• Title/Summary/Keyword: 편익/비용

Search Result 719, Processing Time 0.023 seconds

A Study on Benefit Cost Analysis of Chungju UIS (청주시 도시정보시스템의 비용편익분석 연구)

  • Kim, Kwang Ju
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.6 no.4
    • /
    • pp.1-15
    • /
    • 2003
  • Recently, urban information system(UIS) has been developed and utilized by local governments in Korea and has become a key means of urban informatization of local governments. When UIS is conducted only for FM oriented internal utilization regardless of its cost-efficiency, however, its cost-benefit structure could be distorted seriously. The study utilizes benefit cost analysis technique and applied the technique to a model case of Chungju UIS selected by National GIS team. Chungju City developed its GIS for the management of roads and urban planning in 1993. At its beginning, the system was an efficient model with relatively strong cost-benefit structure and could produce positive net benefit 10 years' after its construction. When the city began to develop its facility management with the financial assistance from central government in 1998, however, its cost-benefit structure became distorted. As a result, it is delayed for the UIS to produce positive net benefit until the year of 2015. Using benefit cost ratio, discount rate and Mobile GIS, the study also conducts a sensitivity analysis.

  • PDF

Evaluation of Road Plan using Information Measure Technique and GIS (정보계측기법과 지리정보시스템을 이용한 도로계획의 평가)

  • Na, Joon-Yeop
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2007.10a
    • /
    • pp.239-246
    • /
    • 2007
  • 공공시설 중 도로계획의 경우 건설과정 및 건설 후의 소음 및 오염 등의 환경 사회적 비용 및 주행성 안전성 등 요소의 평가 등을 수량화가 어려운 대표적 비용으로 들 수 있는데 본 연구에서는 이러한 수량화가 어려운 비용 효과들을 포함하여 고려한 도로노선계획결과를 정보계측기법과 지리정보시스템을 이용하여 '정보량'이라는 통일된 단위로 표현하고, 기존 시설물과의 관계로부터의 '정보편익' 개념으로 평가하였다. 정보계측기법은 인간은 언어를 통하여 모든 사물을 정보로 표현하므로 '정보'라는 통일 된 단위를 사용하여 모호한 가치를 평가해 보고자 하는 방법이며, 따라서 공공시설의 계획과정에서 최적해를 찾기 위한 비용, 편익 및 환경 사회적 요소 등의 정량화되기 어려운 가치를 평가하는데도 사용될 수 있을 것이다. 정보계측기법과 지리정보시스템을 이용하여 도로건설시 발생하는 비용과 직접효과를 고려하기 위하여 시설정보계측모형을 개발하였으며, 도로 주변 시설간의 편익을 고려하기 위하여 시설정보편익모형을 구성하였다. 개발된 모형을 실제 도로계획 사례에 적용한 결과 비용과 직접효과만을 고려한 시설정보계측모형에서는 기존의 도로설계와 유사한 결과가 도출되었으며, 시설정보편익모형에서는 기존의 도로계획 평가에서 고려할 수 없었던 요소들에 대한 고려가 가능하였다.

  • PDF

Improvement Scheme on Green Construction Cost & Benefit through Analyzing Trends and Case Studies (해외사례조사를 통한 녹색건설 비용 및 편익 정보 체계의 개선 방향)

  • Kim, Won-Tae;Choi, Seok-In;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.44-54
    • /
    • 2013
  • As a green construction is a world-wide hot issue, Korean government is also putting forth a multilateral effort into reducing energy usage with setting aggressive goal under green growth policy. It is essential to analyse cost raised from designing and building green construction and benefit derived from the built facility for the sustainable green construction. However, compared to advanced countries in terms of green construction, there is lack of data and a systematic way for data collection and analysis in Korea. Without analyzing the cost-benefit of green construction, investors will hesitate to put his/her money into green construction and we can not expect its growth in construction industry. In this paper, cost of green construction was defined and categorized. Through case studies and various reports on cost-benefit analysis in advanced green construction countries, problems in terms of data collection and analysis in domestic green construction sector and improvement ways were suggested. The results of this study will contribute in classification of cost and benefit of green construction, data collection in systematic way, and increasing the feasibility of green construction via appropriate analysis on cost-benefit of green construction.

