핵연료다발을 절단 및 해체하기 위한 장비인 캡슐절단기를 개발하여 조사재시험시설(IMEF)의 M2 핫셀(hot cell)에 설치하였다. 재료 및 핵연료의 개발을 위해 하나로에서 조사되는 캡슐 및 핵연료다발의 절단 및 해체는 핵연료봉 및 캡슐내부에 내장되어 있는 시편에 손상 및 결함이 발생하지 않도록 하는 것이 매우 중요하며, 이러한 장비는 핫셀의 작업구역에서 원격조작기를 사용하여 원격으로 조작이 용이하도록 설계 및 제작되어야 한다. 이에 조사재시험시설에서 개발한 캡슐절단기는 가공물이 회전 및 좌우이송, 절단용 철이 회전 및 전후이송이 각각 되도록 하였고, 핫셀내에 설치하기 전에 가공에 필요한 최적의 조건을 설정하였다. 그리고 핫셀내 설치후 중성자에 조사되지 않은 하나로용 핵연료다발과 조사된 무계장캡슐을 건식상태로 절단 및 해체하여 장비 성능을 확인하였다.
Proceedings of the Korean Radioactive Waste Society Conference
/
2015.10a
/
pp.133-134
/
2015
전처리 공정장치 구축에 앞서 정확한 설계와 검증이 선행되어야 한다. 우선 디지털 목업 기술을 통해 설계검증을 철저히 함으로써 공정의 품질을 높이고 공정하자를 최소화 할 수 있다. 전처리 공정 중 집합체해체 핵심장치의 유지보수를 쉽게 하고, 원격 제어 효율을 높이기 위한 모듈화와 그에 대한 사전 검증을 수행하였다. 이를 위해해 전처리 디지털 목업 시스템 검증 대상과 집합체 해체핵심장치 주요모듈을 선정하였으며, 주요 모듈의 모듈화 방안 과 모듈 탈착 시간 검증하였다. 그 결과, 집합체해체 핵심장치에서는 5개의 주요 모듈로 구성되었으며, 모듈 탈착 시간 검증에서 작업시간은 클램프모듈이 약 130초, 언볼팅, 드릴링 모듈이 140초 소요될 것으로 분석되었다. 향후 전처리장치별 모듈 분석과 LAYOUT 운영을 포함해서 MSM 시뮬레이터의 디바이스 및 시뮬레이터 시스템 구축을 수행할 것이다.
There are many reasons for decommissioning of cyclotron such as not only age-related deficiency, any serious wear or damage but also relocation, upgrade and changing mission. Decommission of cyclotron in USA and EU give rise to a lot of low-level radioactive waste and costs. Various research on decommissioning of particle accelerator have been carried to reduce the cost of decommissioning in USA and EU. In USA, the NRC require DFP (Decommissioning Funding Plan) to authorized licenser by 10 CFR Part 30.35. To resolve radioactive waste problem and reduce the estimated cost of cyclotron decommissioning, we should consider technical aspects (decommissioning procedures, decontamination techniques, etc.) and safety aspects(residual radioactivity, the expected dose, etc) for decommissioning. In this study, we analyzed practical information on the decommissioning of cyclotron in ANL (Argonne National Laboratory) and Belgium (EU). And we investigated the experience on the cyclotron relocation from SNUH (Seoul National University Hospital) to SKKU (Sungkyunkwan University). From these results, we provide the basic data for establishing of relevant standards on domestic cyclotron decommissioning. It is necessary to adopt the DFP for safe and economic decommissioning and waste recycling. These result could be utilized for the establishment on the standards and useful requirements.
Kim, Sang-Min;Park, Keun-Sun;Kim, Ho-Jun;Kim, Hee-Do;Kim, Gab-Soo;An, Kyung-Ro
Explosives and Blasting
/
v.37
no.1
/
pp.34-47
/
2019
This case study is concerned with the project of the explosive demolition for the DCRE Incheon plant located in Hakik district in Incheon city. The building was severely aging due to the high temperature and sea winds of hundreds of degrees emitted by chimney-shaped steel structures inside the building. Due to this, the concrete of the column and the beam fell off and rusted rebar were exposed, and some of the slabs were severely damaged, making it difficult for workers to access the structure. Therefore, it is not possible to apply a mechanical demolition method in which heavy equipment enters the interior of the building, and an explosive demolition method was applied to allow the building to be demolished without dismantling the internal facilities of the building. The order of blasting proceeded in the order of (1) building ${\rightarrow}$ (2) chimney 2 ${\rightarrow}$ (3) chimney 1. A total of 406 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate in building and chimneys.
