• Title/Summary/Keyword: 포장 균열 깊이

Search Result 14, Processing Time 0.018 seconds

Analysis of the Effect of Pavement Crack Depth of the Cavity Management Grade (포장 균열 깊이가 공동 관리 등급에 미치는 영향 분석)

  • Park, Jeong Jun
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.449-457
    • /
    • 2020
  • Purpose: The Seoul Metropolitan Government classifies the cavity risks into emergency, priority, general, and observation grades in consideration of the cavity size, asphalt pavement thickness, and pavement depth based on the cavity management grade criteria of Seoul. In this study, the depth of cracking was measured at 17 cracks identified by checking the pavement condition of the cavity at 265 cavities found in the 2019 cavity investigation service. Method: In the first phase, crack width and depth were measured using a vernier caliper, taper gauge, and depth gauge to check the cracks of the identified cavities. In the second phase, the location of the largest crack in the upper road surface was confirmed, and A.C. was drilled to further measure the crack depth. Results: As a result, the cavity management level was raised in nine of the 17 test cavity identified. Therefore, in case of emergency and priority recovery, the grade should be adjusted according to the depth of pavement crack and the thickness of residual A.C. pavement. Conclusion: In the case of cracks in the upper part of the cavity, the crack progression must be determined through the perforation and the remaining asphalt concrete thickness must be determined to determine the cavity grade.

Estimation for optimum crush depth to prevent reflection crack for Rubblized-PCC in PCC pavements (노후콘크리트포장 원위치 파쇄기층(Rubblized-PCC)의 반사균열 억제를 위한 적정 파쇄 깊이 산정)

  • Lee, Seung-Woo;Chon, Sang-Min
    • International Journal of Highway Engineering
    • /
    • v.6 no.4 s.22
    • /
    • pp.101-108
    • /
    • 2004
  • Asphalt overlay method is a general method to extend the of life old concrete pavements. However, reflection cracks are the typical problem of the AC overlay on distressed concrete pavement. Joint sealing, stress absorbtion layer have been used to prevent reflection cracks however partial success of to delay the timing of reflection cracking was recognized. Reflection crack problem can be eliminated by using rubblization method, which crush concrete pavement slab into piece of aggregate size that can be used base material. Previous research on rubblization method indicated that the size of rubblized PCC ranged 40-70mm at upper layer, and more than 100mm at lower layer. In this study, the adequate depth of rubblized PCC that ran prevent reflection cracking of AC overlay is estimated base on the simulation test of reflection cracking with 0, 10, 20cm rubblized PCC base.

  • PDF

Numerical Analysis of Crack Occurrence and Propagation in Continuously Reinforced Concrete Pavements under Environmental Loading (환경하중에 의한 연속철근콘크리트포장의 균열발생 및 진전 특성 분석)

  • Kim, Seong-Min
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.39-49
    • /
    • 2007
  • The objective of this study was to investigate features of transverse crack occurrence and propagation in continuously reinforced concrete pavement(CRCP) when subjected to environmental loading. The finite element model of CRCP was developed and the element removal method was implemented to predict the crack propagation process. To investigate the effect of the type of environmental loading on the CRCP behavior and cracking aspects, the following three different cases were considered: (1) the temperature gradient between top and bottom of the slab does not vary and the constant temperature drop throughout the depth occurs; (2) the temperature at the slab bottom does not vary and the temperature gradient increases; and (3) the temperature between the mid-depth and the bottom of the slab is the same and does not vary and the temperature at the top decreases. The analysis results showed that the crack occurrence and propagation through the depth of the slab in CRCP were significantly affected by the type of environmental loading. The changes in stress distribution and displacements during the crack occurrence and propagation process could also be investigated.

  • PDF

Horizontal Cracks in Continuously Reinforced Concrete Pavement Structures (연속철근콘크리트 도로포장 구조물의 내부 수평균열)

  • Kim, Seong-Min;Cho, Byoung-Hooi;Kwon, Soon-Min
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.3 s.93
    • /
    • pp.425-429
    • /
    • 2006
  • Horizontal cracks at the mid-depth of concrete slabs were observed at a section of the continuously reinforced concrete pavement(CRCP) structures on the Korea Highway Corporation's Test Road. To investigate the existence and the extent of horizontal cracks in the concrete slab, a number of cores were taken from the section of CRCP. To identify the causes of horizontal cracks, numerical analyses were conducted. Several variables relative to design, material, and environment were considered in the studies to evaluate possible causes of horizontal cracking. A numerical model of CRCP was developed using the finite element discretization, and the shear and normal tensile stress distributions in CRCP were investigated with the model. Numerical analysis results show that the maximum shear and normal tensile stresses develop near the depth of steel bars at transverse cracks. If those maximum stresses reach the strength of concrete, horizontal cracks occur. The maximum stresses become higher as the environmental loads, coefficient of thermal expansion of concrete, and elastic modulus of concrete increase.

