• Title/Summary/Keyword: 하자유형

Search Result 50, Processing Time 0.03 seconds

A Study on the Contractor's Liability for the Defects in the Public Construction Works (공공건설사업의 하자에 대한 수급인의 책임에 관한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2002
  • Although Public Construction Works in Korea have been executed according to Government Contract Act, and nature of contract is very complicated. So it is difficult to define liability for the defects. Therefore the studies on the defective performance and contractor's defects liability were remained one of the non-cultivated virgin land. As a result, contract privy waive the right to claim or generally resolve the problems. Therefore domestic and overseas liability for the defects was investigated and liability for the defects, under and after construction, on the defective performance and defects, was analysed. With a literature research, contractor's defect liability was systematically analyzed, problems were defined and resolution of the problem were suggested item by item in this study.

  • PDF

Prediction Model Development of Defect Repair Cost for Apartment House according to Performance Data (실적 자료에 의한 공동주택 하자보수비용 예측모형 개발 방안)

  • Kim, Byung-Ok;Je, Yeong-Deuk;Song, Ho-San;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.459-467
    • /
    • 2011
  • The work of constructing apartment housing involves various fields of industry that are linked to each other, and is based on a design document prepared by multiple technicians and architects. Consequently, design errors, material flaws or faulty construction works can cause defects, which sometimes overlap with each other. Construction companies should repair any defects found in a completed building within a specified period of time, and to do this, should establish a business plan by efficiently predicting the cost of defect repair. As it is very difficult for companies to accurately predict the occurrence of defects, historical performance data is used as a base. For domestic apartment housing units, data on the cost of defect repair is insufficient, so there are hardly any methods that can be used to make precise predictions. Therefore, the intent of this study is to develop a model that can predict the cost of defect repair by supply type and area, based on historical performance data with ten years worth of post-completion.

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (효율적인 품질관리를 위한 공동주택 하자위험 분석)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.510-519
    • /
    • 2019
  • The aim of this study was to set a defect classification framework and evaluate the defect risks in apartment buildings For this, approximately 15,056 defect items for 133 apartment buildings were examined. As a result of the analysis, the major defect of the RC work was cracks, which were found mainly in public locations. Moreover, the RC work was found to exhibit a high defect risk of water problem and surface appearance, which are highly connected with cracks. Second, the finish work has a high defect risk because it is composed of various work types, and there are many kinds of materials and construction parts involved. Third, the major defects of the waterproof work were incorrect installation and missing tasks, which have high defect risks in the garage. This is because defects that require rework occur mainly in the underground garage. Based on these results, this study proposed countermeasures for defect risk management to be considered in the construction, handover, post-handover, and occupancy phases. These have been set in detail based on the three zones: low frequency high severity (LFHS), low frequency low severity (LFLS), and high frequency low severity (HFLS).

M&A 아카데미 - M&A유형과 사례(2)

  • Sin, Gi-Hun
    • Venture DIGEST
    • /
    • s.130
    • /
    • pp.36-37
    • /
    • 2009
  • 자바로 유명한 세계적 IT기업 썬마이크로시스템즈가 오라클과 합병한다는 소식이 세계 IT시장을 떠들썩하게 하고 있다. 썬은 이미 IBM과 상당히 발전된 M&A 논의를 진행시키다 오라클로 방향을 선회하는 깜짝쇼를 보여주었고, 이에 오라클은 첫 1년간 영업이익 15억 달러 증가를 예상하고 있다고 한다. 이미 피플소프트와 BEA 등 기업용 소프트웨어 및 서비스업체를 인수하며 성장해온 오라클은 서버기업인 썬을 인수하면서 SW/HW 모두를 망라하는 전방위 IT 기업으로 '단숨'에 성장하게 되었다. 그러나 이제부터다. 어떤 기업이든 M&A를 결정한 이후로 얼마나 전략적으로 과정을 진행하느냐에 따라 기업의 업그레이드를 이뤄낼 수 있다. 이번 호에서는 지난 호에 이어 주식스왑을 중심으로 M&A유형과 사례를 살펴보도록 하자. 아울러 또 다른 M&A의 유형인 주식의 포괄적교환과 꼭 알아두어야 할 몇 가지 항목을 살펴보도록 하자.

  • PDF

Analyzing Leakage Defect Types in Educational Facilities and Deriving Key Management Strategies Using the FTA Method (FTA기법을 이용한 교육시설 누수 하자 유형 분석 및 주요 원인 관리방안 )

  • Jung, Daegyo;Park, Hyunjung;Lee, Dongyeop;Kim, Daeyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.42-49
    • /
    • 2024
  • In recent years, the construction industry has diligently focused on improving the quality and safety of buildings through smart technologies. However, there is a growing trend of leakage defects, especially in educational facilities, due to aging. The objective of this study is to analyze the causes of these defects in educational environments using the Fault Tree Analysis (FTA) technique and propose preventive measures based on the findings. The FTA technique is explained through a review of domestic literature, and data from the Educational Support Center from 2019 to 2021 are examined to identify major defects. The construction of the Fault Tree (FT) for leakage defects resulted in the identification of 12 basic events. Subsequently, a comprehensive understanding of the causes of leakage is achieved through FTA analysis, leading to the identification of the primary causes of defects. Leakage defects accounted for 46.8% of all reported issues in educational facilities, with roof (ceiling) leaks being the most common problem. FTA analysis revealed that poor substrate treatment was the main cause of roof (ceiling) leaks, which could be attributed to cracks in the waterproof layer, joint cracks, and microvoids in the waterproof layer. The primary achievement of this research is to provide essential data for preventing leakage defects in educational facilities and developing preventive measures through the FTA technique. These results are expected to significantly enhance the management of educational facilities and the prevention of leakage issues.

