The Rationalization through Comparative Analysis of Price Fluctuation Adjustment Method (물가변동 조정방법의 비교분석을 통한 합리화 방안)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.67-76
    • /
    • 2012
  • There are index adjustment method and item adjustment method in estimation methods for price fluctuation rate of public constructions. A relevant regulation has put item adjustment method as a principle, but in most construction, contract sum adjustment has been made by index adjustment method. Hence, this study, by figuring out width and causes of the gap between index adjustment method and item adjustment method through direct comparative analysis, solved inequality caused by difference between them and suggested a rational way against irrationality of each method. For building operations of public housing construction, a detailed fluctuation rate by index adjustment method and item adjustment method of construction cost elements of the same construction, that is, direct material cost, direct labor cost and historical construction cost was estimated to analyze difference between two adjustments and establish its cause. Across the analysis, it was found that fluctuation rate by item adjustment method was estimated lower than that by index adjustment method and difference between methods for estimating fluctuation rate of quotation unit price and application of index unrelated to construction type and construction nature are main causes of the difference. This study has a significance in that, for smooth contract sum adjustment between contracting parties, it practically proved the real difference between adjustment methods by conducting comparative analysis of the difference in direct correspondence way.

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

An Improvement Plan of Contract Price Adjustment through the Problem Analysis of the Current Price Escalation Regulation in Construction Projects (현행 건설공사 물가변동 제도의 문제점 분석을 통한 계약금액조정 개선방안)

  • Park, Yang-Ho;Kown, Beom-Jun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.435-439
    • /
    • 2006
  • The purposes of study is to propose a new method contract price adjustment in construction projects. The research method of this study includes a case analysis and questionnaire survey. The results of this study are as follows: 1) For improvement method of contract amount adjustment, enactment for legislation pertaining to computation methods such as military's organization through total unit cost, and price flexibility computation at the point of design modification were presented. 2) Arithmetic formulas for cases in which volume is deleted or modified below the price flexibility exemption amount or in which there is no change to quantity, at the occurrence of design modification resulting from price flexibility, were proposed.

  • PDF

Method Development for the Sample Preparation and Quantitative Analysis of Synthetic Colors in Foods (식품 중 식용타르색소의 시료별 전처리방법 확립 및 함량 분석)

  • Park, Sung-Kwan;Lee, Tal-Su;Park, Seung-Kook
    • Korean Journal of Food Science and Technology
    • /
    • v.36 no.6
    • /
    • pp.893-899
    • /
    • 2004
  • Method for sample preparation and quantitative analysis of 19 permitted and non-permitted synthetic colors in foods was developed based on reversed-phase ion-pairing high performance liquid chromatography. For color extraction of samples, deionized water was added, and pH was appropriately adjusted with 1% ammonia water. Any undissolved matters were extracted with 50% ethanol or 70% methanol. Lipid in snacks was first removed using n-hexane with centrifugation, water was added to extract colors, followed by clean-up and concentration using Sep-Pak $C_{18}$ cartridge. Recovery efficiencies at known concentrations of 19 standard food colors spiked into foods were in 90.3-97.9% range far soft drink, 79.2-101.9% for candy, 84.1-103.4% for jelly, 86.4-100.8% for chewing gum, 83.5-103.4% for ice cream, and 78.5-95.6% for snack.

An Empirical Study on the Economical Competition Factors of Internet Retailers (인터넷 소매상의 경제적 경쟁요인에 관한 실증연구)

