• Title/Summary/Keyword: 하부기초 설계과정

Search Result 14, Processing Time 0.03 seconds

Design Methodology on Steel-type Breakwater II. Pile Design Procedure (철재형 이안제 설계기법 연구 II. 하부기초 설계 단계)

  • Kwon, Oh-Kyun;Oh, Se-Boong;Kweon, Hyuck-Min
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.3
    • /
    • pp.219-228
    • /
    • 2011
  • In this paper, the design procedure of substructure of the steel-type breakwater was described and the actual foundation design was performed for the test bed. The site investigation was executed at the Osan-port area, in Uljin, Gyeongbuk, where the steeltype detached breakwater is constructed. The foundation mainly depends on the lateral load and uplift force due to the wave force. Since the superstructure is stuck out about 9.0m from the ocean bed, the foundation must resist on the lateral force and bending moment. After considering various factors, the foundation type of this structure was determined by the steel pipe pile(${\varphi}711{\times}t12mm$). On the stability of pile foundation, the safety factors of the pile on the compressive, lateral and uplift forces were grater than the minimum factor of safety. The displacements of pile under the working load were evaluated as the values below the permissible ones. Based on the subgrade reaction method, we evaluated the relationship of subgrade reaction and displacement for the lateral and the vertical directions in the layers. The structural analyses along with the foundation were perfomed and the effect of pile foundations were compared quantitatively.

A Study on the Characteristics of Dynamic Behaviors for the Spatial Structures using Equivalent Lumped Mass Model (중간 면진층을 가지는 래티스 돔 구조물의 병렬 다질점계 등가모델을 이용한 동적 거동 특성에 관한 연구)

  • Han Sang-Eul;Lee Sang-Ju;Kim Min-Sik
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.19 no.2 s.72
    • /
    • pp.187-194
    • /
    • 2006
  • Generally, earthquake-resistant structural systems have to ensure the sufficient stiffness and ductility for stability In this paper, the spatial structures are applied an isolation system to boundary parts between roof systems and sub-structures. So, it is necessary to examine the characteristics of dynamic behaviors of spatial structures governed by higher modes rather than lower modes different from the cases of high-rise buildings. The objectives of this paper are to develop the equivalent lumped mass model to simplify an analytical processes and to investigate the dynamic behaviors of roof systems according to the mass and stiffness of sub-structures as a fundamental study of performance design for the spatial structures.

Analysis on the Seismic Load Reduction Effect of a Ground by Considering Pile Strength (말뚝 강성을 고려한 지반의 지진하중 저감 효과에 관한 해석 연구)

  • Kim, Sang-Yeon;Park, Jong-Bae;Park, Yong-Boo;Kim, Dong-Soo;Lee, Sei-Hyun
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.451-456
    • /
    • 2012
  • In this study, a numerical analysis to evaluate the reduction of seismic load due to pile group was performed and compared the peak ground acceleration(PGA) measured at free-field and foundation. The special attention was given to the amplification of seismic acceleration on the foundation due to the pile effects. The analysis considering pile effects was carried out for 4, 8 and 12 piles with same condition by PLAXIS 2D Dynamics. Based on the analysis results, it is found that the overall reduction in seismic load due to foundation and reduction rates are similar irrespective of pile numbers. This study gives a possibility for effective design of piled foundation by reducing seismic load about 20~25%.

Estimation of the Axial Stiffness of Reinforcing Piles in Vertical Extension Structures (수직증축 공동주택 하부 신설 보강말뚝의 축강성 산정)

  • Kim, Do-Hyun;Jeong, Sang-Seom;Cho, Hyun-Chul
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.12
    • /
    • pp.35-44
    • /
    • 2019
  • In this study, the axial stiffness of reinforcing piles (Kvr) for the vertical extension remodeling structures was estimated through 3D finite element analysis. In the computation of the minimum required axial stiffness of reinforcing piles, proposed maximum axial stiffness of old and deteriorated existing piles (Kve) based on theoretical and experimental approaches will be applied. Through this, the required increase rate of axial stiffness of reinforcing piles in order to support the increased structural loading was proposed for end-bearing and friction piles by different slenderness ratio (L/D). The numerical model was validated by comparing the computed results with actual field measurements. Based on the computed results, it was concluded that the end-bearing reinforcing pile needs 44% - 67% increase in axial stiffness to deal with the deterioration of existing piles and support the additional structural load due to vertical extension remodeling.

