Minimum Thickness of Temporary Steel Plate to Prevent Pile Driver Overturning (항타기 전도예방을 위한 임시 철판의 두께에 관한 연구)

  • Bang, Daepyung;Park, Jongyil;Kee, Junghun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.11
    • /
    • pp.5-10
    • /
    • 2020
  • Although pile driver overturning accidents at construction site are not frequent, most leads to serious disasters. The main cause of accidents is uneven settlement of the ground. To prevent this, related guidelines such as KOSHA-C-101-2014, KOSH-A-GUIDE-71-2012, Occupational Safety and Health Standards, and NCS stipulate the installation of steel plates over ground. However, since the required steel plate thickness considering the self-weight of pile drivers and the underlying ground condition is not quantitatively presented, it is randomly applied in the field. In this study, the required minimum steel plate thickness was analyzed based on a numerical analysis (Plaxis 2D). Settlements and soil failure were calculated according to the different type of soils (sand, clay), load distribution and steel plate thickness (10mm, 20mm, 30mm, 40mm). Under all conditions, 10mm steel plate causes soil collapse. From thickness 20mm, the ground uneven subsidence is within 2° of the allowable leader angle.

The Design of Parameters to Improve Actuating Performance in High Frequency Vibro-Hammer(HFVH) and the Study of Characteristic Propagation and Attenuation of Piling Vibration (초고주파 진동항타기의 구동 성능향상을 위한 파라미터 설계 및 항타진동의 전달과 감쇠특성에 관한 연구)

  • Jang, Tae-In;Park, Joon-Hyuk;Baek, Yoon-Su;Kim, Sung-Bae
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.6
    • /
    • pp.763-773
    • /
    • 2004
  • This paper suggests the 2 D.O.F mathematical model of the High Frequency Vibro-Hammer (HFVH), introduces an experimental method for measuring of the attenuation of piling vibration and proves what experiments are coincident with the equation of wave propagation. As vibratory installation of piles and casings has many economic merits in the construction field, most of all contractors prefer to vibratory pile driving method than the other. Compared to impact pile driving, vibratory installation has the advantage of reducing vibration or noise pollution and can drive piles under high frequency. Experiments serve estimations of capabilities and limitations of the HFVH's excitation force and finding of sensitivity for important soil resistance parameters. Also, we discuss the HFVH that can drive with three kinds of input waves (triangular, sine and square wave) and propose the design of parameters to improve actuating performance in it.

A Study on Vibration Analysis and Estimation of Vibration Damping of Tricone-Bits Drilling Machine (Tricone-Bits 천공장비의 진동 분석 및 진동 거리감쇠 추정에 관한 연구)

  • Cho, Seongkyu;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.4
    • /
    • pp.493-499
    • /
    • 2023
  • Recently, with the development of construction machinery, low-vibration construction machine such as Tricone-Bits, which can drill both soil and rock layers and minimize vibration, is being used frequently. However, although many studies have been conducted on the prediction of vibration values for earth augers and pile drivers, the reality is that studies on the effects of vibration on low-vibration drilling equipment are lacking. In this paper, ground vibration values for Tricone-Bits were measured, and a vibration distance damping formula was proposed using this. In addition, after predicting the vibration of the earth auger and pile driver using the previously proposed vibration distance damping formula, the degree of vibration damping for the Tricone-Bits was evaluated by comparing and analyzing it. As a result, the Tricone-Bits showed a vibration reduction effect of 97% and 93% compared to these machine and It will help with management and prediction of the ground vibration effects evaluation on the low-vibration equipment such as Tricone-Bits.

A Study on the Performance Improvement of a Hydraulic Vibro-hammer System (유압식 진동 항타 시스템의 성능 향상을 위한 연구)

  • 정해권;성원준;송창섭
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.17 no.6
    • /
    • pp.169-175
    • /
    • 2000
  • In this study, the hydraulic vibro-hammer system was analyzed and the analysis tool using GUI was developed. From the parametric analysis, the effects of each factor were revealed. Through the simulation with varying parameters, the method to improve the performance of the hydraulic vibro-hammer system was presented. The analysis tool will help an unskilled programmer analyze the hydraulic vibro-hammer system. The result of this study will help improve the performance of the hydraulic vibro-hammer systems.

  • PDF

Measurement and Control of Ground Vibrations due to Precast Concrete Pile-driving by Diesel Hammer (디젤해머에 의한 콘크리트말뚝 항타시(抗打時) 발생(發生)되는 지반진동(地盤振動)의 측정(測定) 및 영향평가(影響評價))

  • Park, Yean Soo;Chon, Chun Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.9 no.1
    • /
    • pp.71-78
    • /
    • 1989
  • This Paper measures and analyzes ground vibrations induced during precast concrete pile-driving using diesel hammer at radii varying from 9m to 30m to evaluate effects of such vibrations associated with deep foundation piling operations near the residential of commercial areas. From this study, characteristics for attenuation and frequency of the vibrations casued by pile-driving are established and the empirical equation for predicting peak velocity and acceleration levels are obtained. This equation can be used to predict the peak vibration levels and select the appropriate hammers for future projects where similar soil conditions to this test site are encountered.

