• Title/Summary/Keyword: 한국 자회사

Search Result 772, Processing Time 0.023 seconds

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage (친환경 리모델링 철거공사 수행을 위한 사전검토 모델 개발)

  • Chae, Seong-Hyun;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.14-23
    • /
    • 2012
  • Due to the increase of aged housing demolition in preparation for the rapid growth of the market, Eco-friendly remodeling demolition work which can minimize environmental destruction have been studied. However, the owner or contractor to apply for eco-friendly remodeling demolition work does not reflect the characteristics of the site can not have a potential for many variables. In addition, There is no standard which can find effective part and catch a problem by performing eco-friendly remodeling demolition. Therefore, the project owner and construction company executives in the Pre-construction stage to the implementation of eco-friendly remodeling demolition construction by providing a model for the pre-evaluating the project. In this paper, the performance of eco-friendly remodeling of demolitions is proposed for the pre-evaluating model. After the eight items were drawn affecting the performances which are influence to accomplishment of the eco-friendly remodeling demolition, evaluation criteria was suggested for each item. Also By classifying and assessing the evaluation items, It will be able to identify the problems and supplements for eco-friendly remodeling demolition. Through the final evaluation sheet, The works of the appropriacy and supplement will be checked for the eco-friendly remodeling demolition. Finally The preinvestigation model is helpful for making the plan of systematic demolition, futhermore It is contribute to the expansion of the eco-friendly remodeling demolition.

Healthy Japan 21 objectives and strategies (일본건강증진 사업의 목표 및 추진전략: Healthy Japan 21)

  • Hoshi, Tanji
    • Proceedings of The Korean Society of Health Promotion Conference
    • /
    • 2005.09a
    • /
    • pp.55-88
    • /
    • 2005
  • Healthy Japan 21의 목적은 삶의 질을 향상시킴은 물론 노동가능 인구집단의 유병률을 줄이고 건강수명을 연장시키기 위하여, 21세기 모든 일본인들이 더욱 건강하고 행복한 삶을 향유할 수 있도록 국가사업을 활성화하는 것이다. 구체적 목적은 조기사망을 예방하고 건강생활을 향상하는 것으로, Healthy Japan 21의 전략적 기획과정에서 건강수명의 연장을 실현하기 위하여 2010년까지 달성되어야 하는 구체적인 목적들이 또한 제시되었다. 조기사망을 감소시키기 위하여 사고, 암, 자살, 심장병 감소의 중요성을 인식하고 9개의 주요 목표로 영양, 신체활동, 휴식과 이완, 금연, 절주, 구강보건, 당뇨병 예방, 심혈관계질환 예방, 암 예방을 설정하였다. 흡연, 알콜, 식사 그리고 운동과 같은 생활양식은 스트레스, 비만, 고혈압과 같은 위험요인 및 질병관리와 관련이 있으며, 위험요인은 암, 심장병, 구강질환의 발생과 밀접한 관련을 갖는다. 따라서 질병의 발생을 예방하기 위해서는 건강증진과 일차예방이 강조되어야 한다. 일차예방에 중점을 두기 위해서 우리는 전통적인 질병관리의 중점사항인 정기적인 건강검진을 통해 질병 조기발견을 노력을 게을리 하지 말아야 할 것이다. 아울러 의료비 감소, 병상에 있는 사람들의 감소, 사회세의 감소도 또한 달성되어야 하는 사업의 결과로 설정되어 있다. 가장 최근의 Healthy Japan 2000(1998-99)의 평가에 따르면 목표들의 15%가 달성되었거나 초과 달성된 것으로 나타났다. 이 중 아동과 청소년의 사망률의 경우, 1-14세 아동의 사망률은 1987년부터 26%가 감소되어 2000년도 목표인 인구 100,000명단 28명의 사망을 초과 달성한 것으로 평가되었다. Healthy Japan 21의 두 가지 주요 전략은 일반 인구집단을 위한 전략과 고위험 집단을 대상으로 하는 전략으로 구성된다. 개인의 건강한 생활양식으로의 변화를 포함한 우리의 건강증진 노력은 사람 중심으로 개인의 선택을 기반으로 하고 있다. 이러한 노력을 지원하기 위하여, 각 개인이 정보를 갖은 상태에서 올바른 선택을 할 수 있도록 적당량의 올바른 정보를 제공하는 것이 필수적이다. 이와 같은 일본의 건강증진계획은 2000년 3월에 Healthy Japan 21이 설립되었으며, 2000-2002년 사이 모든 현이 자신의 사업계획을 설정하였으며, 2001-2005년에는 약 반수 정도의 지방자치단체들이 자신들의 사업계획을 확정하였다. 건강증진을 이루는 중요한 수단은 파트너 쉽에 있다. 정부조직 뿐 아니라 건강보험회사, 보건의료서비스 제공자, 교육단체, 대중매체, 사기업, 봉사단체 등을 포함한 건강분야의 조직들은 자신들의 전문적 기술들을 한데 모아 서로 협력하여야 한다. 또 하나의 중요한 수단은 건강 지지적인 환경이다. 개인의 건강증진 노력을 체계화함으로써 지지적인 환경을 조성할 수 있다. Healthy Japan 21에 대한 평가는 2005년에 중간평가가, 2010에 최종평가가 있을 예정이다. 평가결과들은 이후에 진행될 사업의 향상을 위한 기준으로 활용될 예정이다.

