• Title/Summary/Keyword: 한계 사이클

Search Result 76, Processing Time 0.026 seconds

Design and Implementation of HPC Job Management Framework for Computational Scientific Simulation (계산과학 시뮬레이션을 위한 HPC 작업 관리 프레임워크의 설계 및 구현)

  • Yu, Jung-Lok;Kim, Han-Gi;Byun, Hee-Jung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.554-557
    • /
    • 2016
  • Recently, supercomputer has been increasingly adopted as a computing environment for scientific simulation as well as education, healthcare and national defence. Especially, supercomputing system with heterogeneous computing resources is gaining resurgence of interest as a next-generation problem solving environment, allowing theoretical and/or experimental research in various fields to be free of time and spatial limits. However, traditional supercomputing services have only been handled through a simple form of command-line based console, which leads to the critical limit of accessibility and usability of heterogeneous computing resources. To address this problem, in this paper, we provide the design and implementation of web-based HPC (High Performance Computing) job management framework for computational scientific simulation. The proposed framework has highly extensible design principles, providing the abstraction interfaces of job scheduler (as well as bundle scheduler plug-ins for LoadLeveler, Sun Grid Engine, OpenPBS scheduler) in order to easily incorporate the broad spectrum of heterogeneous computing resources such as cluster, computing cloud and grid. We also present the detailed specification of HTTP standard based RESTful endpoints, which manage simulation job's life-cycles such as job creation, submission, control and status monitoring, etc., enabling various 3rd-party applications to be newly created on top of the proposed framework.

  • PDF

A Study on Management and Utilization of Non-disclosure Records (비공개 기록의 관리와 활용에 관한 연구)

  • Ahn, Ji-Hyun
    • The Korean Journal of Archival Studies
    • /
    • no.13
    • /
    • pp.135-178
    • /
    • 2006
  • The response of public organizations on information offerings has affirmed that the arrangement of the management of records is an important project to be implemented ahead of the enforcement of the information disclosure system. In particular, the absence or non-disclosure of information of public organizations on records containing significant information and abuse of the secret disposition of information has demonstrated that it is imperative to improve radically the management of secret or non-disclosed records as well as overall changes of awareness. This study reviewed the reality of the current non-disclosure and management of confidential records based on the awareness on such records and proposed improvement measures. The study on non-disclosed and confidential records has been discussed from legal and administrative perspectives so that the main focus has been on the institutional aspect. Yet, there is a limitation on such discussions in that there cannot be fundamental access to issues of non-disclosed and confidential records. That is because the management of information classified as non-disclosed and confidential can be improved fundamentally when all processes from the production of the records to their management are carried out reasonably. Accordingly, since our record management system is divided into three phases of the disposition division, record center, and archives and takes a management record by being applied to the flow of the life cycle of records, we have reviewed overall issues from the production of non-disclosed and confidential records to the utilization of the records pursuant to these steps and offered directions for improvement.

A Study on the Measures for Detection Error from the Displacement Distortion of the RADAR Waveform (레이더 전파의 왜곡현상에서 오는 탐지 오류 저감 방안 연구)

  • Kim, Jin Hieu;Kim, ChangEun;Lee, Yong-Soo
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.1
    • /
    • pp.36-44
    • /
    • 2019
  • $21^{st}$ century is digitally civilized era. Technologies such as AI, Iot, Big Data, Mobile and etc makes this era digitally advanced. These advancement of the technology greatly impacted detection range of the radar. Human's eye sight can see about 20Km and hear 20 ~ 20000 Hz. These limitations can be overcome using radar. This radar technology is used in military, aircraft, ship, vehicle and etc. to replace human eye. However, radar technology is capable of making False Alarm Rate. This document will propose the fix of these problems. Radar's distortion includes beam refraction, diffraction and reflection. These inaccurate data result in deterioration of human judgements and my cause various casualties and damages. Radar goes through annual testing to test how many false alarm is being produced. Normal radar usually makes 10 to 20 False alarms. In emergency situation, if operator were to follow this false alarm, this might result in following false object or take 12 more seconds to follow the right object. This problem can be overcome by using different radar data from different places and angles. This helps reduces False Alarm rate and track the object twice as fast.

A Study on the Scheme of Implementing Meta-data Based Applications for Enterprises (메타 데이터 기반의 기업용 애플리케이션 구축 방안에 관한 연구)

  • Jang, Gil-Sang
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.9
    • /
    • pp.135-145
    • /
    • 2009
  • Generally, the phases of constructing information systems are consisted of systems planning and selection, system analysis, system design, and system implementation and operation. These systems require many efforts and costs for additional development of modification requirements due to a frequent changes of business environments and business processes. Especially, inconsistencies between system design and system implementation usually happen during development steps because of the difficulties of program developments due to difficulties of capturing exact user requirements and frequent changes of user requirements. This paper proposes a scheme of implementing meta-data based applications for enterprises in order to reduce inconsistencies between system design and system implementation and to overcome limits of the existing coding-based development methods of applications which must use until disuse if they are developed once. Also, this paper presents a framework of repository system to systematically manage and utilize meta-data. The core concept of the proposed scheme makes outputs generated in the phases of system analysis and design into meta-data and is to easily develop and customize application programs using meta-data repository. Also, to show the applicability of the proposed scheme, it is applied to implement ERP system of 'H' automotive part manufacturer. As a result, the proposed scheme can gain improvements such as easiness and productivity of program development, easiness of maintenance, reusability of program components, etc.

Cyclic Seismic Testing of Cruciform Concrete-Filled U-Shape Steel Beam-to-H Column Composite Connections (콘크리트채움 U형합성보-H형강기둥 십자형 합성접합부의 내진성능)

  • Park, Chang-Hee;Lee, Cheol-Ho;Park, Hong-Gun;Hwang, Hyeon-Jong;Lee, Chang-Nam;Kim, Hyoung-Seop;Kim, Sung-Bae
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.4
    • /
    • pp.503-514
    • /
    • 2011
  • In this research, the seismic connection details for two concrete-filled U-shape steel beam-to-H columns were proposed and cyclically tested under a full-scale cruciform configuration. The key connecting components included the U-shape steel section (450 and 550 mm deep for specimens A and B, respectively), a concrete floor slab with a ribbed deck (165 mm deep for both specimens), welded couplers and rebars for negative moment transfer, and shear studs for full composite action and strengthening plates. Considering the unique constructional nature of the proposed connection, the critical limit states, such as the weld fracture, anchorage failure of the welded coupler, local buckling, concrete crushing, and rebar buckling, were carefully addressed in the specimen design. The test results showed that the connection details and design methods proposed in this study can well control the critical limit states mentioned above. Especially, the proposed connection according to the strengthening strategy successfully pushed the plastic hinge to the tip of the strengthened zone, as intended in the design, and was very effective in protecting the more vulnerable beam-to-column welded joint. The maximum story drift capacities of 6.0 and 6.8% radians were achieved in specimens A and B, respectively, thus far exceeding the minimumlimit of 4% radians required of special moment frames. Low-cycle fatigue fracture across the beam bottom flange at a 6% drift level was the final failure mode of specimen A. Specimen B failed through the fracture of the top splice plate of the bolted splice at a very high drift ratio of 8.0% radian.

'Becoming Regular Employees': A Variation of the Struggle and Bargaining of Irregular Workers at Hyundai Motor Company, 2003-2016 (현대자동차 비정규직의 정규직 되기: 투쟁과 협상의 변주곡, 2003-2016년)

  • Yoo, Hyung-Geun;Jo, Hyung-Je
    • Korean Journal of Labor Studies
    • /
    • v.23 no.1
    • /
    • pp.1-45
    • /
    • 2017
  • The aim of this study is to analyze the process of the struggle and bargaining for the change of the employment position of the irregular (in-house subcontracted) workers being at work in the Hyundai Motor Company (HMC) plants into the status of the regular employee of the company, and evaluate the results and limitation of the irregular workers' movement. Since the unionization of irregular workers in 2003, they have carried on the struggle against and the bargaining with the HMC, over the past 10 years and more, making claims for abolishing 'illegal temporary agency work' and for converting their positions into the regular ones. The HMC have gradually altered a confrontational stance against the workers' claim at the early stage, into the bargaining relationship with irregular workers' union. Eventually, the collective agreement on the 'special hiring' of about six thousands irregular workers by the HMC was reached in 2016. We attempt to analyze in depth the overall process by dividing three phases of the movement, according to the criteria of the relationship between the alliance and conflict system, and the cycle of protests of irregular workers. Furthermore, we try to trace the long and winding path of the movement, focusing on the cooperation/conflict relationship within the movement's alliance system, the confrontation/bargaining relationship between the movement and the conflict system, and the critical roles played by mediators (or third parties) between two systems. In the conclusion of the paper, we evaluate the results and limitation of the irregular workers' movement upon the basis of the following points; the convergence of the workers' demands into the prime goal of 'becoming HMC's regular employee,' the breakaway of regular workers' union from the movement's alliance system, and a virtual extinction of irregular workers' union after the final labor-management agreement of 2016.