Study of the Reduction Benefit of the Traffic Suspension Damage with Flood Control (치수사업에 따른 교통두절피해 절감편익 산정에 관한 연구)

  • Jung, Han Woo;Choi, Seung An;Kim, Hung Soo;Shim, Myung Phil;Park, Kun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.771-776
    • /
    • 2004
  • 치수사업에서 실시하는 경제성분석은 계획하고 있는 사업의 사회적 후생의 극대화 측면에서 경제적 타당성을 분석 평가하는 것으로서 일반적으로 편익${\cdot}$비용분석이 사용되고 있다. 이러한 경제성분석시의 문제점으로 직접편익뿐 아니라 간접편익 및 비계량편익에 해당하는 사업의 효과도 편익부분의 계산에 포함할 수 있는 방법이 필요한 실정이다. 이에 따라 본 연구에서는 홍수에 의한 교통두절로 인한 피해를 간접편익으로 고려하여 오산천지역에 적용해 보았다. 교통두절피해 편익의 항목으로서 주로 차량운행비용 절감과 통행시간비용 절감의 두 항목을 고려하였으며, 이 두 항목에 내한 결과에서 홍수지체시간당(단위 1일당) 적지 않은 편익이 발생하는 것으로 나타났다. 본 연구를 통해 일반적인 치수사업 경제성분석에서 이뤄지지 않았던 교통두절에 의한 피해항목을 간접편익으로 고려함으로써 홍수로 인한 교통두절피해를 정량적으로 계량할 수 있었으며, 실질적으로 편익에 영향이 가장 큰 편익가치(재화가치, 시간가치)에 대한 연구가 계속적으로 수반된다면 이후의 다른 치수사업 경제성분석시에 효과적인 분석이 이뤄질 것으로 판단된다.

  • PDF

The Study of Cost-benefit Analysis on Fissure Sealant and Regular Checkup for Prevention of Dental Caries (치아우식증 예방을 위한 영구치 구치부 교합면 치면열구전색 및 정기검진의 비용 편익 분석)

  • Noh, Hie-Jin
    • Journal of dental hygiene science
    • /
    • v.2 no.2
    • /
    • pp.53-62
    • /
    • 2002
  • The purpose of this study is to investigate the retention and caries prevention practical effectiveness of fissure sealant and regular checkup with cost-benefit analysis. The data of this study is based on "2000 The Survey of Korean Oral Health" by Ministry of Health & Welfare. This study is to investigate cost-benefit analysis on proper treatment for the decayed, in case of operating fissure sealant on molars at 1 year after eruption of permanent teeth. The obtained results were as follows: (1) Cost-benefit analysis on fissure sealant in 6-75 year old 43,736 thousand Korean people reveals that cost of fissure sealant is 1,610,994 million won and benefit is 69,460,691 million won. (2) Benefit of fissure sealant is 39.51 times as much as cost of fissure sealant. (3) Cost of twice in a year regular checkup is 2,678,544 million won. Indirect cost of regular checkup is 2.6 times as much as direct cost. (4) Cost of fissure sealant and twice in a year regular checkup is 4,289,538 million won, and benefit is 69,460,691 million won. Benefit of fissure sealant and twice in a year regular checkup is 16.2 times as much as cost.

  • PDF

Cost Benefit Analysis of Foreign Research Information Centers (외국학술지지원센터 운영 사업의 비용편익분석)

  • Kim, Kwang-Seok;Oh, Dong-Geun;Yeo, Ji-Suk
    • Journal of Korean Library and Information Science Society
    • /
    • v.43 no.1
    • /
    • pp.287-301
    • /
    • 2012
  • This article analyzes the costs and benefits of the seven individuals centers of Foreign Research Information Center. Results of the investment feasibility analysis based on 30 years time span show that 0.99 of BCR (Benefit-Cost Ratio), 5.49% of IRR (Internal Rate of Return), and -507 million Won of NPV (Net Present Value). Sensibility analysis suggests that BCR can be influenced by the journal usage, social rate of discount, and elimination of the duplicate journal among individual centers.