  • PDF

Japanese case of community partnership for Healthy City Projects (일본 건강증진사업의 지역사회 자원과의 연대 구축 사례: 건강도시사업을 위한 지역사회 파트너 쉽 형성 사례)

  • Hoshi, Tanji
    • Proceedings of The Korean Society of Health Promotion Conference
    • /
    • 2005.09a
    • /
    • pp.197-230
    • /
    • 2005
  • 일본의 Soyo town에서 진행된 건강도시사업은 건강증진 프로그램 모형을 통하여 건강한 도시를 건설하겠다는 슬로건을 가지고 주민들이 참여하여 자신의 건강관리능력을 함양하고 서로의 장점을 공유하는 것을 사명으로 하고 있다. 또한 삶의 질 향상, 주관적 건강상태 향상, 삶의 만족도 향상, 정서적 유대감 향상, 수입증가 그리고 조기사망의 감소를 구체적 목적으로 설정하고 있다. 이러한 목적을 달성하게 위한 매우 실제적이며 수량화된 목표들이 설정되어 있다. 1992년에 사전조사를 실시하고 1996년과 2002년에 사후 조사를 실시하였다. 프로그램 내용과 과정에는 보건의료전문가와 시설에 대한 정비, 평가에 대한 계획, 학교를 포함한 포괄적인 보건의료시스템이 포함된다. 모든 부문은 자신들이 설정한 보건정책 결과에 대하여 모니터링을 진행하며 적절한 정책을 다시 설정하고 수량화된 목표를 설정하며 프로그램을 수행한다. 프로그램 수행의 가장 중요한 원칙은 사업의 기획, 수행, 평가 과정에 주민이 최우선적으로 참여한다는 점이다. Soyo town은 사업을 위하여 학교 및 지역 내 사조직과 협력하고 모든 사업의 기획과정에 다양한 구성원들을 참여시켰는데 이는 건강자원 개발에 있어 매우 중요하게 실천되어야 하는 문제이다. 특히 모든 Soyo town의 주민들이 참여하는 것을 원칙으로 하였다. 주민들은 건강관련 자원의 배치상태와 과학적 근거를 고려하여 효과적인 사업을 선정하는 것을 포함한 모든 사업의 과정에 참여하였다. 바람직한 생활양식을 향상시키기 위하여 식품회사, 자원단체 그리고 사회적 관계망 그리고 지역의 단체급식시설, 식당 등이 파악되었으며, 요양원, 가사도우미, 공중보건간호사, 방문간호사, 사회사업가로 구성된 보건의료 시설과 인력들이 협력하였다. 사업이 주민의 건강을 향상시켰는가와 건강향상에 사업이 효과적이었는지를 판단하기 위해서 평가가 진행되었는데, 서비스 제공자 뿐 아니라 소비자와 주민들도 평가를 수행하였다. Soyo town의 건강도시사업의 평가 결과, 조기사망률이 1988년 22.1%이 1992년 18.2%로, 1998년 15.6%로 감소하였다. 또한 주관적인 건강상태는 1988년 48%에서 1992년 67.1%로, 1998년 71.5%로 증가하였다. 전반적으로 주관적 건강상태, 사회적 관계망, 보건의료서비스에 대한 접근성은 증가하였으며, 조기사망, 의료비용은 감소하였다. 한편 보건의료부문의 질적인 향상을 가져왔으며, Soyo town은 건강한 도시의 명성을 얻게 되었다. 사업의 효과성을 향상시킨 요인은 주민 개개인들에게 사업의 기획과정에 처음부터 참여할 기회가 주어졌다는 점과 자원개발에 있어 기존자원의 재개발에 우선순위를 두었다는 점이었다. 효과적인 사업의 수행을 위하여 행정부, 주민, 건강관련 단체들은 수단과 방법에 관한 정보를 교환하는 것이 중요하다. 사업의 기획단계에 모든 이해당사자들이 참여하여 각자의 역할분담을 명확히 하는 것이 필요하며, 건강증진은 개인의 노력 뿐 아니라 사회적 환경의 개선과 자원의 개발을 통해서 달성되는 것이므로 주민들은 건강증진을 위한 환경개선을 위해 노력도 병행되어야 한다.

  • PDF

Probe Vehicle Data Collecting Intervals for Completeness of Link-based Space Mean Speed Estimation (링크 공간평균속도 신뢰성 확보를 위한 프로브 차량 데이터 적정 수집주기 산정 연구)

  • Oh, Chang-hwan;Won, Minsu;Song, Tai-jin
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.5
    • /
    • pp.70-81
    • /
    • 2020
  • Point-by-point data, which is abundantly collected by vehicles with embedded GPS (Global Positioning System), generate useful information. These data facilitate decisions by transportation jurisdictions, and private vendors can monitor and investigate micro-scale driver behavior, traffic flow, and roadway movements. The information is applied to develop app-based route guidance and business models. Of these, speed data play a vital role in developing key parameters and applying agent-based information and services. Nevertheless, link speed values require different levels of physical storage and fidelity, depending on both collecting and reporting intervals. Given these circumstances, this study aimed to establish an appropriate collection interval to efficiently utilize Space Mean Speed information by vehicles with embedded GPS. We conducted a comparison of Probe-vehicle data and Image-based vehicle data to understand PE(Percentage Error). According to the study results, the PE of the Probe-vehicle data showed a 95% confidence level within an 8-second interval, which was chosen as the appropriate collection interval for Probe-vehicle data. It is our hope that the developed guidelines facilitate C-ITS, and autonomous driving service providers will use more reliable Space Mean Speed data to develop better related C-ITS and autonomous driving services.

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

A Re-Routable Smart Shuttle Traveling Scheme for Smart Mobility (스마트 모빌리티를 위한 경로변경이 가능한 스마트 셔틀 운행기법 연구)

  • Chung, Sung-Wook;Kang, Yong-Su;Son, Yeong-Hun
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.13 no.3
    • /
    • pp.243-249
    • /
    • 2020
  • With the development of the 4th Industry Revolution and the progress of related technologies, people have been using various services in a more convenient way in their daily lives. Among these technologies, the smart mobility is a service that effectively transports people or packets from the origin to the final destination using a variety of methods/vehicles. With respect to the smart mobility technology, the shuttle service is operational at the final destination. The conventional shuttle operation only takes into account the shuttle operability and does not consider the shuttle-passenger efficiency at all by the one-way routing. Therefore, in this paper, we propose the smart shuttle algorithm that can change the routes to efficiently support boarding passengers. Our proposed scheme consists of 3 algorithms: the shuttle operating algorithm, the re-routable shuttle traveling algorithm, and the passenger-riding algorithm. All those 3 algorithms are effectively co-operated and collaborated for better performance. In-depth experiments were conducted to analyze and to show the superior performance, resulting in an average 23.6% reduction of destination-arrival time per passenger, average 10.37% reduction of shuttle-waiting time per passenger, and average 15.38% decrease of shuttle traveling time per hour. This proves that our smart shuttle traveling scheme reveals the whole remarkable performance, effectively using the re-routable characteristics.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

Effects of Dysfunctional Customer Behavior, Job Stress and Stress Copying on Job Satisfaction in Insurance Solicitors (고객공격행동, 직무스트레스, 스트레스 대처가 보험설계사의 직무만족도에 미치는 영향)

  • Lee, Sang-Hoon;Park, Seul-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.578-588
    • /
    • 2016
  • Job satisfaction is the primary factor in determining happiness, so people change jobs when they aren't satisfied. In the case of insurance solicitors, high turnover rates imply low job satisfaction. Job stress impacts job satisfaction, and job stress is particularly prominent for insurance solicitors whose job involves working with customers face- to- face. The purpose of this study is to investigate factors influencing job satisfaction for insurance solicitors. Participants in this study consisted of 245 insurance solicitors from 3 insurance company located in Seoul, Kyonggi province and Kyongsang province. Data was collected from self-administrated questionnaires and analyzed using independent t-test, ANOVA, Pearson's Correlation Coefficient, and multiple regression. Job satisfaction showed a significant correlation with dysfunctional customer behavior, job stress, and ability to cope with stress. The main factors of job stress, stress coping ability, and income level had significant influence on job satisfaction for insurance solicitors. The explained variance for job satisfaction was 34%. These findings provide empirical evidence for the importance of job stress and stress coping variables in job satisfaction for insurance solicitors. This study aims to assist in predicting insurance solicitor's job satisfaction.

Empirical Analysis of Selection Criteria of Container Ports in the Bay of Bengal (벵갈만 지역의 컨테이너항만 선택 기준에 관한 연구)

  • Lwin, Theingi;Kim, Hyundeok
    • Journal of Korea Port Economic Association
    • /
    • v.34 no.4
    • /
    • pp.69-84
    • /
    • 2018
  • The purpose of this study is to provide a comparative evaluation of container port criteria at four major container ports in the Bay of Bengal, including Colombo Port in Sri Lanka, Chennai Port in India, Chittagong Port in Bangladesh and Yangon Port in Myanmar. Important container port selection criteria are identified and comparisons among container ports are made using previous studies, personal interviews and questionnaires, completed by top shipping companies, freight forwarders, logistics service providers, and experts in Myanmar. The AHP method is used to verify the research model and hypothesis. This study identified five main criteria and eleven sub-criteria when choosing potential regional hub ports among the four ports in the Bay of Bengal. The main findings from the five main criteria suggest that port efficiency is the highest priority criteria, and the second priority is port costs. The criteria of geographical location and available port facilities are the third and fourth most important, respectively, and the last priority is port's hinterland. Regarding the relative competition among these ports, Colombo Port obtained the highest priority among the four influential factors except for port hinterland. This study has certain limitations that will require future research. First, the sample group for the population size is relatively small. Second, interviewees had limited experience answering questionnaires using this methodology and a limited amount of time was available for respondents for the interviews.