• Title/Summary/Keyword: 해양작업지원선

Search Result 18, Processing Time 0.038 seconds

A study for roll damping performance of a platform supply vessel with or without bilge keel using CFD (전산유체역학을 이용한 해양작업지원선의 빌지킬 유무에 따른 횡동요 성능에 관한 연구)

  • Seok, Jun;Kim, Sung-Yong;Yang, Young-Jun;Jin, Song-Han;Park, Jong-Chun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.40 no.9
    • /
    • pp.791-798
    • /
    • 2016
  • In this study, numerical simulations on the effects of bilge keel on roll motion were conducted. The numerical simulations were performed on a 110 m class PSV using the commercial viscous flow analysis software Star-CCM+. Before conducting the study on the 110 m class PSV, an additional simulation of DTMB 5512 was performed and compared with the experimental results to validate the feasibility of the numerical simulation. In the simulation on PSV, a nondimensional damping coefficient was calculated using a free roll decay simulation, and the response amplitude operator (RAO) for the roll motion was calculated with a nondimensional damping coefficient at two conditions (with/without bilge keel).

Study on Planning for Accommodation Area of Accommodation Barge (생활바지선 거주구 공간계획에 관한 연구)

  • Kang, Young-Hun;Lee, Han-Seok;Doe, Geun-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.06a
    • /
    • pp.338-339
    • /
    • 2011
  • 본 연구는 해양플랜트 지원선 중 작업자들에게 전용거주시설을 제공하는 생활바지선 거주구공간계획에 관한 연구이다. 생활바지선의 거주구는 '작업자영역', '서비스영역', '승무원영역', '업무영역'으로 공간을 분류할 수 있다. 본 연구에서는 현재 사용되고 있는 10척의 생활바지선 일반배치도(GA)를 조사하여 거주공간특성을 분석하였다. 또한 해양플랜트 거주구 설계시 가장 많이 참조되는 ABS, NORSOK 등 해외선급협회에서 제시하는 해양플랜트 거주구 공간설계지침을 분석하여 생활바지선에서 거주구 공간계획에 적용하기위한 설계지침을 제시하였다. 그리고 생활바지선 거주구 설계모델을 설정하고 모델을 대상으로 데크별 공간배치와 동선을 계획하였다. 마지막으로 거주구 설계모델의 객실, 식당, 주방, 휴게공간 그리고 위생시설 등 주요공간을 대상으로 공간계획을 실시하고 계획안을 제시하였다. 최근 국내 조선업계에서도 생활바지선에 대한 관심이 증가하고 있으나 거주구 공간설계기술의 부족으로 외국 설계업체에 의존하고 있는 형편이다. 따라서 우선 한국선급협회에서 본 연구결과를 기초 생활바지선 거주구 공간계획을 위한 설계지침을 시급히 만들어야만 한다.

  • PDF

Assessment of the Structural Collapse Behavior of Between Offshore Supply Vessel and Leg in the Jack-up Drilling Rig (잭업드릴링 리그의 레그와 작업 지원선 충돌에 의한 구조붕괴 거동 평가)

  • Park, Joo-Shin;Seo, Jung-Kwan
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.4
    • /
    • pp.601-609
    • /
    • 2022
  • Jack-up drilling rigs are mobile offshore platforms widely used in the offshore oil and gas exploration industry. These are independent, three-legged, self-elevating units with a cantilevered drilling facility for drilling and production. A typical jack-up rig includes a triangular hull, a tower derrick, a cantilever, a jackcase, living quarters and legs which comprise three-chord, open-truss, X-braced structure with a spudcan. Generally, jack-up rigs can only operate in water depths ranging from 130m to 170m. Recently, there has been an increasing demand for jack-up rigs for operating at deeper water levels and harsher environmental conditions such as waves, currents and wind loads. All static and dynamic loads are supported through legs in the jack-up mode. The most important issue by society is to secure the safety of the leg structure against collision that causes large instantaneous impact energy. In this study, nonlinear FE -analysis and verification of the requirement against collision for 35MJ recommended by DNV was performed using LS-Dyna software. The colliding ship used a 7,500ton of shore supply vessel, and five scenarios of collisions were selected. From the results, all conditions do not satisfy the class requirement of 35MJ. The loading conditions associated with chord collision are reasonable collision energy of 15M and brace collisions are 6MJ. Therefore, it can be confirmed that the identical collision criteria by DNV need to be modified based on collision scenarios and colliding members.