A Study on the Defect Causes Type for Poly-Urethane Waterproofing in Roof (옥상 방수에 있어서 폴리우레탄 도막방수의 하자발생 유형에 관한 연구)

  • Shin, Hyung-John
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.128-134
    • /
    • 2005
  • Up to now, the various water proofing methods and materials have been developed. For the water proofing methods, poly-urethane membrane method is one of the commonly used and increase market share in water proofing industry due to it's many advantages. However, in spite of it's many advantages over other water proofing methods, water proofing defect occurs frequently. With this respect, the study investigate water proofing defect causes in roof water proofing. The study investigate 13 water proofing construction site in Sunchon city in oder to find urethane membrane defection causes and their type. As a results of the study, the followings are founded. 1) Among various water proofing defection causes, problems of water remain phenomenon due to surface horizontal level defect which occupy $25\;\%$ of total defect causes is the most commonly occur. 2) The second defect cause which occupy $15\;\%$ of total defect causes is the swell up phenomenon due to surface dry problem. For the prevention of water proofing defection in roof using urethane membrane, the followings are recommended. 1) Faultless surface treatment before using urethane membrane 2) Develop improved urethane membrane material 3) Improve urethane membrane construction technique

A Proposal of Repair Cost Estimating Criteria for Persistent Defects in Apartment Houses

  • Lee, Hae-Jin;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.597-608
    • /
    • 2011
  • It has been often noted as a problem that as there are no objective and clear criteria for the repair cost estimate of persistent defects, when a claim arises in relation to an apartment construction, significantly different amounts of compensation may be given for similar defects based on the experience and tendencies of the construction experts asked to make a judgment. For this reason, this research aims to present defect managers with a more reasonable and objective estimation criteria and a system to determine the repair cost of defects based on an analysis of relevant factors. The research findings show that the historical cost system is applied first, and then a standard of estimation is used to estimate the cost for the items that are not included in the historical cost system. The criteria for the repair cost for each defect is as follows: the repair cost for defects arising from a regulation violation is determined by calculating the reconstruction cost of the parts in question after demolishing them; the repair cost for progressive defects is determined based on a contribution ratio proportional to the age of the building; the repair cost for repetitive defects is calculated by considering an alternative to maximize the intended function of the defective parts; and the repair cost for value depreciation defects is determined based on the ratio of the warranty period to the lapsed years. However, repair cost estimation for dual value depreciation defects should be studied in future research.

Developing Countermeasure Model to Prevent Planned Lawsuit on Apartment Construction Defects (공동주택 하자기획소송에 대한 건설사 사전 대응 모델 개발)

  • Cho, Youngsun;Cha, Heesung;Kim, Kyungrai;Hwang, Youngkyu;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.74-82
    • /
    • 2014
  • The proportion of apartment housing has been increased to solve the housing problems resulted from rapid growth in urban population and urban economy. With the increase in apartment's proportions and the concern about quality of housing, the contractors have made efforts to satisfy the customers in improving the quality of housing. Despite these efforts, the conflicts between the contractor and the customers are getting serious. Also the disputes and the litigation of defect are increasing because of the contractor's negative treatment and inadequate countermeasure. In this study the defect lawsuits which bring actions against the contractors are collected and analyzed. And then the strategic countermeasures are proposed according to the classifying the type of defect and size. The suggested countermeasure model before the defects are resulted is expected to contribute in developing the contractors strategies to reduce the conflicts against customers.

법령과 고시 - 건설산업기본법 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.240
    • /
    • pp.38-41
    • /
    • 2010
  • 국토부는 하수급인의 계약상 이익을 부당하게 제한하는 특약유형을 구체화하고 하도급대금 직접지급 공공기관의 범위 확대 등의 내용을 담은 건설산업기본법 시행령 개정안을 지난 5월 27일 공포하고, 6월 30일부터 시행에 들어갔다. 다만, 건설근로자 퇴직공제 가입대상 공사범위 확대 관련 조항은 9월 30일부터 시행에 들어간다. 개정된 시행령은 하수급인의 계약상 이익을 부당하게 제한하는 특약유형을 보험료 미지급, 하자담보책임 전가, 하도급대금 조정 미반영 등으로 구체화 했으며 하도급대금 직접지급 공공기관의 범위를 공기업, 한국농어촌공사, 한국철도시설공단, 지방직영기업, 지방공사 및 지방공단 등으로 확대했다.

  • PDF