Rubblization of Thick Concrete Pavement (두꺼운 콘크리트포장의 원위치파쇄 기층화공법)

  • Lee Seung-Woo;Han Seung-Hwan;Ko Suck-Bum;Kim Ji-Won
    • International Journal of Highway Engineering
    • /
    • v.8 no.3 s.29
    • /
    • pp.105-114
    • /
    • 2006
  • A popular alternative to extend the life of aged pavement is asphalt overlay. However, it has a very serious and inherent shortcoming in deterring a reflection crack. Although joint-rehabilitation and stress-relief techniques have been applied to deter such reflection cracks in aged pavement, the techniques had a limited success only in slowing down the progress of a reflection crack. Rubblization technique rubblizes the concrete pavement slab in situ and uses the rubblized slab as the base material. Then, pavement overlay is applied to finish off the rehabilitation of aged pavement. This rubblization technique has the advantage of solving the problem of reflection cracking completely. When rubblization technique is applied, the upper layer of aged concrete pavement is rubblized between 40mm-70mm in depth. However, the lower layer is typically rubblized more than 100mm in depth. Nevertheless, it is difficult to turn the entire concrete pavement of more than 30cm in depth into rubblized aggregate of appropriate size. Thus, a simulation experiment was carried out to find the appropriate rubblized depth, which avoids the reflection cracking and still maintains the function of subbase, by varying the depth of rubblized depth in loom increments of 0cm, 10cm, and 20cm. The result indicated the optimum rubblized depth was 10cm (Lee, 2006). Additionally, a small rubblizinge equipment was developed in order to derive the rubblization technique appropriate for thick concrete pavement. This equipment was tested out on an experimental pavement, which was constructed with the same standard and specification for the road in actual use, by varying its rubblizing head shape and energy as well as the effective area of rubblization. This experiment led to a prototype equipment for rubblization of thick concrete pavement. The prototype was put into use on a highway, undergoing a test construction and monitoring afterwards. This entire process was necessary for the validation of the proposed rubblization technique.

  • PDF

Numerical Analysis off-Shape Cracking in Jointed Concrete Pavements (줄눈콘크리트 포장의 T형 균열 발생 원인 수치 해석)

  • Yun, Dong-Ju;Seo, Young-Guk;Kim, Seong-Min
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.141-149
    • /
    • 2009
  • This study was conducted to investigate the causes that induce the T-shape cracks at the joints in the jointed concrete pavements(JCPs). The finite element models of JCP including dowel bars were developed and the stress distribution in the slab was investigated under environmental loads. To investigate the effect of dowel bars on the transverse stresses at the joints that induce the T-shape cracks, the slab curling behavior was analyzed with and without dowel bars. In addition, the stress concentration was investigated when the dowel bar was not installed at the mid-depth of the slab. The results of this study showed that the transverse stresses were not affected by the dowel bars if the dowel bars were installed at the mid-depth of the slab. However, if the dowel bars were not installed at the mid-depth, the transverse stresses were concentrated at the dowel bar locations when the slab curled. The stress concentration was dependent on the contact characteristics between the dowel bar and concrete, and was significantly large when the dowel bar not installed at the mid-depth was located far from the edge of the slab. Therefore, to mitigate T-shape cracking in JCP, dowel bars should be very carefully installed and leveled at the proper locations.

