• Title/Summary/Keyword: 하저터널

Search Result 42, Processing Time 0.029 seconds

Risk analysis and countermeasures for subsea tunnel planning of national road 77 construction work between Abhae and Hwawon (압해-화원 간 국도77호선 건설공사 해저터널 계획을 위한 리스크 분석 및 대책방안)

  • Kim, Young-Joon;Kim, Zu-Cheol;Lee, Jae-Sung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.15-38
    • /
    • 2022
  • Recently, tunnel technology in Korea has shown various achievements such as long tunnel and large section by tunnel construction using TBM in Korea and abroad. Especially subsea tunnels are frequently designed and constructed. The Ga-deok subsea tunnel was completed in December 2010, and the Incheon North Port Tunnel was opened and operated in 2017, and the Bo-ryeong subsea tunnel between Dae-cheon Port and Won-san Island will be completed in 2021. In foreign countries, many subsea tunnels have been constructed and operated in such as Norway and Japan. The main technical problem in the construction of subsea tunnel is to secure stability due to high water pressure conditions and large-scale seawater inflow in fault zones and weak zones. In this paper, various risk factors and solutions are described in the subsea tunnel planning of national road 77 construction work between Abhae and Hwawon.

Development of Countermeasure Expert System for Tunneling Failure (터널 붕락특성과 시공 중 보강공법 선정방법 개발)

  • 김창용;박치현;배규진;홍성완;오명렬
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.418-429
    • /
    • 2000
  • Many Studies of tunnel and tunnelling safety have been developed continuously based on the increasing social interests in underground space since 1990's in Korea. Because the growth of population in metropolitan has been accelerated at a faster pace than the development of the cities, underground facilities have been created as a great extent in view of less land space available. In this study, a lot of types of tunnel failure were surveyed and the detail causes were studied after many cases of tunnel failure were collected. There were suggested brief countermeasure of tunnel failure through case study. An expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river. This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF

Development of Countermeasure Expert System for Tunneling Failure (터널 붕락특성과 시공 중 보강공법 선정방법 개발)

  • 김창용;박치현;배규진;홍성완;오명렬
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2000.09a
    • /
    • pp.171-181
    • /
    • 2000
  • Many Studies of tunnel and tunnelling safety have been developed continuously based on the increasing social interests in underground space since 1990's in Korea. Because the growth of population in metropolitan has been accelerated at a faster pace than the development of the cities, underground facilities have been created as a great extent in view of less land space available. In this study, a lot of types of tunnel failure were surveyed and the detail causes were studied after many cases of tunnel failure were collected. There were suggested brief countermeasure of tunnel failure through case study. An expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river. This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF

Preventing disaster system of the subaqueous tunnel under the Han river in the Bundang railway (분당선 한강 하저터널의 방재시스템)

  • Kim Yong-Il;Hwang Nak-Yeon;Yoon Young-Hoon;Jie Hong-Keun;Jang Sung-Wook;Kim Dong-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.308-327
    • /
    • 2004
  • As use of tunnels and subways increase there also are accidents proportionate to it. Daegu Subway Station fire, Hongjimoon tunnel fire led people to be conscious of disaster protection and as a result, there is a trend to adopt standards for fire protection. Accordingly, this thesis is focused on investigating various fire and water protection related issues for subaqueous tunnel under Ran river. The thesis developed evacuation and disaster prevention plan as fire level increases and have identified the suitability of disaster prevention through evacuation and fire simulation, countermeasure of a water leakage during construction and operation considering the subaqueous tunnel. And we selected EPB shield TBM equipment considering the ground condition and effect of boring hole, and accomplished reasonable water protection design through setting goals using event-tree method, as well as examining model test of boring hole and flooding in heavy rain. Also included structured total system consist of water leakage sensing system, water protection gate, pumping system and fire protection system to respond systematically in emergency.

  • PDF

Convergence-confinement method of a tunnel with the consideration of seepage forces (침투력을 고려한 터널의 내공변위 제어 미케니즘)

  • Lee, In-Mo;Yoo, Seung-Youl;Nam, Seok-Woo;Shin, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.187-195
    • /
    • 2005
  • When a tunnel is excavated below groundwater table, the groundwater flow occurs towards the tunnel resulting in the seepage pressure. In this paper, the effect of groundwater flows on the behavior of shotcrete lining installed between ground-liner interfaces was studied considering permeability ratio between the ground and the shotcrete into account. Three-dimensional coupled finite element analysis was performed for this assessment. Seepage forces will seriously affect the shotcrete behavior since arching phenomena do not occur in seepage forces. A parametric study was conducted on the various tunnelling situations including interfacial properties between ground and shotcrete lining, the shape of tunnel cross-section and the thickness of liner, etc. Moreover, the convergence-confinement method (CCM) of a NATM tunnel considering seepage forces was proposed. The result showed that the more water tight is the shotcrete, the smaller is the convergence and the larger is the internal pressure. Therefore, the watertight fiber-reinforced shotcrete is found to be even more advantageous when used in under water tunnel.