Offshore Platform Installation Simulation Using Real-Time Maneuvering and Operation Simulator (Real-Time 조종 및 작업 시뮬레이터를 활용한 해양구조물 설치 작업 시뮬레이션)

  • Jonghyeon Lee;Solyoung Han;Dong-Woo Park
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.1
    • /
    • pp.67-75
    • /
    • 2023
  • In this study, the dynamic characteristics of an offshore platform being installed and physical phenomena are analyzed from the perspective of interaction between operation and maneuvering simulation using a real-time Maneuvering & Operation simulator of Shipbuilding & Marine Simulation Center at Tongmyong University. It was simulated to install the semi-submersible drilling rig moored by 8 mooring lines according to a scenario that is similar to it on the real sea, and 4 tug boats for position keeping of the rig and an offshore support vessel for hook-up of the mooring lines were operated. During the simulation, the motion, trajectory, tension of the objects were output in real time, and they were analyzed at each work procedure. This study about the simultaneous simulation of operation and maneuvering showed the detailed motion of the offshore platform and ships on the operation procedure and the interaction between operation and maneuvering in specific environment condition. Also, it confirmed that the simulation can be utilized to determine the possibility of offshore platform installation in specific situations.

A Study on the Hull Form Design and Ice Resistance & Propulsion Performance of a Platform Support Vessel (PSV) Operated in the Arctic Ocean (극지해역 운용 해양작업지원선(PSV)의 선형설계와 빙 저항추진 성능 연구)

  • Yum, Jong-Gil;Kang, Kuk-Jin;Jang, Jin-ho;Jeong, Seong-Yeob
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.6
    • /
    • pp.497-504
    • /
    • 2018
  • Platform Support Vessels operated in the Arctic Ocean support diverse operations of offshore plant in the sea, and the PSV is also needed to support works to exploit the oil and gas in the Arctic Ocean. Both of the ice breaking and the open sea performance have been considered together to secure the enhanced operational performance at the harsh environment in the Arctic Ocean and the open sea as well. In this study, One of the design requirements of a PSV is to guarantee continuous icebreaking performance with 3 knots at 1 m thickness of level ice, where the design draft is 7.5m and the engine power is 13 MW. Three hull forms were designed, and the ice resistance based on empirical formulas was estimated to select the initial hull form having an outstanding performance. The full scale performance of the designed hull forms was predicted by the ice model test conducted in the ice model basin of Korea Research Institute of Ships & Ocean Engineering(KRISO). The analysed results show that the selected hull form satisfies the above design requirement.

브라질 OSV 시장 현황과 기업 진출 전략

  • Kim, Min-Su
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.10a
    • /
    • pp.271-273
    • /
    • 2012
  • 브라질은 최근 심해유전(Pre-Salt)개발 등 해양자원개발 등을 통해 신흥자원부국으로 각광받고 있다. 올 해 6월 국영석유기업인 페트로브라스가 '2012-2016 Business Plan'를 통해 향후 5년 간 E&P, 정제 및 운송 분야에 2,073억 달러를 투자한다고 밝히면서 향후 해양플랜트 및 OSV 수요가 커질 것으로 예상된다. 브라질이 우리나라 조선, 해운, 전문 인력 분야에서 협력대상으로 한국을 염두에 두고 있어 특히 OSV 건조 및 운영과 관련해 우리나라 기업의 진출 전략 수립이 필요하다. 이 글은 브라질 OSV 시장 현황 및 정부 정책, 그리고 우리나라 진출 전략을 크게 현지네트워크 강화를 통한 페트로브라스 공략, 로컬 콘텐츠 대응 전략 수립, OSV 운영에 특화된 전문인력 양성, 선사 조선소 기자재 업체 협력체계 구축, 정부 지원 확대 등으로 제시한다.

  • PDF

해운이슈 - KMI, 오프쇼어(Offshore) 산업 로컬 콘텐츠 정책 발표

  • 한국선주협회
    • 해운
    • /
    • s.98
    • /
    • pp.12-18
    • /
    • 2013
  • 고유가 시대에 접어들면서 해양석유 가스 산업에 대한 관심이 그 어느 때보다 뜨겁다. 해양석유 가스 시추를 위한 지출은 2011년 650억 달러 규모에서 2020년에는 1,250억 달러로 2배 늘어날 것으로 전망되고 있다. 이러한 해양석유 가스 개발 확대로 해양플랜트 시장은 2010~2015년 최소 4,970억 달러로 전망되고 있다. 이와 더불어 해양작업지원선(OSV) 시장 역시 향후 수요가 지속적으로 늘어날 것으로 전망된다. 이렇게 해양 석유가스 및 연관 산업이 지속적으로 성장할 것으로 전망되면서 브라질, 나이지리아, 앙골라 등 중남미, 아프리카 등 신흥 시장이 각광을 받고 있다. 그리고 글로벌 석유기업(IOC)을 비롯한 관련 업체들이 이 지역에서 탐사 및 개발(E&P)를 통해 시장진출을 위해 경쟁하고 있다. 이에 대해 신흥 국가들은 자국 내 석유가스 산업의 경쟁력을 제고 시키기 위한 일종의 보호조치로서 '로컬 콘텐츠' 정책을 실시하고 있다. 다음은 한국해양수산개발원에서 발표한 "오프쇼어(Offshore)산업 로컬 콘텐츠 정책의 현대적 의의"의 주요 내용을 요약 정리한 것이다.