  • 이수정;남순해;고석하
    • Proceedings of the Korea Society of Information Technology Applications Conference
    • /
    • 2002.11a
    • /
    • pp.3-13
    • /
    • 2002
  • 고석하 등(2002)은 인터넷 소매상이 상품 품목의 명목 가격과 배송료를 이용해서 고객의 일회 총 구매 비용을 조절한다는 것을 밝혔다. 고석하 등(2002)은 같은 내용의 상품 조합을 인터넷 시장에서 구매하기 위한 비용과 전통 시장에서 구매하기 위한 비용을 비교하였다. 분석 결과, 그 교호작용과 함께, 상품 종류와 일회 구매액/가격의 크기의 두 요소가 인터넷 시장의 전통 시장에 대한 총 구매비용 할인율의 변동의 약 60%내지 80%를 설명할 수 있다는 것을 보여주었다. 한편, 구매액/가격은 인터넷 시장에서의 해당 산포도(전통 시장의 그것에 대비한)에는 거의 영향을 미31지 못하며, 상품의 종류도 산포도에는 할인율에서와 같이 큰 영향을 미치지 않았다. 인터넷 시장의 가격이나 구매비용 산포도는 상품 특성이나 구매액 크기 이외의 다른 요인에 의해서 주로 영향을 받는 것으로 나타났다. 따라서, 본 논문에서는 가격 요인 이외의 경제적 경쟁요인에 관한 실증연구로서, 2002년 6월 17일부터 20일까지, 소프트웨어, PC와 주변기기, 휴대폰, 가전제품, CD, 화장품, 그리고 책의 7가지 산업 전문 쇼핑몰과 종합 쇼핑몰을 대상으로, 인터넷 시장에서 수행되고 있는 경제적인 비가격 경쟁요인에 관한 실증 조사를 실시하였다. 조사 결과, 인터넷 시장에서 수행되고 있는 경제적인 비가격 경쟁요인은 매우 다양하며, 상품별로도 다른 특성을 보이고 있는 것으로 밝혀졌다. 인터넷 소매상의 경제적인 비가격 경쟁요인은 크게 배송료 면제와 배송료 외 인센티브 제도로 구분된다. 본 논문에서는 경제적인 비가격 경쟁요인의 모든 경우의 수를 고려할 수 있도록, 코드표를 작성하여 정리하고 분석하였다.기호로 인식하였다. 실험결과, 표준패턴을 음표와 비음표의 두개의 그룹으로 나누어 인식함으로써 DP 매칭의 처리 속도를 개선시켰고, 국소적인 변형이 있는 패턴과 특징의 수가 다른 패턴의 경우에도 좋은 인식률을 얻었다.리되고 이원화된 코드체계와 데이터 형태의 이질화를 통일하는 방법으로 데이터웨어하우스 시스템을 제시하였다. 결국 병원에서 데이터웨어하우스 시스템의 구축은 임상, 연구, 교육의 유기적 순환관계를 정립하여 지식의 순환적 고리인 수집, 공유, 확산, 재창출을 지속적 유지할 수 있는 인프라를 구축해 준다. 반면 상이한 정보들간의 충돌과 이에 따른 해석의 오류로 잘못된 의사결정을 위한 정보를 제공할 수 있고 기초정보의 접근 및 추출의 유용성에 의해서 정보유출에 대한 문제가 한계점으로 나타났다.로세스 개선을 위해서 무엇을 정말로 필요로 하는지를 밝힘으로써, 한국 소프트웨어 산업의 현실적인 특수성을 고려한 소프트웨어 프로세스 평가와 개선 모델의 개발을 위한 기초적인 자료를 제공할 것으로 예상된다. 또한, 본 연구 결과는, 우리나라 소프트웨어 조직들이 실제로 무엇을 필요로 하는지를 밝힘으로써, 우리나라의 소프트웨어 산업을 육성하기 위한 실효성 있는 정책 입안을 위한 기초 자료를 제공할 것으로 예상된다.를 검증하려고 한다. 협력체계 확립, ${\circled}3$ 전문인력 확보 및 인력구성 조정, 그리고 ${\circled}4$ 방문보건사업의 강화 등이다., 대사(代謝)와 관계(關係)있음을 시사(示唆)해 주고 있다.ble nutrient (TDN) was highest in booting stage (59.7%); however no sig

  • PDF