Park, Jihye;Yang, Wonseok;Chae, Nakkyu;Lee, Minho;Choi, Sungyeol
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.18
no.2
/
pp.157-167
/
2020
Removing radioactive concrete is crucial in the decommissioning of nuclear power plants. However, this process generates radioactive aerosols, exposing workers to radiation. Although large amounts of radioactive concrete are generated during decommissioning, studies on the internal exposure of workers to radioactive aerosols generated from the cutting of radioactive concrete are very limited. In this study, therefore, we calculate the internal radiation doses of workers exposed to radioactive aerosols during activities such as drilling and cutting of radioactive concrete, using previous research data. The electrical-mobility-equivalent diameter measured in a previous study was converted to aerodynamic diameter using the Newton-Raphson method. Furthermore, the specific activity of each nuclide in radioactive concrete 10 years after nuclear power plants are shut down was calculated using the ORIGEN code. Eventually, we calculated the committed effective dose for each nuclide using the IMBA software. The maximum effective dose of 152Eu constituted 83.09% of the total dose; moreover, the five highest-ranked elements (152Eu, 154Eu, 60Co, 239Pu, 55Fe) constituted 99.63%. Therefore, we postulate that these major elements could be measured first for rapid radiation exposure management of workers involved in decommissioning of nuclear power plants, even if all radioactive elements in concrete are not considered.
Assessment of NPP(Nuclear Power Plant) decommissioning cost is very important for safe decommissioning of nuclear power plants. In the United States, which has the most NPP decommissioning experience, the cost evaluation study has been conducted since the 1970s in order to decommissioning nuclear facilities. The US NRC has conducted studies on decommissioning technology, safety and cost for a variety of reactor type and nuclear installations. In the total decommissioning costs, the end of operation licenses accounted for the largest portion, followed by spent fuel management and site restoration. In case of immediate decommissioning, spent fuel management cost increased compared to delayed decommissioning, and delayed deocmmissioning increased the cost of terminating the operation license. However, in general, delayed decommissioning does not show any significant benefit as compared with immediate decommissioning. It is necessary to consider the evaluation according to the site conditions when evaluating the cost of decommissioning domestic nuclear power plants. Also, in Korea, IAEA recommendations were applied to reorganize the radioactive waste classification system. Therefore, it is necessary to develop a method to appropriately use the decommissioning data of the preceding US Nuclear Power Plant in the new classification system when estimating the amount of radioactive waste generated during decommissioning. In particular, the establishment of the evaluation methodology for the waste to be disposed of will be an important factor in securing the accuracy of the decommissioning cost. In addition, it is necessary to construct information data that can be applied to facility characteristics and work characteristics in order to evaluate the cost of demolition of domestic nuclear power plants.
최근, 뉴스 등에서 타워크레인 붕괴사고로 인한 사망사고를 심심치 않게 듣게 되는데 타워크레인은 건축공사 현장에서는 없어서는 안 될 필수 설비임에 틀림없다. 타워크레인을 많이 설치하고 또 많이 사용하는 만큼 안전이 무엇보디도 중요하다고 할 수 있는데 이번 호에는 타워크레인이 어떻게 설치되고 또 어떻게 해야 안전한 작업을 할 수 있는지 살펴보기로 하자.
2012년 03월 16일(금) 11:05경, 경기도 고양시 소재 ${\bigcirc}{\bigcirc}$물재생센터의 발전기(3기)를 교체하기 위하여 발전기 및 관련 설비를 해체하는 과정에서 가스 압축기실 내에 있던 누출된 메탄가스가 배관 등의 용단작업 중에 발생된 불꽃에 의해 점화 폭발로 1명 사망, 6명이 부상당한 재해임.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.