Korean Journal of Construction Engineering and Management
/
v.22
no.5
/
pp.66-72
/
2021
Participation in official development assistance (ODA) construction projects can be proposed as a way to revitalize Korean small and medium-sized construction companies' entry into the overseas construction market. To this end, the necessary competency items were derived for the execution of the project, and a survey was conducted and an analysis of importance-current competency was performed. 24 out of a total of 32 competency items were analyzed as having a low level of competency compared to their importance, indicating that it is urgent to strengthen corporate-level capabilities for the smooth execution of related projects in the future. In detail, it is judged that it is necessary to seek to establish a preferential capacity-strengthening plan for contract management-related items such as the 'Construction-related fundamental laws, Contract management method, and International administration negotiation'.
Journal of the Korea Institute of Building Construction
/
v.15
no.2
/
pp.237-247
/
2015
The project management information system (PMIS) has recently been developed by using the information technology(IT) in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. It has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing commercially available systems were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management about construction projects in the US. Then, the PMIS was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by experts about construction management in the US via questionnaire survey. The developed PMIS, in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other oversea markets in the future.
Journal of the Korea Institute of Building Construction
/
v.23
no.6
/
pp.785-796
/
2023
The adoption of Environmental, Social, and Governance(ESG) practices in domestic construction firms is predominantly driven by major corporations. These companies not only publish reports on their ESG management but also engage in a meticulous process of identifying key issues and setting priorities. This process entails an in-depth evaluation of the severity of various issues and the gathering of insights from experts in the field. Interestingly, a comparative analysis of ESG assessments for construction companies, both domestically and internationally, reveals significant discrepancies in outcomes. These differences stem from the varied evaluation methodologies and criteria employed by different assessing bodies. Addressing this gap, our study proposes a suite of strategies aimed at bolstering ESG management within the construction sector. We advocate for enhanced policy support and financial backing, especially targeting small and medium-sized enterprises(SMEs) to facilitate their engagement in ESG practices. A critical step forward involves the standardization and transparent disclosure of ESG evaluation criteria, tailored to reflect the unique aspects of the construction industry. Moreover, the standardization and publication of ESG assessments for subcontractors are essential, equipping them with the necessary tools for effective ESG management and evaluation. Given the global nature of construction projects, particularly those commissioned by the European Union in regions like Africa and East Asia, adherence to ESG standards is imperative. Our long-term vision includes the development of a comprehensive database detailing ESG regulations and their impacts, segmented by region and country. This repository will serve as a valuable resource for companies venturing into international construction projects.
Korean overseas construction contracts reached 40 billion dollars in 2008. In this paper, the economic factors of "the record high growth since 1980's 'overseas construction boom' is investigated. Firstly, most of the contracts were made in the Middle East OPEC countries which made large scale construction investments with the increasing oil revenues... Secondly. large portion of the contracts is heavy industrial plants, in which Korean construction firms have enjoyed comparative advantages. Thirdly, Korean construction firms have been forced to pay attention to the overseas markets, due to the domestic slump of the construction industry.
지중화 사업을 원활하게 추진하기 위해서는 전력설비의 설치공간 화보, 공간제공의 의무조항 등 이에 합당한 법적, 제도적 대책을 수립할 필요가 있다. 이를 위해선 전력회사의 전기공급설비를 위한 공간제공을 의무화하는 것이 선행되어야 하며 건축법 및 전기사업법의 관련 조항을 규정화할 필요가 있다. 따라서 배전선로 지중화에 많은 경험을 가지고 있는 해외 선진 전력회사의 전기설비를 위한 공간 화보를 위한 사항을 조사하였으며, 이를 바탕으로 국내 실정에 맞는 기기의 설치면적 산출 및 법규내용을 제시하였다.
Journal of the Korea Institute of Building Construction
/
v.19
no.6
/
pp.557-566
/
2019
The construction industry has the most safety accidents of any of the domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening their regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on the client's responsibility for safety management is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.34
no.5
/
pp.19-26
/
2018
A civil-military facility sharing project is a part of mutual cooperative efforts, which enables the military to use any civilian (local government or company) or a civilian to use any military facility. Such facility sharing project may reduce or clear possible conflicts with the local residents in the surrounding area of a military facility while being available to save budgets for new construction or maintenance of a defense or military facility. Various measures have been proposed for institutional resolutions on conflicts with the local residents in the surrounding area of a military facility. This study collects and organizes previous cases of the civilian-military facility sharing projects, and analyzes the characteristics of such cases based on the project types. In addition, by organizing and proposing the project characteristics, plans (ideas) and determination criteria to expand and vitalize are presented regarding the project types having restrictions. AHP technique is employed to research on the matrix for the project feasibility determination. Also, the opinions organized through the cause analysis are categorized and presented as a project for the expansion and vitalization of future project. According to the rearch result, Type I, II and III are determined to be projects that can be implemented without difficulties. Type IV, on the other hands, is determined as not illegal, yet inadequate so that some legal and institutional complements are required to expand and vitaliza this facility sharing project.
Journal of the Korea Institute of Building Construction
/
v.13
no.6
/
pp.530-540
/
2013
The business environment that affects the management performance can be characterized by each Strategic Business Unit (SBU) since construction companies win overseas contracts due to the fairly good construction situations while experience a decline in the local housing market. Environmental changes can alter the strategic importance of the SBU when measuring the management performance. However, large construction companies apply BSC (Balanced Score Card) for collective calculation to determine the management performance, making it difficult to reflect the strategic importance of SBU. This method may create a distorted image of management performance that fails to take environmental changes into consideration, and as such it needs to be improved. Yet, there are no studies on the weight of each SBU considering environmental changes. Thus, the current study intends to analyze the weight of SBU for company-wide measurement of the performance of large construction companies. In addition, a model for analysis of SBU importance is proposed to respond to the constantly changing environmental situations and to modify the weight. For analysis of SBU weight, a questionnaire was conducted with 23 experts and hands-on workers, and the questionnaire result was quantitatively analyzed by applying the FD-AHP method. It is expected that the result will enable a model to be proposed to calculate the weight per division in a manner that reflects environmental changes and minimizes strategic distortion when measuring the management performance of large construction companies.
Korean Journal of Construction Engineering and Management
/
v.22
no.4
/
pp.20-28
/
2021
The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.
The necessity of urban regeneration is recently increasing because of the deterioration existing urban area and the slowdown of new development operations. The urban regeneration is differentiated from other private operations by its public characters, which is the basis of public support. This character demands verification of the adequacy for public finance support by monitoring urban regeneration planning and operation. Therefore, this study aims to show the monitoring indicators and its application in legal system for urban regeneration through the examination of foreign countries cases. London, San Francisco, and France urbanism regulation and planning system show the measure for introducing urban regeneration monitoring system into korean urbanism institution. This study is significant by suggesting the circulation structure of urban regeneration by linking planning, operations and monitoring phases. The monitoring system permits improvement of urban regeneration by clarifying objects and ameliorating efficiency by continuos observation and application of its evaluation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.