• Title/Summary/Keyword: 항내 정온도

Search Result 57, Processing Time 0.027 seconds

An Expremental Study on Connections Friction Test of Improvement for Coastal Environment Block (Coastal Environments 블록의 개발을 위한 연결부 마찰 실험)

  • Kim, Chun-Ho;Kim, Sang-Hoonq
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.49-52
    • /
    • 2008
  • The plain and simple shape water front structure were designed and installed for wave protection and wave resistance. But the installation of these plain and simple structure cause deficiency of environmental affinity. Also the resonance phenomena from the reflective wave and shipwave of the harbor incident wave caused high tide and wave, consequently maintaining the tranquility of inside harbor, give difficulty for mooring the ship and loading-unloading, increase the possibility of ship collision at the quray wall and landing place To solve these problems, we develop the environmentally friendly wave dissipation block. And installation efficiency, stability of the blocks through experiment of C.E Block Joint.

  • PDF

Settlement Behavior of Rubble Mound Breakwater and Its Surrounding Seabed due to Wave-Loads (파랑하중에 의한 경사식방파제의 제체와 주변지반의 침하거동)

  • Yun, Seong-Kyu;Kim, Tae-Hyung;Lee, Kyu-Hwan;Lee, Kwang-Yeol
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.12
    • /
    • pp.85-96
    • /
    • 2011
  • A breakwater is a important structure for both calmness of harbor and protection of the port facilities from waves generated from typhoons or wind. This study adopted the rubble mound breakwater, which is one of the most popular type of breakwaters in Korea. Rubble mound breakwater had been designed by considering only static condition previously. Recently, a dynamic wave-load due to waves has been also considered in designing breakwater. In design, the wave-load is assumed as an uniform load which only acts in the front slope of the breakwater. However, the assumption is not applicable in reality. In this study, therefore, a real-time wave-load acting on the breakwater instead of the uniform load is considered, and it is assumed to be acting on the seabed too. Based on the numerical analysis, it is found that there is a significant difference in the maximum settlement compared with the result predicted by the existing design method.

Analysis of Harbor Tranquility in Pohang New Harbor Using a Hyperbolic Model with Multi-Directional Incoming Waves (다방향 입사파의 쌍곡형 수치모형에 의한 포항신항내 항내정온도 분석)

  • 정원무;이창훈;채장원
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.9 no.2
    • /
    • pp.97-104
    • /
    • 1997
  • A hyperbolic numerical model with multi-directional waves has been used to investigate harbor tranquility in Pohang New Harbor. Comparing numerical results with field data measured at two stations in the harbor, it was found that use of input condition of multi-directional waves is superior to the use of uni-directional waves. Calculations with unidirectional wave input give errors of about 12% at St. P2 and 26% at St. P3, while calculations with multi-directional wave input give errors of 4 % at St. P2 and. 14% at St. P3. Using the input condition of multi-directional waves, we investigate the tranquility of Pohang New Harbor with two layouts : the condition in 1994 when the downtime at the 7th pier was often reported and the condition in 1996 when the 4th disposal site was constructed. The numerical results show that the problem of downtime at the 7th pier cannot be solved by the construction of the 4th disposal site.

  • PDF

Estimation of Harbor Operating Ratio Based on Moored Ship Motion (계류선박의 동요에 기초한 항만가동률 산정)

  • Kwak, Moonsu;Chung, Jaewan;Ahn, Sungphil;Pyun, Chongkun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6B
    • /
    • pp.651-660
    • /
    • 2006
  • Although a harbor may be constructed with calmness in harbor in mind, which satisfies the design standard, it is frequently reported that the motion of moored ships disrupt the cargo handling. This is because of current design standard, which only deals with the wave height in the decision making process of cargo handling, and, now, a new kind of estimation method of operating ratio for calmness based on the motion of moored ship is in need. In this research, a computational method that analyses the harbor operation rate in harbor was put forward by considering the relation of allowable quantity of motion for cargo handling and the computation of the motion of moored ship at wharf by using moored ship motion analysis model. Here, a new estimetion method was applied at Onsan harbor, and it was compared with the current estimation method, and, then, the difference between the two methods was showed. The harbor operating ratio gained by a new method was dropped by 2~11% at ENE and NE directions when it was compared with the operating ratio based on the current design standard. However, when a harbor structure layout is to be designed, a harbor operating ratio test according to the wave height and a harbor operation rate test, which considers the motion of moored ship, are to be run side by side at a harbor designing process.

