A study on a Carbon Trust OWA Stage 2 Domestic Verification Case in the Yellow Sea (서해 해상 환경에서 선박형 부유식 라이다의 Carbon Trust OWA Stage 2 국내 인증 사례에 대한 고찰)

  • Yong-Soo Gang;Dong-Chan Chang;Su-In Yang;Baek-Bum Lee
    • Journal of Wind Energy
    • /
    • v.15 no.1
    • /
    • pp.50-59
    • /
    • 2024
  • Floating LiDAR systems provide significant savings in cost and time compared to the fixed meteorological mast measurement type, and have the advantage of being able to be deployed in various locations due to less restriction on the depth of the installation site. However, to use the wind data collected by a floating LiDAR system commercially, verification procedure is required to ensure that the collected data have sufficient availability. The Carbon Trust OWA roadmap presents guidelines in three stages for the reliability of the wind data collected using a floating LiDAR system. Companies developing wind farms are requesting at least Stage 2 (pre-commercial stage) presented by OWA, and many overseas companies are leading the domestic and overseas markets. In this paper, we introduce the case of OWA Stage 2 certification for the commercial operation of floating LiDAR systems.

3MW Class Offshore Wind Turbine Development (3MW급 해상풍력 발전시스템 개발)

  • Joo, Wan-Don;Lee, Jeong-Hoon;Kim, Jeong-Il;Jeong, Seok-Yong;Shin, Young-Ho;Park, Jong-Po
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.491-494
    • /
    • 2009
  • This paper introduces the design concepts and characteristics of WinDS3000$^{TM}$ which is a trade mark of Doosan's 3MW offshore/onshore wind turbine. WinDS3000$^{TM}$ has been designed in consideration of high RAMS (Reliability, Availability, Maintainability and Serviceability) and cost effectiveness for the TC Ia condition in GL guideline. An integrated drive train design with an innovative three-stage gearbox has been introduced to minimize nacelle weight of the wind turbine and to enhance a high reliability for transmission. A permanent magnet generator with full converter system has been introduced to get higher efficiency in part load operation, and grid friendliness use of 50 Hz and 60 Hz grid. A pitch regulated variable speed power control with individual pitch system has been introduced to regulate rotor torque while generator reaction torque can be adjusted almost instantaneously by the associated power electronics. An individual pitch control system has been introduced to reduce fatigue loads of blade and system. The wind turbine has been also equipped with condition monitoring and diagnostic systems in order to meet maintainability requirements. And internal maintenance crane in nacelle has been developed. As a result, the maintenance cost was dramatically reduced and maintenance convenience also enhanced in offshore condition.

  • PDF

Installation of Meteorological Mast for the Test Bed of Offshore Wind Power (서해 100MW 해상풍력 실증단지 기상타워 구축사례)

  • Ryu, Moosung;Kang, Keumseok;Kim, Jiyoung;Lee, Junshin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.55.2-55.2
    • /
    • 2011
  • The final site of offshore wind power plant should be decided by comprehensive examination of various conditions such as wind resource, sea depth, geology, grid connection, social circumstance and environmental issue. Wind condition is typically regarded as the most important factor because wind energy increases in proportion to wind velocity and it directly relates to the amount of power output, efficiency of power plant and profitability. Advanced countries in the offshore wind power sector such as Denmark, UK and Germany, they are analyzing wind resource accurately by installing the meteorological mast in the ocean in order to get the optimal type of wind turbine and maximum generation efficiency. Also, it is made much of designing offshore power plant on the basis of actual measurement by met-mast and those wind farms have a chance to get the loan with reduced interest rate in project financing. In Korea, the HEMOSU-1 is installed in the ocean around Wido island to analyze wind resource of test bed of 100MW offshore wind power on october last year. This paper deals with the design and construction procedure of the first met-mast in Korea and also shows the site characteristics of test bed. Therefore, this paper will give useful information to local governments and private business sector who are trying to construct offshore wind farm and it can also be a good reference for the following projects of meteorological mast in near future.

