• Title/Summary/Keyword: 항타관리

Search Result 23, Processing Time 0.022 seconds

Feasibility Appraisal and Proposal of a Pile Driving Formula for Domestic Pre-bored Pile Management (국내 매입 말뚝 관리를 위한 항타공식 활용 가능성 평가 및 제안에 관한 연구)

  • Kim, Gunwoong;Seo, Seunghwan;Kim, Juhyong;Chung, Moonkyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.71-84
    • /
    • 2023
  • In accordance with Korean structural foundation design standards, dynamic or static load tests are mandated for 1 to 3% of total piles. The construction quality of the remaining 97% to 99% of piles is determined through penetration measurements. This study aims to enhance the quality control of the majority of piles by adopting a pile driving formula that considers both penetration and hammer energy. The current challenge lies in adapting existing overseas driving formulas to the domestic site conditions, characterized by shallow weathered or soft rocks, and the prevalent use of pre-bored piles. To address this, the Modified Gates formula was refined using domestic dynamic load data, thereby improving its applicability to pile management. Despite employing fewer variables, the proposed formula demonstrates a comparable accuracy to dynamic loading tests in predicting the bearing capacity of pre-bored piles. Consequently, this formula holds promise for practical use in future pile quality management.

Case Study of Friction Piles Driven into Clayey Soils on the Central Coast of Vietnam (베트남 중부 연안의 대심도 점토지반에 시공된 강관 마찰 말뚝의 항타시공관리)

  • Seol, Hoon-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.3
    • /
    • pp.19-31
    • /
    • 2024
  • In Korea, driven piles are generally penetrated up to weathered rock or harder strata. Friction piles have been used to some extent in the southwest coastal area with deep soils; however, friction piles are not extensively due to uncertainties about construction quality. The embedded pile construction method is primarily used due to noise and vibration complaints. However, in Southeast Asian countries (e.g., Cambodia, Myanmar, and Vietnam), where soft sediments are deep, the driven pile method is commonly used due to its economic advantages. Construction companies are increasingly entering overseas construction markets, e.g., Southeast Asia; thus, it is necessary to understand the behavior of driven friction piles in the soil and improve on-site engineering management to gain market competitiveness in these countries. In this study, the bearing capacity of friction piles driven into clayey coastal soils in Vietnam with time-dependent characteristics was evaluated based on the dynamic and static pile load tests. Based on the results, a modified Danish formula is proposed for on-site quality management.

The Application of New Pile Driving Formulas (새로운 항타공식의 적용)

  • 조천환;이명환
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.5
    • /
    • pp.157-164
    • /
    • 2001
  • 말뚝의 항타공식(또는 동적공식)은 간단하고 품질관리를 수행할 수 있는 실용적인 방법으로 이용되어 왔지만 신뢰도는 가정조건의 문제점으로 인해 매우 낮은 것으로 평가되고 있다. 실제적으로 동적공식은 항타시스템 및 항타과정 측면에서 보면 근본적으로 문제가 있는데, 그간의 많은 연구들은 이러한 사실을 고려하지 않은 상태에서 이루어 졌다. 본 연구에서는 동적공식의 문제점에 대해 평가해 보고 이를 바탕으로 새로운 동적공식을 제안하였다. 그리고 현장에서 항타분석기로 실측된 항타시 및 항타후 시험자료를 이용하여 새로운 동적공식의 신뢰도와 적용성을 평가하였으며 그 결과 새로운 동적공식의 실용성을 확인할 수 있었다.

  • PDF

A Case Study on the Design and Drivability Criteria of Steel Pile in Offshore (해상 강관말뚝의 설계 및 항타시공관리 사례연구)

  • Song, Myung-Jun;Park, Yung-Ho;Yoo, Seok-Jun;Sim, Dong-Hyun
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.75-85
    • /
    • 2006
  • The project comprised the construction of the new oil pier and associated topside facilities and demolition of exiting south pier. The site is located approximately 33km south of Kuwait city at MAA refinery. The approach trestle and berth structures of the new oil pier were designed to be supported by steel tubular piles Total 2,480 numbers of piles(795 piles at Approach Trestle, 1187 piles at Berth 1 -4 and 498 piles at Berth 5-6) had to be driven through the calcareous silty sand In this study, the design procedures for offshore steel pipe piles, evaluation for the compression and tension capacities by static and dynamic load test and effective driving criteria by the final set values are discussed

  • PDF

Vibration Evaluation and Accuracy Improvement for a Digital Pile Rebounding and Penetration Monitoring System (DPRMS) (디지털 항타관리기(DPRMS)의 진동영향 평가 및 측정 정밀도 향상 방안에 관한 연구)

  • Hong, Jung-Taek;Lee, Kye-Young;Lee, Sang-Hun;Han, Song-Soo;Chung, Jin-Tai
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.16 no.5 s.110
    • /
    • pp.514-520
    • /
    • 2006
  • In this study, the performance of a digital pile rebounding and penetration monitoring system (DPRMS) is evaluated and the measurement precision of the DPRMS is improved. The DPRMS is a high speed line-scanning camera system to measure the rebound and penetration of a pile in a construction work. A main problem in the DPRMS is a measurement error, which is caused by a shock or vibration due to a hammer impact. The measurement error is investigated by analyzing vibration signals of the DPRMS during the impact. Moreover, the frequency response functions of the DPRMS are also analyzed. As a result, it is found that the tripod height has an influence on the DPRMS performance and a shorter tripod is better. One more founding in this study is that the DPRMS should be placed with a appropriate distance from a pile for improving the measurement precision.

A Study on Marine Pile Construction Management by Real-Time Kinematic GPS Positioning (RTK-GPS 측량에 의한 해상파일 시공관리에 관한 연구)

  • 강길선
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.21 no.4
    • /
    • pp.393-401
    • /
    • 2003
  • Automatic control technologies for the marine pile driving provides accurate and rapid intruding into the planned positions of the pile with planned slope and direction, so that the construction maintenance and management are more efficient and the quality of the construction is more promising. Therefore, in this study, the application scheme of RTK GPS to the automatic control of the pile driving presented. It is expected that the presented scheme using the precise RTK GPS technique assures the efficient and economic 3D positioning accuracy for the precise marine construction management like the precise foundation of marine structures made of piles and the dredging work. It is found that the suggested scheme decrease 60% of the construction error compared with specifications reference because marine position accuracy is measured within 4cm in real time. In addition, the automatic position control system using GPS reduced the construction period and cost compared with existing methods about 30% and 35%, respectively.