  • PDF

A Study On Development of Cargo Working Education System for LNG Carrier (LNG선 하역작업 교육 시스템 개발에 관한 연구)

  • Eum Pil-Yong;Kim Dae-Hee;Song Chae-Uk;Yea Byong-Deok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.89-92
    • /
    • 2005
  • This paper describes a system for LNG carrier's loading and discharging work education This system consists of three modules(cargo work simulation, ballast work simulation and loading calculation module), and could be a useful to train mariners boarding on LNG carrier so as to take a suitable action while their ship maneuvering and cargo handling.

  • PDF

북극항로 운항 선박의 항해안전지원시스템(KARS) 개발 개요

  • Gang, Guk-Jin;Jeong, Seong-Yeop;Kim, Jeong-Jung;Jeong, Seong-Heon;Yang, Chan-Su;Kim, Hyeon-Su;No, Myeong-Il
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.170-172
    • /
    • 2018
  • 지구 온난화로 인해 여름철 북극해의 해빙이 점차 감소함에 따라서 북극항로를 이용한 선박의 화물운송이 점차 증가하고 있다. IMO에서는 극지해역운항선박의 안전성과 해양오염방지를 위하여 2014년에 Polar Code를 개정하였으며, 2017년 1월부터 SOLAS협약과 MARPOL73/78협약에 추가되어 시행되고 있다. 본 연구는 해양수산부 해양안전 및 해양교통시설기술개발 사업으로 1) Polar Code 강제화에 따라 '극지해역 운항선박용 항해안전지원시스템의 개발'의 필요성과 2) 북극항로에 대한 국적선의 안전 운항 확보를 위한 '북극권 국가와의 국제협력 및 공조체계 구축'과 '극지 구난, 구조 및 환경보호 관련 국내법 및 규정 제정'을 위한 기반 연구의 필요성에 의거하여 2014년 11월 10일에 시작되었으며 2018년 12월 31일에 종료될 예정이다. 연구내용은 1) 고정밀도 북극항로 빙상정보 수치예측 시스템 개발, 2) 북극항로 안전속도 예측, 평가, DB구축 및 항행 모델 개발, 3) 북극항로 안전운항을 위한 항해계획 기술 개발, 4) 북극항로 운항선박 건조 및 안전항해 가이드라인 개발이다. 본 논문에서는 개발 중인 KRISO Arctic safe Routing System (KARS)에 대한 소개와 활용 결과 및 향후 계획에 대해서 설명하고자 한다. 본 KARS는 향후 지속적인 수정보완 작업을 통해서 완성도를 높여갈 예정이며, 검증단계를 거쳐서 최적하고 안전한 항로와 운항 관련 정보를 선사와 해기사에게 제공함으로서 북극항로 중 단기 운항계획 수립과 안전 운항을 지원할 수 있을 것으로 기대된다.

  • PDF

A Study on the Basic Design for Platform Support Vessel (PSV) and Hull Form Development for Enhancement of Resistance & Propulsion Performance (해양작업지원선(PSV)의 기본설계 및 저항추진 성능 향상을 위한 선형개선 방안 연구)

  • Yum, Jong-Gil;Kang, Kuk-Jin;Lee, Young-Yeon;Lee, Chun-Ju;Ok, Kun-Do
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.3
    • /
    • pp.196-204
    • /
    • 2018
  • Present paper shows the basic design procedure for platform support vessel operating in open sea, and hull form development process. General design concept considering the operating mission, operating sea condition and shipping freight, etc. is explained shortly. For the hull form design, the initial hull form was designed based on the reference PSVs. The resistance and propulsion test results for the initial hull form with twin Azimuth thruster were analyzed and a few items for improvement were derived. At the next stage, main parameters including Length, Cp-curve, Cb, Lcb, etc. were changed totally for the hull form improvement. Furthermore, 3 different bulbous bows for the fore-body design to reduce the wave resistance and after-body design to reduce the residual resistance were carried out. The best hull form among the 3 fore-bodies with same after-body was selected through the comparison of wave resistance calculation results. Twin ducted Azimuth thruster with the smaller propeller diameter than the former were adapted to increase the propulsive efficiency. The final hull form with the twin Azimuth thruster was evaluated to satisfy more than the target design speed 14 knots in sea condition with sea margin 15% at the 5,000kW BHP through the model test in KRISO.