  • PDF

Stability analysis of shield tunnel segment lining by field measurement and full scale bending test (실대형 하중재하 시험 및 현장계측을 통한 쉴드터널 세그먼트 안정성 분석)

  • Lee, Gyu-Phil;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.5
    • /
    • pp.611-620
    • /
    • 2019
  • The shield tunnel was mostly applied to cable tunnel with a diameter of 3~4 m, recently 7.8 m diameter shield tunnel was constructed in the lower section of the Incheon International Airport runway and is planning or under construction to roads and railway tunnels in the lower section of the Han River. Segments are also becoming larger as the shield tunnel cross-section increases, which causes a number of problems in the design, construction, and performance evaluation of segments. In this study, segment lining structural safety, criteria for serviceability check considering axial forces and quality control method for approximately 8 m in diameter shield tunnel were reviewed by field measurements and full scale bending test.

한강하저 터널에서의 지반상태에 따른 보강공법 -그라우팅을 중심으로-

  • 박남서
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1995.03a
    • /
    • pp.27-40
    • /
    • 1995
  • 한강하저의 지질은 수많은 대ㆍ소 단층들로 인해 심하게 교란되어 있어 지질상황의 변화가 매우 심하며, 터널을 굴착함에 있어 지하수의 유입을 차단하는 것이 안전시공을 위한 필수 과제로 직면한다. 본 고에서는 기 시공실적을 바탕으로 암반상태에 따른 차수그라우딩의 패턴을 비교ㆍ검토하였다. 본 구간에서는 암반상태에 따라 5가지 패턴이 적용되었으며, 경암 암반일 경우는 상부반단면만을 주입범위(주입범위 : 3.5m, 28공)로 하고 암반의 전단강도증진을 위해 강관보강을 시행하였다. 연암 암반 내지 파쇄대가 부분적으로 협재된 경우는 상부반단면만을 주입하되 주입범위 및 그라우팅 공수를 늘리는 방식(주입범위 : 5∼7, 42∼56공)으로 보강하였다. 풍화암 암반의 경우는 전단면을 주입범위로 하여 그라우팅 공수를 늘림(주입범위 : 7m, 81공)으로서 차수효과를 증진시켰다. 또한 본 공사구간 중 가장 난제였던 연약지반대(잔류토 내지 풍화토) 85m 구간은 자문회의 등을 거쳐 주입범위, 주입길이 및 주입공수, bulk head 구간을 늘려 시공하고, 굴착하면서 차수효과를 확인하는 방식을 취하였다.

  • PDF

종합건설업체 탐방(13)-투명.윤리경영 실천을 통해 최고 종합건설사로 발돋움하는 남광토건(주)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.204
    • /
    • pp.51-56
    • /
    • 2007
  • 1947년‘남광토건사’로 창립, 올해 60주년을 맞이한 남광토건(주)은 한국전쟁으로 피폐된 국토재건에 나서며 토목분야에 빠른 성장을 거듭했다. 국내에서는 축적된 기술력과 시공경험을 바탕으로 국내 최초 한강하저터널인 지하철 5호선 공사를 비롯, 서울지하철 2~8호선 공사를 성공리에 마쳤다. 또한 필리핀과 중동, 아프리카 등 해외 건설분야에 진출해 특히 앙골라에서만 총 55,200만 달러를 수주하는 등 괄목할 만한 성과를 나타내고 있다. 남광토건(주)은「설계가 다른 아파트」를 컨셉으로 건축미학과 편리함을 갖춘 자연친화적 아파트브랜드‘하우 스토리’를 개발, 주택사업 비중을 높이고 있으며 올해 1조3,800억원 수주와 매출 6,500억원, 경상이익 300억원 을 목표로 하고 있다. 남광토건(주)은 효율성을 극대화 하고 개개인의 역량을 최대한 끌어내 시너지효과를 창출 할 수 있도록 정비할 예정이며 투명·윤리경영으로 종합건설업계 30위권 진입을 위해 오늘도 정진하고 있다.

  • PDF

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

Auxiliary Reinforcement Method for the Safety of Tunnelling Face (터널 막장안정성에 따른 보강공법 적용)

  • Kim, Chang-Yong;Park, Chi-Hyun;Bae, Gyu-Jin;Hong, Sung-Wan;Oh, Myung-Ryul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.11-21
    • /
    • 2000
  • Tunnelling has been created as a great extent in view of less land space available because the growth of population in metropolitan has been accelerated at a faster pace than the development of the cities. In tunnelling, it is often faced that measures are obliged to be taken without confirmation for such abnormality as diverged movement of surrounding rock mass, growing crack of shotcrete and yielding of rockbolts. In this case, it is usually said that the judgments of experienced engineers for the selection of measure are importance and allowed us to get over the situations in many construction sites. But decrease of such experienced engineers need us to develop the new system to assist the selection of measures for the abnormality without any experiences of similar tunnelling sites. In this study, After a lot of tunnelling reinforcement methods were surveyed and the detail application were studied, an expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The expert system developed in this study have two main parts named pre-module and post-module. Pre-module decides tunnel information imput items based on the tunnel face mapping information which can be easily obtained in-situ site. Then, using fuzzy quantification theory II, fuzzy membership function is composed and tunnel safety level is inferred through this membership function. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river. This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF