Stormwater pipe systems are most commonly used to discharge rainwater from the urban catchment covered by the impervious area. To design stormwater pipe and rainwater pumping station, frequency analysis is implemented using historical rainfall and the design rainfall is timely distributed using theoretical shape such as Huff distribution. This method cannot consider the rainfall intensity variation caused by climate change which is type of uncertainty. Therefore, in this study, runoff from Gasan1 stormwater pumping stations catchment is calculated using design rainfall distributed by the 2nd quartile distribution method and the historical rainfall events. From the analysis, the nodal flooding in the urban catchment is likely caused by the high peak rainfall event rather than the large amount of rainfall. The linear regression analysis is implemented. As a result, when several storms have the same amount of rainfall, the nodal flooding in the stormwater pipe systems could be caused by the high peak of storm events. Since as the storm duration become short, the peak rainfall become high, the nodal flooding likely become severe with the short storm duration. The uncertainty in the peak data of design rainfall is analyzed and this uncertainty has to be consider in the stormwater pipe design process.
There are many limitations in dealing with rapidly changing traffic demand in urban cities. Thus recently, traffic operation and management skills are more emphasized rather than the expansion of traffic facilities. In particular, in the interrupted flow formed by signalized intersections, it is quite important to give optimal signal timing to each intersection with consideration of progression. However, as fixed signal times per direction can affect passing capacity in signalized intersections, the present four-signal phase including a left-turn signal has many limitations, including reduction of directional road capacity when traffic demand is increases dramatically during peak hours. Because of this problem, lots of studies about internal metering techniques for oversaturated signal control skills have progressed but these techniques are not used widely due to the absence of detectors for queue sensing in real-time signal control systems. In this research, a new methodology called the "restrictive left-turn signal control", which is already used at the intersection above Samsung subway station, is suggested in order to reduce control delay of urban arterial roads. The restrictive left-turn signal control allows a driver to make a U-turn and then a right turn instead of turning left in that intersection. With this change, the restrictive left-turn signal control can contribute to increased intersection capacity by reducing the number of signal phases and maximizing the through phase time. However, road structure and traffic conditions at the target intersections should be considered before the adoption of the proposed signal control.
Because of short length between interchanges, traffic congestion has been caused by a lot of short trip traffic in the urban section of interregional expressway. Also, in case of expressway with Bus Only Lane, bus causes dangerous situation by conflicting between vehicles and buses in order to access from Bus Only Lane to IC. Therefore, this study aims to propose Express Lane applied by Bus Only Lane as a new lane operation in order to efficiently operate and to analyze the effectiveness on constructing Express Lane to the Pangyo-Hannam section in Gyeongbu Expressway. The study analyzes effectiveness by scenario using the micro traffic simulation tool, VISSIM 5.4. For this, the indicators which evaluate construction effect of Express Lane, are used by average delay time, average speed and total travel time. The results of the study showed the best effectiveness when Express Lane installed one, and it represented an ideal traffic condition when long distance trip traffic of the whole traffic is 25% in the study section. Therefore, the construction of Express Lane using Bus Only Lane achieves positive effectiveness on safety and expense aspect as well as uncongested flow.