  • PDF

Evaluation of Implementation Potential of Offshore Wind Farm Capacity in Korea Using National Wind Map and Commercial Wind Farm Design Tool (국가바람지도와 상용 단지설계 프로그램을 활용한 국내 해상풍력단지 공급가능 잠재량 산정)

  • Song, Yuan;Kim, Chanjong;Paek, Insu;Kim, Hyungoo
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.4
    • /
    • pp.21-29
    • /
    • 2016
  • Commercial wind farm design tools and the national wind map are used to determine the implementation potential of offshore wind power in Korea in this study. For this, the territorial waters of Korea were divided into nine analysis regions and a commercial CFD code was used to obtain wind resource maps at 100m A.S.L. which is the hub height of a 5MW wind turbine used in this study. With the wind resource obtained, factors including water depth, distance from substations, minimum and maximum capacity of a wind farm, distance between turbines and wind farms were considered to determine wind power potential. Also, the conservation areas, military zones, ports, fishing grounds, etc. were considered and excluded. As the result, a total capacity of 6,720 MW was found to be the implementation potential and this corresponds to $3.38MW/km^2$ in API. Also if the distance from the substation is not considered, the potential increased to be 10,040 MW. This offshore wind farm potential is considered enough to satisfy the target of wind farm capacities in the 7th national plan for electricity demand and supply.

Transient Effects of Wind-wave Hybrid Platform in Mooring Line Broken Condition (부유식 파력-해상풍력 복합발전 구조물의 계류선 손상 시 과도 응답 해석)

  • Bae, Yoon Hyeok;Lee, Hyebin
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.19 no.2
    • /
    • pp.129-136
    • /
    • 2016
  • Floating offshore structures keep its position by a mooring system against various kind of environmental loadings. For this reason, a reliable design of the mooring system is a key factor for initial design stage of a floating structure. However, there exists possibility of mooring failure, even the system is designed with enough safety margin, due to the unexpected extreme environmental conditions or long-term fatigue loadings. The breaking of one of the mooring lines may change the tension level of the other mooring lines, which can potentially result in a progressive failure of the entire structure. In this study, time domain numerical simulation of 10MW class wind-wave hybrid platform was carried out with partially broken mooring line. Overall platform responses and variations of the mooring line tension were numerically evaluated.

Estimation of Reference Wind Speeds in Offshore of the Korean Peninsula Using Reanalysis Data Sets (재해석자료를 이용한 한반도 해상의 기준풍속 추정)

  • Kim, Hyun-Goo;Kim, Boyoung;Kang, Yong-Heack;Ha, Young-Cheol
    • New & Renewable Energy
    • /
    • v.17 no.4
    • /
    • pp.1-8
    • /
    • 2021
  • To determine the wind turbine class in the offshore of the Korean Peninsula, the reference wind speed for a 50-y return period at the hub height of a wind turbine was estimated using the reanalysis data sets. The most recent reanalysis data, ERA5, showed the highest correlation coefficient (R) of 0.82 with the wind speed measured by the Southwest offshore meteorological tower. However, most of the reanaysis data sets except CFSR underestimated the annual maximum wind speed. The gust factor of converting the 1 h-average into the 10 min-average wind speed was 1.03, which is the same as the WMO reference, using several meteorological towers and lidar measurements. Because the period, frequency, and path of typhoons invading the Korean Peninsula has been changing owing to the climate effect, significant differences occurred in the estimation of the extreme wind speed. Depending on the past data period and length, the extreme wind speed differed by more than 30% and the extreme wind speed decreased as the data period became longer. Finally, a reference wind speed map around the Korean Peninsula was drawn using the data of the last 10 years at the general hub-height of 100 m above the sea level.

A Study on the Calculation of Allowable Continuous Current for HVDC Submarine Power Cables (HVDC 해저케이블의 연속허용전류 계산에 관한 연구)

  • Lim, Chung-Hwan;Park, Hung-Sok;Moon, Chae-Joo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.5
    • /
    • pp.815-824
    • /
    • 2022
  • The growing integration of intermittent renewable sources like offshore wind energy increases the need for transferring electric energy over long distances, which may include sea crossings. One of the solutions available for bulk electric power transmission across large distances encompassing wide and deep sea is using HVDC submarine power cables. However, there are no standards or research related to the calculation of the continuous allowable current with various ocean conditions of a DC power cable that does not have an alternating magnetic field. In this study, assuming the typical two types of subsea cable models and two areas of the south coast and the west coast marine conditions, a continuous allowable current simulation of DC cables was performed. As a simulation result, the DC cable continuous allowable current find out the gradient reduction characteristics based on subsea base depth.