A study on platform-based preliminary design guidelines associated with the behaviour of piles to adjacent tunnelling (터널근접시공에 의한 말뚝의 거동을 고려한 플랫폼 기반의 예비 설계 가이드라인에 대한 연구)

  • Jeon, Young-Jin;Lee, Gyu-Seol;Lee, Jae-Cheol;Batbuyan, Chinzorig;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.129-151
    • /
    • 2022
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of piles when the adjacent tunnelling passes underneath grouped piles with a reinforced pile cap. In the current study, the numerical analysis studied the computed results regarding the ground reinforcement condition between the tunnel and pile foundation. In addition, several key issues, such as the pile settlements, the axial pile forces, the shear stresses and the relative displacements have been thoroughly analysed, and the IoT platform based preliminary design guidelines were also presented. The pile head settlements of the nearest pile from the tunnel without the ground reinforcement increased by about 70% compared to the farthest pile from the tunnel with the maximum level of reinforcement. The quality management factor data of the piles were provided as API (Application Programming Interface) of various forms by the collection and refinement. Hence it has been shown that it would be important to provide the appropriate API by defining the each of data flow process when the data were created. The behaviour of the grouped piles with the pile cap, depending on the amount of ground reinforcement, has been extensively analysed, and the IoT platform regarding the quality management of piles has been suggested.

The Implementation of Drilling Simulation for Offshore Rig Education (교육용 해양플랜트 Rig 굴착 시뮬레이션 구현)

  • Park, Ju-Yong;Jo, Hyo-Jae;Lee, Jee-Hoon;Lim, Young-Jin
    • Journal of the Korea Society for Simulation
    • /
    • v.20 no.2
    • /
    • pp.11-17
    • /
    • 2011
  • The purpose of this study is 3 dimensional modeling of lower part of drilling system in offshore rig and simulation of drilling process. Recently, shipbuilding companies have been focusing on offshore rigs due to their high added-value and the reduced demand of new shipbuilding. In most cases, however, the basic design, installation and management of offshore rig are carried out by foreign companies. Therefore, it is difficult to obtain the knowledge and information of drilling system. In this study drilling devices, BOP(Blowout Preventor) and cementing job and mud circulation related components are included as the main components of offshore rig. The structure and function of them were analyzed from a viewpoint of object-oriented technique. On the basis of this analysis they were modeled in the 3 dimensional structure with 3D software tool such as CATIA and 3DVIA Composer. The drilling process was simulated according to the scenario of drilling operation. This simulation system can be effectively used for an educational tool for students and engineers in ocean plant industries.

Analysis of traction and power requirement for forage harvester (조사료 수확기의 견인력 및 소요동력 분석)

  • Hong, Seongha;Kang, Daein;Cho, Yongjin;Lee, Kyouseung
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2017.04a
    • /
    • pp.80-80
    • /
    • 2017
  • 국내에서 대부분 생산되는 사료(사일리지) 수확 작업은 베일 생산 및 비닐 래핑 작업이 독립적으로 수행되고 있어서 비효율적이다. 본 연구에서 개발한 조사료 수확기는 수집, 롤링, 베일 네트 생성, 래핑, 래핑 종료 및 베일 방출작업을 통합적으로 수행하도록 설계-제작하였다. 통합형 다목적 조사료수확기의 설계는 3D 디자인 툴 (CATIA V5R18)을 이용하여 실시하였으며, 기구부 23 파트 어셈블리, 전기제어 어셈블리, 유압요소기술을 통합하여 통합시작기를 제작하였다. 기초 프레임, 오거장치파트, 픽업장치파트, 하부롤러파트, 상부롤러파트, 하부 프레임 및 주행부 파트, 래핑회전파트, 롤러부 구동 동력부, 유압파트, 전기제어파트, 드로우바파트, 체결 및 컨트롤러 파트 등 25개 파트로 구성되어 있다. 본 연구에서 개발한 시작기의 견인력 및 소요동력 분석은 선행 연구에서 사용한 Brixius (1987) 제안 모델을 체택하여 분석하였다. 이 Brixius 제안 모델은 견인력 예측에서 토양변수 및 토양강도 특성을 나타내는 원추지수 (Cone Index, CI)를 이용하여 트랙터의 견인력 예측에 사용하였다. 또한 트랙터-조사료수확기 시스템의 소요 견인력을 예측하는데 있어, 트랙터-조사료수확기 시스템이 운용되는 토양조건과 트랙터의 마력에 따른 소요 견인력 특성을 분석하기 위해 대표적으로 3수준의 토양조건 (CI: 356 kPa, 543 kPa, 1,429 kPa)을 적용하였으며, 베일의 개당 최대무게는 최고 수준인 옥수수 기준으로 800 kgf를 적용하였다. 본 연구에서 적용된 3수준의 CI 조건은 연구팀에서 선행연구과정 (토양특성에 따른 최적 경운작업 시스템 개발, 2006)에서 분석한 전국 10개 지역의 33개 지점의 경반층 CI지수의 측정범위인 1,050-3,170 kPa에 대해 견인력이 많이 소요되는 열악한 조건 수준을 적용하였다. 각 작업에 사용된 소요동력은 베일 작업시 (ASABE D497.7, 2011) 그리고 래핑작업시 (Zhortuylov et al., 2013)를 사용하였으며 두 소요마력을 트랙터-조사료 수확기 시스템의 필요 소요마력의 합계로 계산하였다. 트랙터-조사료수확기 시스템의 최소 소요 동력, 차축 소요 동력과 PTO 소요 동력을 Zoz and Grisso (2003)을 이용하여 계산하였다. 연구에서는 기본적으로 ASAE의 작업속도 및 작업효율을 적용하였는데, 적용된 조사료수확기의 현장 작업효율은 60-86%의 범위이고 일반적으로 70%를 적용하고 이때 작업속도는 2.5-8.0 km/h이며 전형적으로 5.0 km/h를 기준하고 있다. 자주식 (SP; sief-propelled machine) 조사료수확기의 경우 작업속도가 2.5-10.0 km/h의 범위에서 작업효율은 60-85% 범위이다. 적용되는 조사료 수확기의 작업효율인 60-85% 범위에서 일반적으로 적용되는 작업효율인 70%를 적용하면 트랙터의 소요동력은 95hp를 적정 작업환경으로 하였다.