Dong Gue Choe;Jong Duk Park;Dong Jin Kim;Seon Woong Ryu;Soo Jin Lee
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.371-371
/
2023
담양 및 화순 홍수조절지는 홍수 시 본류에 계획방류량만 흘러가도록 제수문을 운영하고, 계획방류량을 초과하는 홍수량은 하도 및 조절지 내에 저류하여 홍수를 지체시킨 후 저류된 홍수량은 첨두홍수가 지나간 이후 방류하는 방법으로 영산강 유역의 홍수를 방어하기 위해 '12년 건설되었다. 그러나 홍수조절지는 200년 빈도의 홍수량을 저감 시키도록 설계됨에 따라 준공 이후 10년간 '20년 8월 홍수 등 3회만 홍수방어용으로 활용되었다. 영산강은 오염부하량 대비 유출량 부족 등으로 수질관리에 취약하고 하천유지용수를 공급하는 다목적댐이 없는 등 수자원 확보가 어려우므로, 비홍수기 홍수조절지에 환경대응용수를 담수 및 방류하여 영산강의 유량확보 및 수질개선 등 활용 다변화 방안을 모색하고자 한다. 이와 관련하여 '16년 및 '19년에 시범담수를 실시하였으나, 담수 수질 관리의 어려움, 방류 전후 강우 등 제한적 여건으로 인해 하류 유량증가 및 수질 개선 효과의 확인은 어려웠으며, 제방 물비침 등을 발견하여 시설 안정성 확보가 필요한 것으로 확인되었다. '21년 안정성 확보를 위한 보강 그라우팅을 시행했으며, '19년부터 '21년 2월까지 「홍수조절지를 활용한 영산강 수질개선 방안」연구용역을 실시하여, 비홍수기 활용방안을 수립하였다. '21년 4/4분기 댐과 보 등의 연계운영협의회에 '시범담수 계획' 안건 상정 및 의결을 거쳤고, '22년 3월 25~26일까지 담양 74mm, 화순 61mm 비가 내려 담양 63만m3, 화순 151만m3를 담수하고 18~19일간 저류 후 담양은 평균 3.0m3/초로 25시간 동안, 화순은 평균 5.0m3/초로 32시간 동안 하류로 방류하였다. 방류 후 담양·화순 모두 가까운 하류 수위국 수위 상승을 확인했으며, 화순의 경우 하류 수질에 일부 영향이 있음을 확인하였다. 다만, 초기유출수 배제 등을 고려하지 않아 담수의 수질이 본류보다 좋지 않았으며, 이에 따라 수질 영향의 인과관계 확인이 어려웠다. 기존 연구용역에서 제시한 비홍수기 활용방안의 검증·보완을 위한 연구용역이 '22.5월부터 '23.12월까지 진행될 예정이며, 초기유출수 배제를 위한 조건 재수립, 수질 모니터링지점 확대 등 보완된 '시범담수 계획'을 '23.3월 댐과 보 등의 연계운영협의회에 보고하였다. 연말까지 연구용역과 연계한 시범담수·방류 시행 및 모니터링·효과분석을 통해 비홍수기 홍수조절지 최적운영방안을 마련할 계획이다.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.17
no.6
/
pp.133-143
/
2018
Roundabouts are generally installed at which traffic and pedestrian volume is relatively small intersections, and hence traffic can flow one direction around a circular island without traffic lights. A number of researches for roundabout signal metering have been processing ways to deal with operation efficiency drops in conditions of unusual traffic and pedestrian volume increases. However, there is still a shortcoming exists in previous operation algorithm does not consider the hidden vehicles between yield lines and detectors and queueing vehicles in circular lanes. These queueing vehicles between them can be cleared by introducing the queue clearance time. The purpose of this research is developing a real time signal metering operation algorithm by considering the vehicle queue clearance time. The results of varying queue clearance time application show that there is a substantial average vehicle delay reduction in VISSIM Com-Interface simulation. When the total number of entering vehicle is 3,200~4,800 vehicle/hour with varying queue clearance time application 21~50 seconds gives average delay reduction per vehicle by 16.1~71.7%.
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.6D
/
pp.623-636
/
2012
Roundabout is an intersection that allows vehicles to pass through the intersection by circulating the circular traffic island at the center of the intersection. In this study, a comparative analysis was conducted on roundabout at five locations in order to deduce the operational result and financial effect of roundabout and signal intersection. As for the operational result, it was found that roundabout showed improvement effect in the average delay per vehicle compared to that of signal intersection by minimum of 65.6% and maximum of 91.77%. it was found that roundabout showed financial cost-saving effect in the traffic congestion cost compared to that of signal operation by minimum of 58.59% and maximum of 81.69% per year. It can be known from these analysis results that roundabout has significant operational effects under certain amount of traffic volume by allowing vehicles to pass through the intersection in a continuous way without much waiting time and stoppage from signal control.
Kim, Kyung-Whan;Ha, Man-Bok;Jeon, Yeon-Hoo;Lee, Ik-Su
International Journal of Highway Engineering
/
v.9
no.1
s.31
/
pp.17-27
/
2007
Since early 1990s, several developed countries have applied the Electronic Toll Collection System (ETCS) to toll roads in order to solve traffic congestion and delay problems at toll plazas. For the successful operation of the ETCS, it is important to correctly forecast the ETCS using rate. In this study, it was conceived to develop a sophisticated demand forecasting model of the ETCS for toll roads in Changwon City The Binary Logit and neural network models were tested for the model considering 11 explaining variables. The best results in prediction accuracy and goodness-of-fit were obtained on the neural network model. However, because of the difficulty in predicting the 11 variables and its fitness in wide range, the Binary Logit model which considers three policy variables only is recommended as the model to forecast the ETCS using rate.