  • PDF

Joint Behavior of Concrete Pavements Using Joint Crack Inducer (줄눈균열 유도장치를 사용한 콘크리트 포장의 줄눈거동)

  • Park, Moon Gil;Choi, Ki Hyo;Nam, Young Kug;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.57-65
    • /
    • 2008
  • Joint of concrete pavement contributes to improvement of pavement performance by preventing occurrence of random cracking due to drying shrinkage and temperature changes of concrete slabs at early age. However, saw-cutting operations performed prior to sufficient concrete hardening develop micro-cracking of the concrete near the joints, which may develop to long-term distresses due to repetitious traffic and environmental loadings. To reduce the distresses, the joint crack inducers with heights of 100 mm, 150 mm, and 220 mm and the joint cracking slots with various depth were installed at a test section to investigate occurrence of the joint cracks and their behaviors over 5 months. As the results, higher efficiency of the crack inducing and larger behavior of the joint cracks were observed for the taller joint crack inducer. Higher efficiency of the crack inducing and improvement of the joint performance are warranted by additional investigation and reformation of the joint crack inducer.

Research on Practical Rubblization in PCC Pavements Equipment Development and Test Construction (원위치파쇄기층화 공법의 실용화를 위한 장비개발 및 시험시공)

  • Lee, Seung Woo;Han, Seung Hwan;Ko, Suck Bum;Kim, Ji Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.81-87
    • /
    • 2006
  • The rubblization technique is breaking the aged concrete pavement slab into rubblized concrete aggregate, and use it as an base material at its original position, then builds overlay above the rubblized base. This method has been successively used in USA due to the advantage of good constructibility, cost-effectiveness as well as the capability of preventing of reflection cracks. However, constructibility and economic performance of rubblization on typical Korean concrete pavements needed to be investigate since to typical Korean concrete pavements have thick slab, as well include lean concrete subbase course. Multi-head type breaker suitable for Korean condition was designed and developed. This multi-head type breaker was designed to rubblize old concrete to the suggested optimum rubblized-depth and rubblized-concrete-aggregate size to prevent reflection crack and maintain high bearing capacity. This machine was used for the test of rubblization of old concrete pavement on a non-use old concrete and a in-serviced road. In these two tests, engineering properties of rubblized base and constructability and cost were investigated. In both tests, the old concrete rubblized to targeted size and depth, and high-level bearing capacity was achieved. Also, superior constructability and lower cost compared with traditional reconstruction was examined.

A Study on the Resistance Against Environmental Loading of the Fine-Size Exposed Aggregate Portland Cement Concrete Pavements (소입경 골재노출콘크리트포장의 환경하중 저항성에 대한 연구)

  • Chon, Beom-Jun;Lee, Seung-Woo;Chae, Sung-Wook;Bae, Jae-Min
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.99-109
    • /
    • 2009
  • Fine-size exposed aggregate portland cement concrete pavements (FEACP) have surface texture of exposed aggregate by removing upper 2$\sim$3mm mortar of surface of which curing is delayed by using delay-setting agent. FEACPs have advantages of maintaining low-noise and adequate skid-resistance level during the performance period than general portland cement concrete pavements. It is necessary to ensure the durability environmental loading to prevent unexpected distress during the service life of FEACP. In the process of curing, volume change accompanied change in by moisture and temperature could be an important cause of crack in concrete to construct for successful FEACP, The use of chloride containing deicer may accelerate defects of concrete pavement, such as crack and scaling. This study aim to evaluate environmental loading resistance of FEACP, based on the estimation of shrinkage-crack-control-capability by moisture evaporation and scaling by deicer in freeze-thaw reaction.

  • PDF

A Study on Improvement of Field Implementation of Asphalt Surface Reinforcement Method (아스팔트 표면 강화공법의 현장 적용성 개선 방안 연구)

  • Jo, Shin Haeng;Kim, Kyungnam;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.389-395
    • /
    • 2017
  • A study was carried out to improve the field implementation of asphalt surface reinforcement method which is a preventive maintenance. Mean Texture Depth (MTD) was measured to quantify the surface condition and used to determine the optimum application rate. Determining the application rate using MTD can reduce the material loss from 30% to 15%. In order to reduce the curing time to 30 minutes, the heat capacity of $317kcal/m^2$ is required. Therefore, the design capacity of the heating curing device requires more than 380,000 kcal/hr. The asphalt surface reinforcement method is preferably applied at a time when slight cracking occurs before the permanent deformation becomes serious. Through the analysis of the pavement survey data, it was decided to apply the surface reinforcement method at the crack rate of 3~4%. Heating the surface reinforcement agent to $50^{\circ}C$ improves workability and ensures sufficient penetration depth even at a crack width of 1 mm. The results will be utilized as basic data for the development of automated construction equipment for efficiency improvement.