Prospects of Cumulative Installed Power Capacity of Domestic Offshore Wind Projects for K-RE100 (K-RE100 이행에 필요한 국내해상풍력단지 누적 설치량 전망 연구)

  • Hong Goo Kang;Byung Ha Kim;Hun Jo Kim;Chang Jo Yang;Hae Chang Jeong
    • New & Renewable Energy
    • /
    • v.20 no.2
    • /
    • pp.44-54
    • /
    • 2024
  • The objective of this study was to contribute to domestic offshore wind farms by reasonably predicting the expected completion time and installed power generation capacity of offshore wind projects in South Korea. Offshore wind power is drastically regarded as a core tool for clean energy transition and industrial decarbonization in the fight against the climate crisis globally. Especially in South Korea offshore wind power is the main tool in partaking in RE100 and K-RE100, and the Korean government aims to install 14.9 GW of offshore wind farms by 2030. However, this seems to have been significantly delayed due to the complex process of obtaining permits for offshore wind power in Korea. Thus, a reasonable prediction of power generation and a timeline for the final construction are imperative. To establish the delay time for permit licenses, classified location factors were included into site analysis. These factors comprised reviews of transmission and military operability, environmental impact assessment, maritime traffic safety examination, wind resource assessment and an analysis of current offshore wind projects. According to the analysis, the majority of offshore wind projects currently being developed in Korea are predicted to be delayed by 3-5 years as they are among the criteria included in key discussion points for obtaining permits. The cumulative installed power capacity and annual power generation after construction are expected to be 37 GW and 97 TWh respectively.

Application of Smart Grid in U-City Management Center (U-City의 통합운영센터에서 스마트그리드의 적용)

  • Ryu, Sung-Chan;Yoon, Jun-Ho;Han, Jung-Hun;Kim, Tae-Wan;Park, Sun-Kyu
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.133-138
    • /
    • 2010
  • 본 연구에서는 유비쿼터스 도시의 통합운영센터가 가지고 있는 문제점들을 해결할 수 있고, 기존도시와의 IT서비스의 차별성을 위하여 스마트그리드를 운용하는 방안을 제안하였다. 이를 위하여 한국전력의 대리자, 해상풍력에너지 전력생산 및 판매, 그리고 정전대비 보완사항을 제시하였다. 이 연구로 유비쿼터스 도시에 대한 운영비 조달과 수익창출 및 정전에 의한 재난관리 예방이 기대되고, 유비쿼터스도시의 참조모델이 될 것으로 판단이 된다.

  • PDF

해양플랜트 DP 시스템

  • O, Jin-Seok;Bae, Su-Yeong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.06a
    • /
    • pp.405-407
    • /
    • 2011
  • 해양플랜트는 일반적으로 Offshore라고 일컫는 심해 자원을 생산하기 위한 산업 분야를 비롯하여, 해상 풍력 및 조류와 파랑을 이용한 에너지 자원 개발과 관련된 발전 설비 등 해상에 설치되는 모든 사회 기반 시설을 포함한다. 이러한 해양플랜트는 점차 고도화된 기술을 사용하여 미개척 해양 지대로 진출하게 되는데, 육상과 고립되어 해양 환경에 노출되어 있는 만큼 안정적인 시스템을 요구한다. 이는 곧 해양플랜트 설비 자체와 운영 인력들의 안전과도 직결되기 때문이다. 따라서 심해 및 정밀 위치 유지를 위한 DP(Dynamic Positioning) 시스템은 해양플랜트에 반드시 탑재되어야 하며, 운영 환경에 따라 차별화된 DP 시스템이 탑재되어야 한다. 또한 해양플랜트 핵심장비는 국가적인 차원에서 개발이 추진되어야 하며, DP 운영 인력도 체계적으로 양성할 수 있는 메커니즘을 구축해야한다.