• 제목/요약/키워드: 편익산정

Search Result 238, Processing Time 0.028 seconds

Estimation of Benefits by Implementing Motor Vehicle Recall System (자동차 리콜제도의 시행에 따른 편익산정)

  • Sung, Nak-Moon;Oh, Jae-Hak;Oh, Ju-Taek
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.3 s.74
    • /
    • pp.59-67
    • /
    • 2004
  • On January 1, 2003, the motor vehicle management system in Korea was transformed from government's vehicle type approval to manufacturer's self-certification. The motor vehicle recall system with self-certification is an essential mechanism to place the liability of the vehicle defects on manufacturers and hence protect consumers from automobile accidents. This study provides a methodology to measure the benefits of motor vehicle recall system in two categories: benefits of reduction in traffic accidents and benefits of severity reduction in traffic accident. Applying the proposed methodology, the benefits of implementing motor vehicle recall system in Korea were estimated. It was estimated that 745 traffic accidents, 12 fatal accidents, and 1473 injury accidents were respectively reduced in 2002 due to implementation of motor vehicle recall system.

Estimating the Benefit of the Smart Water Grid using the Contingent Valuation Method (조건부가치평가법을 이용한 스마트워터그리드의 편익 추정)

  • Ryu, Mun-Hyun;Choi, Hanju;Suh, Jinsuhk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.120-120
    • /
    • 2015
  • 기후변화에 대비한 지속가능한 물 관리를 위해 첨단 ICT를 물 관리에 접목한 스마트워터그리드(Smart Water Grid)가 미래 사회의 새로운 패러다임으로 제기되고 있다. 스마트워터그리드를 활용한 안정적인 물공급을 위해서는 다양한 수자원 확보가 필수적이다. 본 연구에서는 스마트워터그리드의 편익을 산정하기 위하여 조건부가치평가법을 이용하여 스마트워터그리드 사업을 추진하는데 소요되는 비용과 이를 통하여 생기게 될 경제적 상황을 설명하면서 응답자들에게 기꺼이 추가적으로 지불하고자 하는 금액에 대해 질문하였다. 조사로부터 얻은 정보를 활용하여 과학적인 통계적 분석을 수행함으로써 평균 지불의사를 추정하고 이를 스마트워터그리드 편익으로 산정하였다. 추정결과 2014년 10월 기준으로 스마트워터그리드에 대한 추가지불의사액은 3,514원(원/가구/년)이고 2013년 12월 기준 불변가격으로 환산하면 3,221원(원/가구/년)으로 추정되었다. 2013년 12월 불변가격 기준 스마트워터그리드의 연간 편익은 59,452백만원으로 추정되었다.

  • PDF

Simplification of Monte Carlo Techniques for the Estimation of Expected Benefits in Stochastic Ananlysis of Multiple Reservoir Systems (저수지군으로부터 기대편익 산정을 위한 Monte Carlo 기법의 간략화)

  • 이광만;고석구
    • Water for future
    • /
    • v.26 no.2
    • /
    • pp.89-97
    • /
    • 1993
  • For the system benefit optimization by considering risk or reliability from a multiple reservoir system using the Monte Carlo technique, many stochastically generated inflow series have to be used for the system analysis. In this study, the stochastically generated inflow series for the multiple reservoir system operation are preprocessed according to the considered system objectives and operating time periods. Through this procedure, several representative inflow series which have discrete probability levels and operation horizons are selected among the thousands of generated inflows. Then a deterministic optimization technique is applied to the power energy estimation from the Han River Reservoirs System which considers five reservoirs in the study. It took much lower computational requirements then using the original Monte Carlo Technique, even though estimated result was almost similar.

  • PDF

Study of Cost-effectiveness analyses of polluted-river sediments dredging (하천 오니토 준설에 대한 편익산정 방법 연구)

  • Kwon, Yoon Jeong;Lee, Yealin;Lee, Kangwook;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.460-460
    • /
    • 2021
  • 각종 오염물질이 수계로 유입되어 침강하면 하상에 퇴적되는데 이 오염된 퇴적물 중 질퍽한 콜로이드상의 물질을 오니토라 일컫는다. 이 오염물은 저장소 및 물환경의 변화에 따라 수질 악화의 직접적인 원인이 될 수 있는 인, 질소 등의 영양염류를 수중으로 재용출시킬 수 있는 비점오염원 종류 중 하나이다. 하천 준설은 하천에서 저수용량 확보와 하상 유지관리 및 골재확보, 수질 개선을 위해 토사를 제거하고 그 토사를 운반선에 의하여 운반하여 지정된 투기장에 투기하는 일련의 공사를 말하며, 이를 통하여 비점오염원인 오니토를 직접적으로 제거할 수 있다. 준설의 필요성 판단 및 수질개선 효과를 모니터하기 위해서는 하천의 수질과 유량을 조사해야 한다. 이때 대상구간이 요구하는 수질 기준에 부합하지 않으면 오염퇴적물 준설 기준을 통해 준설이 필요한 구간 및 사업량을 결정한다. 준설 사업량의 경제적 타당성을 정량적으로 검증하기 위해 대상 구간을 준설을 하지 않을 시 오니토가 상시 용출된다는 가정하에 물재생시설로 이 오염물을 정화했을 때의 비용을 준설 사업비와 비교하였다. 본 연구에서는 하천공사 표준시방서(2007)에 제시된 오염퇴적물 준설 기준을 만족하는 서낙동강수계의 준설 계획 지구에 대한 계획 사업비와 해당 지구 하류에 위치한 물재생시설의 정화능력 및 운영비를 비교해 하천 준설 사업비에 대한 편익을 산정하였다.

  • PDF

Estimation of Water Quality Improvement Benefit Using Replacement Cost Approach (대체비용법을 이용한 하천 수질개선편익 산정)

  • Yeo, Kyu-Dong;Yi, Choong-Sung;Kim, Gil-Ho;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.4
    • /
    • pp.343-353
    • /
    • 2009
  • The objective of this study is to evaluate the effect of the water quality improvement by water discharge through dams and to provide a benefit estimation methodology, taking domestic situation into consideration, by the replacement cost approach analyzed with a sewage treatment plant instead of an alternative dam. To this end, facility that alternates a dam must have same functions of the discharged water from the dam and the two facilities must be able to be compared objectively. To estimate the benefit, estimation methodology of alternative facility's cost is established and criteria of cost.benefit analysis that are duration period and ratio of large scale repairing expense was presented. As a case study, the water quality improvement benefit of Song-Li-Won dam was evaluated, which is planned to be built on Nae-Sung stream in Nak-Dong River system. The results of applying this methodology to Song-Li-Won dam are 644,006 million won of the annual average discharge and 1,351,526 million won of maximum discharge. The usage of the framework in this study is expected for estimation of water quality improvement benefit in case water quality improvement project is performed.

Estimation and Comparison of Benefits of Disaster Prevention Facilities at the Masan Port with CVM and MD-FDA (조건부가치추정법과 다차원홍수피해산정법을 이용한 마산항 재해방지시설의 편익산정 비교)

  • Seo, Inho;Shin, Seungsik
    • Journal of Korea Port Economic Association
    • /
    • v.29 no.4
    • /
    • pp.289-323
    • /
    • 2013
  • This study set out to estimate and compare benefits of damage in case of storm surge at the Masan Port by using two of the most representative methodologies used to estimate benefits in port disaster prevention facility construction, namely CVM(contingent valuation method), which estimates the values of non-market goods, and MD-FDA(multi-dimensional flood damage analysis), which had usually been implemented in flood or dam projects. The benefit estimation for 30 years of costs was 2.5689 trillion won for CVM and 2.9596 trillion won for MD-FDA, which indicates that there was no big difference in benefits among disaster prevention facilities. However, in-depth testing should follow to figure out whether MD-FDA can replace CVM, which has been tested with non-market goods, when estimating the benefits of disaster prevention facilities based on those findings.

A Study on Refinement of Benefit Evaluation Methods for Preliminary Feasibility Study of Port Construction (항만건설 예비타당성 조사의 편익 산정 개선에 대한 연구)

  • Shin, Seungsik
    • Journal of Korea Port Economic Association
    • /
    • v.31 no.4
    • /
    • pp.17-38
    • /
    • 2015
  • The purpose of this study is to suggest new methods for evaluating the benefits of a preliminary feasibility study for port construction. For this purpose, this study analyzes the problem of barge loading and unloading systems, and suggests new methods such as using neighboring same kinds of ports first. The study also estimates the benefits for ports that have been evaluated by the existing theory, using the newly suggested methods. The result suggests that there is a possibility to reduce the level of economic feasibility for both general and container-exclusive ports by applying the newly suggested methods.

Flood Damage Reduction Estimation for 4 Major River Restoration Project Applying Overtopping Risk of Levee Using Bayesian MCMC (Bayesian MCMC에 의한 하천제방 월류위험도 적용 4대강살리기사업 홍수피해경감편익 산정 방안)

  • Yi, Choong-Sung;Lee, Han-Goo;Chung, Nahm-Jung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.448-452
    • /
    • 2011
  • 기존의 하천개수사업 치수경제성분석에서는 홍수피해경감편익 산정시 계획홍수위 이하의 홍수에 대해서 제방이 완벽히 방어한다는 가정 하에 제방으로 인한 피해경감액을 편익으로 산정하고 있다. 그러나 전통적 빈도해석 방법 및 수리수문 모형에 내재된 매개변수 불확실성으로 인하여 특정 하천구간에서 산정된 계획빈도 이하의 홍수위가 제방고에 해당하는 임계사상을 초과할 수도, 반대로 계획빈도 이상의 홍수위가 임계사상을 초과하지 않을 가능성도 있다. 이러한 불확실성은 수공구조물의 붕괴에 대한 잠재성을 가진 중요한 요인으로도 작용한다. 본 연구는 이러한 잠재적 위험도를 제방 월류위험도로 정의하고 이를 Bayesian MCMC에 의해 산정하는 방법을 제시하였다. 제시된 방법론은 4대강살리기사업 전 후에 대해 적용하였으며, 계획홍수위 저하에 따른 잠재적 홍수위험 감소 효과를 정량적으로 나타낼 수 있었다. 월류 위험도는 빈도별 홍수피해액의 피해발생 확률로서도 적용될 수 있으며, 이는 물리적 침수구역 설정의 어려움에 따른 홍수피해액 과다산정 문제 해결의 대안으로서도 의미가 있다.

  • PDF

대도시 지역 지하수 오염저감기술연구사업의 경제적 파급효과분석연구

  • 김성용;안은영;이재욱;손병국;김정찬
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2004.04a
    • /
    • pp.403-407
    • /
    • 2004
  • 한국지질자원연구원에서 1998년부터 2002년까지 기본사업으로 5년간 수행한 대도시 지역 지하수 오염저감기술연구사업의 경제적 파급효과로서 조건부가치측정법을 활용하여 연구사업성과의 비용, 편익, 순현재가치, 비용편익비, 내부수익률을 산정하였다. 분석과제의 주요성과 중 계량화가 가능한 직접 편익은 지하수 음용화 시설 구축에 따른 편익 및 지하수 데이터 가치 편익 두가지로 분석되었다. 이들 편익에 대한 경제적 파급효과를 2002년도 현재가치로 환산한 결과, 비용은 50.9억원, 편익은 676.9억원, 순현재가치는 626.0억원, 비용편익비는 13.3, 내부수익율은 152%로 나타났다.

  • PDF

Calculation of optimal design floods using cost-benefit analysis considering uncertainty (불확실성을 고려한 비용-편익분석을 이용한 최적설계홍수량 산정)

  • Kim, Sang Ug
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.275-275
    • /
    • 2020
  • 홍수빈도분석의 실용적 측면의 목적은 특정 재현기간에 대하여 발생 가능한 홍수량을 설계홍수량(design flood)으로 설정함으로써 댐, 제방, 배수시설, 하수관거 등의 치수기능을 가진 치수시설물이 설계홍수량 내에서 홍수로 인한 피해를 발생시키지 않도록 그 규모와 기능을 설계함에 있다. 이와 같은 중요한 기능을 담고 있는 홍수빈도분석의 기술적 절차는 해외 및 국내의 기존 연구자들에 의해 많은 연구가 진행된 바 있으나, 보다 적절한 설계홍수량 산정절차 및 설계홍수량의 최종 결정을 위한 기술적 수단의 제공을 위한 연구가 많은 연구자들에 의해 지금도 진행 중에 있다. 그러나 이와 같이 결정된 설계홍수량이 특정유역에서 발생될 수 있는 피해규모에 대해 얼마나 적정한 지의 여부를 과학적으로 판단하기 위한 연구는 많지 않다. 따라서 본 연구에서는 홍수빈도분석을 통해 산정된 설계홍수량의 적정성 여부를 과학적으로 판단하기 위해 비용-편익분석 기법을 이용하여 최적설계홍수량을 결정하였다. 특히 본 연구에서는 불확실성으로 발생되는 범위를 고려한 최적설계홍수량을 산정하기 위하여 Metropolis-Hastings 알고리즘을 사용하였으며, 자료의 종류에 따른 홍수량의 변화를 분석하기 위하여 년최대계열 및 부분시계열 자료를 각각 적용하였다. 한강유역에서 가평대성, 여주 및 한강대교 수위표 지점에서 측정된 자동관측유량장치에 의한 홍수량 자료를 활용하였으며, 최적설계홍수량이 기존 설계홍수량에 비해 크게 산정됨을 알 수 있었다.

  • PDF