  • PDF

Influences of Grouting Pressure of Microcement to Upper Structures (지반보강용 마이크로시멘트의 주입압이 상부구조물에 미치는 영향)

  • Hwang, Chul-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.70-77
    • /
    • 2010
  • Microcement grouting and micro pile are frequently used for ground modification during tunnel construction. The influence of grouting pressure of microcement grouting and micro pile to the existing bridge which is directly over the constructing tunnel is investigated. Three dimensional seepage flow-structure interactive analysis considering firm water pressure with full stages of construction including the construction of upper bridge, microcement grouting, micro pile and tunnel is performed. The settlement and tilting of the pier of existing bridge violate the design code and the reaction of the bridge are highly increased after grouting. The stress of tunnel bracings such as rockbolt and shotcrete also exceed the limit of the code. The pressure of microcement grouting is confined by bedrock and transmit to the surrounded soil and the upper bridge. Microcement grouting needs mid-high pressure to penetrate through weak fault plane and the pressure greatly influence the safety of the upper structure. It is important to decide and care the grouting pressure to improve weak fault plane directly under the existing structures and the pressure of microcement grouting should be considered in underground analysis.

Case study on Construction and Improvement of Rahmen Structures in Deep Soft Clay Deposit (대심도 연약지반에 설치된 라멘 구조물의 시공 및 보강사례)

  • Lee, Sa-Ik;Choi, Young-Chul;Yoo, Sang-Ho;Kim, Tae-Hyung;Kim, Sung-Ryul
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.1
    • /
    • pp.85-92
    • /
    • 2014
  • Structures that have constructed in soft clay might suffer from many issues related to consolidation settlement or lateral movement of soft-clay during long-term period. Therefore, it is important to establish proper design and construction processes related to site investigation, soil improvement, construction management, and so on. This case study focused on the construction of the rahmen structure supported by pile foundations. Especially, the structure in this case had been constructed without improving underlying soft clay and before constructing backfill embankment due to the limited construction time and the traffic connection of the old road crossing new highway. Therefore, in order to satisfy the structural stability, the construction processes and countermeasure methods were carefully planned based on the results of preliminary numerical analyses and monitoring of ground behaviors. Through the trial and error precess during the construction, the structures had been successfully constructed.

Seismic exploration for understanding the subsurface condition of the Ilwall-dong housing construction site in Pohang-city, Kyongbook (경북 포항시 일월동 택지개발지구의 지반상태 파악을 위한 탄성파탐사)

  • Seo, Man Cheol
    • Journal of the Korean Geophysical Society
    • /
    • v.2 no.1
    • /
    • pp.45-56
    • /
    • 1999
  • Seismic refracrion and reflection surveys were conducted along an E-W trending track of 482 m long in Ilwall-dong, Pohang. End-on spread was employed as source-receiver configuration with 2 m for both geophone interval and offset. Seismic data were acquired using 24 channels at every shot fired every 2 m along the track. Refraction data were interpreted using equations for multi-horizontal layers. Reflection data were processed in the sequence of trace edit, gain control, CMP sorting, NMO correction, mute, common offset gathering, and filtering to produce a single fold seismic section. There are two layers in shallow subsurface of the study area. Upper layer has the P-wave velocities ranging from 267 to 566 m/s and is interpreted as a layer of unconsolidated sediments. Lower layer has P-wave velocities of 1096-3108 m/s and is interpreted as weathered rock to hard rock. Most of the lower layer classified as soft rock. Upper layer has lateral variations in both P-wave velocity and thickness. The upper layer in the eastern part of the seismic line is 3-5 m thick and has P-wave velocity of 400 m/s in average. The upper layer in the western part is 8-10 m thick and has P-wave velocity of 340 m/s in average. The eastern part is interpreted as unconsolidated beach sand, while the western part is interpreted as infilled soil to develop a construction site. Three fault systems of high angle are imaged in seismic reflection section. It is interpreted that the area between these fault systems are relatively safe. Large buildings should be located in the safe ground condition of no fault and footings should be designed to be in the basement rock of 3-10 m deep below the surface.

  • PDF