Environmental Benefit Analysis for Railroad-related Projects (철도관련 사업에서의 환경편익 고려방안)

  • Nam, Doo-Hee;Huh, Hyun-Mu;Lee, Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.2
    • /
    • pp.179-184
    • /
    • 2012
  • Environmental impact is getting more attention in many feasibility studies for railroad-related projects and research items. For sustainable growth and green transportation, the benefits typically used for feasibility studies in railway-related projects, are composed mostly of economic criterions which is not considering growing attention on changing paradigm. Based on the analysis of current methodologies, improvements in estimating environmental impact especially on noise and pollution are suggested. Active steering bogie has been proposed to satisfy stabilizing and steering performance of railroad. This paper describes the feasibility study of the active steering bogie for a urban railway vehicle based on environment-related criteria.

Current Methodologies for Environmental Impact Studies of Railroad-related Projects (철도사업 타당성조사의 환경편익 계량화)

  • Nam, Doo-Hee;Lee, Jin-Sun;Min, Bo-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1300-1305
    • /
    • 2011
  • Environmental Impact is getting more attention in many feasibility studies for railroad-related projects and research items. For sustainable growth and green transportation, the benefits typically used for feasibility studies in railway-related projects, are composed mostly of economic criterions which is not considering growing attention on changing paradigm. Based on the analysis of current methodologies, improvements in estimating environmental impact especially on noise and pollution are suggested.

  • PDF

- Cost-Venefit Analysis for Safety Management with Accident Scenario - (사고 시나리오에 따른 안전관리 비용-편익분석)

  • 장서일;이영재;이헌창;김태옥
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.15-20
    • /
    • 2003
  • 본 연구에서는 계절별 기후인자를 고려하여 정성적 및 정량적 위험성 평가를 실시하여 사고 시나리오를 설정하였고, 비용-편익분석을 실시하여 사고 시나리오별 안전관리 비의 효율을 분석하였다. 그 결과, 최악의 시나리오는 비정상조업에서 유지보수 오류이었고, 가능성 있는 시나리오는 HAZOP 구간#4에서 발생되는 가스 누출사고이었으며, 각 사고 시나리오에서 전체 안전관리 투자비에 대한 편익/비용은 0.043과 0.13이었다. 이때 각 사고 시나리오에서 비용 효과적인 안전관리 항목을 평가할 수 있었다.

  • PDF

An Economic Evaluation of an Integrated Service Platform of Open Access Research Papers (오픈액세스논문 통합서비스플랫폼의 경제성 평가)

  • Kwon, Nahyun;Pyo, Soon Hee;Lee, Jungyeoun;Kim, Wan Jong;Moon, Sunung
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.56 no.3
    • /
    • pp.265-290
    • /
    • 2022
  • An economic evaluation was conducted using cost-benefit analysis for an integrated service platform of open access research articles. The data needed for benefit measurement were collected by conducting a series of surveys to service beneficiaries, including 1,313 academic researchers, 49 bio-industry researchers, and 102 researchers in various industries. Cost-benefit analysis and sensitivity analysis were conducted after estimating the total costs for system construction and operations, anticipated direct and indirect benefits. With respect to the cost-benefit analysis limited to direct benefits, the estimated benefit was KRW 82 billion, which is about 14 times of the total costs for eight years of the entire business period. With respect to the cost-benefit analysis for both direct and indirect benefits, BCR was estimated to be about 98.9 and NPV to be KRW 538.8 billion, indicating that economic feasibility of the project was sufficiently secured. The results of this analysis may help securing the investment to the integrated service platform for OA research products, and the benefit estimation model developed in this study would be utilized as an assessment tool during the rest of this project.