• Title/Summary/Keyword: 하자보수종료

Search Result 2, Processing Time 0.015 seconds

A Study on the Completion procedure of Defect Repair for Apartment Housing (공동주택의 하자보수 종료 절차에 관한 연구)

  • Jun Woo-Taek;Nam Gyoung-Woo;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.283-286
    • /
    • 2002
  • Defect problems happening in the course of stressing quantity expansion of residence supply due to lark in maintenance are intensifying insincerity of construction business resulting from the psychological and economic damage, and there are many quarrel between residence suppliers and consumers. Because an apartment house's qualify is decided by various elements from design, to lotting-out, construction, and after-management, it is limited to express house capacity and standard to appraise defect objectively and quantifiably. The bound of defect and the period of guarantee expressed cleary in regulation of apartment house lack in quantifiable concept, and guarantee of defect is composed of a general concept. Therefore the big difference in opinion about defect and the bound of repair makes repair process slow and only to increase social costs. This research will give residence suppliers and consumers a resonable way to solve repair process during tile obliged period of guarantee since moving into from a process which are design, planing, construction, and after management. Furthermore it will present each business and role to conclude defect repair easily, so I planed to promote maintenance after conclusion of defect repair.

  • PDF

A Study on the Improvement Plan through Analyzing the Perception of Expert Group about Landscape Construction Defects (조경공사 하자에 관한 전문가 집단간 인식분석을 통한 개선방안 연구)

  • Lee, Sang-Suk;Yu, Joo-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.104-113
    • /
    • 2012
  • This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.