  • PDF

Low Noise Breaker (저소음 브레이커 개발)

  • 김정태;전오성;윤병옥;이영화
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1995.04a
    • /
    • pp.213-216
    • /
    • 1995
  • 공사장의 건설기계 소음은 저주파 에너지를 많이 가지고 있기 때문에, 일단 소음이 발생되면 그 전파가 멀리까지 감쇄없이 진행하는 물리적 특징을 가지고 있으며 현실적으로 흡음재처리를 통한 소음방지효과는 저조한 실정이다. 특히, 선진국에서는 건설기계 등의 엄격한 소음 인증제도 실시로 인해 국내 일부 건설장비 생산제품이 외국에서 요구하는 소음규제치를 초과하기 때문에 저소음, 저진동 건설기계 설계 기술의 발전이 없으면, 향후 수출여건이 점차 어려워지고 있다. 이와같은 주변여건의 변화로 인해 건설기계를 생산하는 입체에서는 공사장 소음과 같은 저주파 에너지에 의해 지배 받는 소음문제를 효과적으로 저감시키기 위한 건설기계의 저소음, 저진동 설계의 필요성을 심각하게 인식하고 있는 실정이다. 건설기계중, 소음이 문제시되는 기계로는 지반정지공사, 기초공사, 콘크리트공사, 포장공사, 파괴 및 해체공사와 기타등 6가지가 있다. 이중에서 환경연구원의 연구결과에 따르면, 항타기, 브레이커 및 착암기가 높은 소음도를 나타내고 있다. 가장 높은 소음을 배출하고 있는 항타기는 기초 공사에 쓰이는 것으로써 지반 천공후 H빔을 싣는 디젤 항타기의 경우, 소음도가 107dBA를 보여주고 있다. 이 값은 기계로부터 7m 떨어진 거리에서 측정된 값이다. 또, 파괴 및 해제공사에 쓰이는 브레이커는 98dBA의 소음도를 보여주고 있다. 착암기는 작용원리에 따라 91-96dBA의 소음을 배출하고 있다. 본 연구에서는 건설기계중 소음이 높아 문제시 되고 있는 유압 브레이커의 저소음 설계기술개발에 관한 내용이다. 저소음 브레이커의 개발을 위해 소음에너지의 전달경로를 검토하고, 현실성있는 소음방지 대책을 제시하였다. 연구결과, 브레이커의 설계개량을 통해, 10dB의 소음저감효과를 볼 수 있어 만족스러운 결과를 도출할 수 있었다.타를 처리하기에는 부적절한 방법임이 널리 알려진 사실이다[3]. 최근에 Ben Mrad와 Fassois[4]는 신호에 잡음이 존재하여도 이를 잘 처리할 수 있는 확률적(stochastic) 방법을 개발하여 기존의 결정적 방법들과 그 결과를 비교하였다. 그러나, 개발된 방법은 응답 신호에 백색잡음(white noise)이 섞이는 특수한 경우에만 사용할 수 있게 만들어져서 이 방법의 실질적인 적용에는 어려움이 있다. 본 연구에서는 기존의 방법들의 단점을 극복할 수 있는 새로운 회귀적 모우드 변수 규명 방법을 개발하였다. 이는 Fassois와 Lee가 ARMAX모델의 계수를 효율적으로 추정하기 위하여 개발한 뱉치방법인 Suboptimum Maximum Likelihood 방법[5]를 기초로 하여 개발하였다. 개발된 방법의 장점은 응답 신호에 유색잡음이 존재하여도 모우드 변수들을 항상 정확하게 구할 수 있으며, 또한 알고리즘의 안정성이 보장된 것이다.. 여기서는 실험실 수준의 평 판모델을 제작하고 실제 현장에서 이루어질 수 있는 진동제어 구조물에 대 한 동적실험 및 FRS를 수행하는 과정과 동일하게 따름으로써 실제 발생할 수 있는 오차나 error를 실험실내의 차원에서 파악하여 진동원을 있는 구조 물에 대한 진동제어기술을 보유하고자 한다. 이용한 해마의 부피측정은 해마경화증 환자의 진단에 있어 육안적인 MR 진단이 어려운 제한된 경우에만 실제적 도움을 줄 수 있는 보조적인 방법으로 생각된다.ofile whereas relaxivity at high field is not affected by τS. On the other hand, the change in τV does not affect low field profile but strongly in fluences on both inflection

  • PDF

A Study on Estimating Time for PRD (Percussion Rotary Drill) Piling Work (도심지 토공사 PRD (Percussion Rotary Drill) 공법의 천공작업 소요시간 산정 방안에 관한 연구)

  • Kim, Yong-Gyu;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.3-10
    • /
    • 2018
  • In recent years, mechanized construction has become commonplace due to increases in the scale and complexity of construction, and construction machinery is a major factor in successful construction. However, even though the proportion of construction machinery is increasing, analysis of the work capacity of construction machinery is inadequate. In addition, since the standards for all construction machines are currently not defined in quantity-per-unit, the construction period is arbitrarily applied according to the operator at the time of the construction plan. As a result, the construction period of the actual construction is insufficient, and rushed work or construction delays occur. Therefore, in this study, in order to calculate the construction period of the piling work of the pile driver used in the PRD method more accurately than the existing method, the formula for calculating the time required for the piling work of the pile driver was established by collecting piling time data from the daily task reports through the field survey. If the precise construction period of piling work is estimated based on the results of this study, it will be possible to prevent the rushed work and construction delays that occur due to the short construction period.