Evalution for Joints of Coastal Environments Blocks (Coastal Environments 블록 적용을 위한 연결부 강도평가)

  • Kim, Chun-Ho;Kim, Kwang-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.6 s.58
    • /
    • pp.176-182
    • /
    • 2009
  • Other damage can occur due to the preexisting dull structure and installation of nonenvironmental-friendly concrete structure, lack of function for preventing coastal erosion. Increase of personal income and fast spread of the concept of waterfront casued the initiation of many project to improve aging coastal ports. However, none of environment-friendly structure has been developed and pre-existing solid block, igloo block, tunnel block are used commonly. In piers and lighter's wharf where the ships are mooring, resonance by the generation of a reflected wave caused by penetration wave in the port and port wave increases wave heights in the port and makes difficult to maintain the temperature, causes problems in mooring ships and cargo-working, and eventually increase the occurance of damages of the small ships by the collision. Therefore, development of new types of blcok is necessary. To apply Coastal Environments block developed for this reason, it requires allowable bearing capacity evaluation of shear key. For this study, we made test specimen for connecting part of C.E. Block, and conducted friction test of boundary surface. Data obtained by the experiment was analyzed by finite element analysis and assessed the coefficient of friction between C.E. Block and boundary surface.

Littoral Drift by the combined impact of Wind, Wave and Current ant the coastal Development Environment (해안개발환경하에서 바람 ${\cdot}$ 파랑 ${\cdot}$ 흐름의 중첩에 의한 연안표사)

  • Lee, Seung-Chul;Lee, Joong-Woo;Kim, Ki-Dam;Kang, Seok-Jin
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.141-142
    • /
    • 2007
  • In recent years, the rate of mean sea level rise is increasing rapidly from the phenomena of global warming, together with the increasing trend of the storm scale. The issue of sea level rise is multifaceted and produces a range of environmental problems. Especially, high tides and the tidal currents become higher, and wave base increases, so the energy received at the coastal boundary may increase. This brings that many coastal environments go into disequilibrium, such as damages to the structures, erosion, and deposition Similarly it was known that the problems of nearshore processes and damage of berth and counter facilities during storm period had appeared at the small fishery port. Here we try to analyze the impact of the rearrangement of counter facilities and berth layout adopted for tranquility of its'inner harbor. Because this harbor is being connected to channel and open sea, the rearrangement of the structures might affect to the current speed and direction and wave height, so do to the sea bottom undulation. Therefore, we made model test for the several layouts of the berth and breakwater in this area.

  • PDF

Analysis of Berth Operation Ratio in terms of Wave Response at Busan New Port Site (부산신항역 파랑반응에 따른 부두 가동율 해석)

  • Jeong, Jae-Hyun;Lee, Hak-Seung;Lee, Joong-Woo;Yang, Sang-Yong;Jeong, Young-Hwan
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.57-62
    • /
    • 2006
  • Busan New Port, under construction aiming for the hub of Northeast Asia and Partly in operation, had damaged up to 48 billion Won due to Typhoon 'maemi' in 2003. The present criteria of domestic harbor design only describes about the critical wave height with respect to the size of vessel for harbor tranquility. The berth operation ratio which represents the annual available berthing days is depending on the efficiency of cargo handling work and this depends on the motion of the moored vessel due to the wave action and the characteristics of cargo gears. The motion of moored vessel might be related not only to the wave height but also to wave period. Furthermore, the berth operation ratio relies on external forces such as currents and winds, including the characteristics of mooring system and the specification of the moored vessel. In this study we only deal with berth operation ratio in normal sea state, considering wave and current by measured data and numerical calculation. Especially we tried to evaluate the berth operation ratio for each berth adopting the variation of dredging and reclamation plan and the change of wave environment during the process of the new port construction. For better understanding and analysis of wave transformation process, we applied the steady state spectral wave model and extended mild-slope wave model to the related site. This study summarizes comparisons of harbor responses predicted by two numerical predictions obtained at Busan New port site. Field and numerical model analysis was conducted for the original port plan and the final corrected plan.

  • PDF