Proceedings of the Materials Research Society of Korea Conference
/
2003.03a
/
pp.200-200
/
2003
고체산화물 연료전지(SOFC)에서 사용되는 연결재의 주 기능은 각 단위 셀의 연료극과 다음 셀의 공기극을 전기적으로 연결하여, 공기와 사용연료의 분리역할을 하기 위하여 사용된다. SOFC용 연결재는 다른 구성요소 소재보다, 높은 전자 전도성, 낮은 이온전도성, 우수한 기계 적강도가 요구되며, SOFC는 고온에서 작동되기 때문에, 상온에서 작동온도까지 다른 요소 소재들과 유사한 열팽창계수와 물리, 화학적으로 안정성이 요구된다. 현재 연결재 제조기술은 EVD, CVD, plasma spraying, tape casting 등 다양하게 연구되고 있으며, 본 연구는 세라믹 연결재 증착방법 중 저렴한 비용으로 대량 생산이 용이한 습식법(dip coaling)을 적용하여, 연료극 지지체식 flat-tube형 고체산화물 연료전지의 지지체를 위해 세라믹 연결재를 제조하고, 그 특성을 연구하였다. 세라믹 연결재로써 선정한 합성조성은 LaCr $O_3$에 Ca이 치환 고용된 L $a_{0.6}$C $a_{0.41}$Cr $O_3$으로 pechini법으로 합성하였다. 합성된 조성은 100$0^{\circ}C$에서 5시간 하소후 가속 Ball Milling하여 0.5$\mu\textrm{m}$의 평균입자크기를 얻을 수 있었다. XRD 상분석결과 perovskite상 (L $a_{1-x}$ Ca/x/Cr $O_3$)과 CaCr $O_4$를 얻을 수 있었다. slurry를 제조하여 막의 밀착성을 증진시키기 위해 sand blasting시킨 flat tube지지체에 진공펌프를 이용하여 소재내부와 외부의 압력차로 dip coating한 후, 140$0^{\circ}C$로 소결 하였다. coating 결과 박리현상은 없었으나, 표면과 단면의 SEM분석결과 다소 porous한 박막층이 형성되었으며, Ca이온이 지지체로 permeation되는 현상이 발생하였다. 이와 같은 결과로부터 보다 치밀한 박막생성을 위해, slurry 제조조건을 변화시켰으며, Ca이온의 migration을 막기 위해 barrier layer를 이용하였다 완전 소결된 지지체는 가스투과도와 전기전도도측정을 통하여 특성을 평가하였다.였다.다.
Journal of the korean academy of Pediatric Dentistry
/
v.28
no.1
/
pp.87-94
/
2001
A survey was undertaken among a group of dentists working at private dental clinics to investigate the state of dental care and the level of education and training in the dental care to people with handicaps. Forty four percents of dental clinics take care of one more patients per month. The types of handicaps were physical, mental, sensory handicap and autism. The common problems are difficulty in communication and delay of treatment. Forty nine percents of dentists got education and nineteen percents had clinical experience for dental care of handicapped patients. Most of dentists felt necessity of training program and establishment of specialized dental hospital supported by government for the handicapped. This study indicated the necessity of undergraduate and postgraduate education and clinical training for dental care of handicapped patients.
Although it is expected to provide fundamental data for advanced VTS system by analyzing traffic accidents in VTS area, there is no quantitative analysis to find it.. In this research, it is examined and analyzed marine casualties records(1999-2004), data of Port-MIS and data of each VTS center. The results of this research are as below. 1) It is necessary to reduce traffic accident and to improve VTS operating system. 2) It is discovered for statistical discrepancy between vessels controlled by VTS and vessels not controlled by VTS in accident cause, visibility, perception distance and cause of late perception in collision accidents 3) It is necessary for VTS assistance to be positive and to made in ample time consecutively. 4) As the result of traffic accident prediction model, it is necessary to develop a system improving VTS operators' ability to identify dangerous ships.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.