• 제목/요약/키워드: 풍력발전시스템 시뮬레이터

검색결과 34건 처리시간 0.019초

풍력터빈시뮬레이터와 매트릭스 컨버터를 이용한 PMSG 풍력발전 시스템 모델 개발 (Development of PMSG wind power system model using wind turbine simulator and matrix converter)

  • 윤동진;한병문;리위룽;차한주
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2008년도 추계학술대회 논문집
    • /
    • pp.45-47
    • /
    • 2008
  • This paper describes development of PMSG wind power system model using wind turbine simulator and matrix converter. The wind turbine simulator, which consists of an induction motor with vector drive, calculates the output torque of a specific wind turbine using simulation software and sends the torque signal to the vector drive after scaling down the calculated value. The operational feasibility of interconnected PMSG system with matrix converter was verified by computer simulations with PSCAD/EMTDC software. The simulation results confirm that matrix converter can be effectively applied for the PMSG system.

  • PDF

풍속계와 Motor-Generator를 이용한 영구자석동기발전기 풍력발전시스템 하드웨어 시뮬레이터 개발 (Development of hardware simulator for PMSG wind power system composed of anemometer and motor-generator set)

  • 정종규;한병문
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2010년도 추계학술대회
    • /
    • pp.248-249
    • /
    • 2010
  • This paper describes development of hardware simulator for the PMSG(Permanent Magnet Synchronous Generator) wind power system, which was designed using real wind data. The simulator consists of a realistic wind turbine model using anemometer, vector drive, induction motor. The turbine simulator generates torque and speed signals for a specific wind turbine with respect to given wind speed. This torque and speed signals are scaled down to fit the input of 3kW PMSG. The PMSG-side converter operates to track the maximum power point and the grid-side inverter controls the active and reactive power supplied to the grid. The operational feasibility was first verified by computer simulations with PSCAD/EMTDC. The feasibility of real system implementation was confirmed through experimental works with a hardware set-up.

  • PDF

계통연계형 PMSG 풍력발전시스템의 LVRT 동작 분석을 위한 하드웨어 시뮬레이터 (Hardware Simulator for LVRT Operation Analysis of Grid-Tied PMSG Wind Power System)

  • 이재욱;김재혁;최영도;한병문;윤영두
    • 전기학회논문지
    • /
    • 제63권9호
    • /
    • pp.1219-1226
    • /
    • 2014
  • This paper introduces a hardware simulator for the LVRT operation analysis of the grid-tied PMSG wind power system with a power dissipation circuit. The power dissipation circuit, which is composed of chopper and resistor, suppresses the sudden increase of DC-link voltage in the back-to-back converter of the grid-tied PMSG wind power system. The LVRT operation was first analyzed using computer simulations with PSCAD/EMTDC. A wind power simulator including the power dissipation circuit and the fault simulator composed of variac and IGBT were built to analyze the LVRT operation. Various experiments were conducted to verify the effectiveness of the power dissipation circuit for the LVRT operation. The developed hardware simulator can be extensively utilized for the analysis of various LVRT operations of the grid-tied wind power system.

IEC 61850 프로토콜의 배전자동화시스템에 사용을 위한 배전시뮬레이터 개발과 시뮬레이션 결과에 관한 연구 (A study on the development of distribution simulator and simulation results for use in distribution automation system of IEC 61850 protocol)

  • 김재동;오재곤
    • 한국정보전자통신기술학회논문지
    • /
    • 제15권2호
    • /
    • pp.95-102
    • /
    • 2022
  • 신재생에너지 확대를 위한 배전자동화시스템의 안정성 평가를 위한 연구이다. 정부는 재생에너지 3020 이행계획 정책을 통해 2030년까지 신재생에너지를 확대하여 국민의 삶의 질을 높이는 참여형 에너지 체계로 전환할 계획이다. 정부는 2030년까지 재생에너지 발전량 비중을 국내 보급 에너지의 20%로 목표 설정하였다. 신규 설비용량의 95% 이상을 태양광 풍력 등 청정에너지로 설립할 계획이다. 재생에너지 보급 확대로 에너지 신사업과 분산전원 산업이 육성되어 과거의 대규모 전원 개발이 아닌 근거리, 저압, 소규모 발전이 급속히 확대되었다. 이런 수요로 인해 배전 설비 운영의 중요성이 대두 되었고 배전자동화시스템이 필요성 증대되고 있다. 본 논문에서는 배전자동화시스템의 성능 및 기능 평가를 위한 배전시뮬레이터 개발에 대해 다루었고 이와 배전자동화시스템과의 연동시험 결과를 제시한다. 배전계통에 진보된 시스템을 도입하기 위해서는 송변전시스템의 장점을 취해야 한다. 배전시스템에서 DNP3.0프로토콜을 사용하고 송배전시스템에서 IEC61850 프로토콜을 사용한다. 이 두 프로토콜을 배전자동화시스템에서 혼용하여 사용시 제어, 모니터링 등의 운영에 대한 기능과 성능을 충족한다는 결론을 보였다.