• 제목/요약/키워드: 특성화방안

검색결과 12건 처리시간 0.021초

Importance and Specialization Plan of the Indicators by the Function of the Arboretum (수목원 기능별 지표의 중요도와 특성화방안 - 대구, 경북, 경남 수목원을 대상으로 -)

  • Kim, Yong-Soo;Ha, Sun-Gyone;Park, Chan-Yong
    • Journal of Korean Society of Forest Science
    • /
    • 제98권4호
    • /
    • pp.370-378
    • /
    • 2009
  • This study tries to provide the basic direction to form the arboretum with the distinct features by providing the basic data to help the differentiated strategy for each arboretum. For this purpose, the users' pattern, importance of the indicator by the function, and the stimulation and specialization importance were examined for Daegu Arboretum, Gyeongbuk Arboretum and Gyeongnam Arboretum in Gyeongsang Province. The result says, looking into the functions of arboretum, the collection function showed the highest importance in the preservation of the endangered crisis species; the display function showed the highest in the use as the nature experiencing spaces through the plant exhibition; the research function showed the highest in the study on Plant Systematics; the education function showed the highest in the protection of the native plants; and the recreational function showed the highest in the healthy recreational space. In the plan for the promotion of the arboretum showed the highest in the public education program operation such as the narration from arboretum and education for plant. Therefore, it is considered to need the system setup such as the education program, material development and specialist training in terms of the arboretum. For the specialization plan for arboretum in this study, it seem desirable to concentrate on the research and education related to the natural resources renewal, for Daegu Arboretum; to concentrate on the resort site for the protection and display of the species and the disabled visitors by utilizing the geographical traits in the mountains, for Gyeongbuk Arboretum; to create the specialization plan mainly for the tree species suitable for the warm weather and for the children.

Estimation of Optimal Size of the Treatment Facility for Nonpoint Source Pollution due to Watershed Development (비점오염원의 정량화방안에 따른 적정 설계용량결정)

  • Kim, Jin-Kwan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • 제8권6호
    • /
    • pp.149-153
    • /
    • 2008
  • The pollutant capacity occurred before and after the development of a watershed should be quantitatively estimated and controlled for the minimization of water contamination. The Ministry of Environment suggested a guideline for the legal management of nonpoint source from 2006. However, the rational method for the determination of treatment capacity from nonpoint source proposed in the guideline has the problem in the field application because it does not reflect the project based cases and overestimates the pollutant load to be reduced. So, we perform the standard rainfall analysis by analytical probabilistic method for the estimation of an additional pollutant load occurred by a project and suggest a methodology for the estimation of contaminant capacity instead of a simple rational method. The suggested methodology in this study could determine the reasonable capacity and efficiency of a treatment facility through the estimation of pollutant load from nonpoint source and from this we can manage the watershed appropriately. We applied a suggested methodology to the projects of housing land development and a dam construction in the watersheds. When we determine the treatment capacity by a rational method without consideration of the types of projects we should treat the 90% of pollutant capacity occurred by the development and to do so, about 30% of the total cost for the development should be invested for the treatment facility. This requires too big cost and is not realistic. If we use the suggested method the target pollutant capacity to be reduced will be 10 to 30% of the capacity occurred by the development and about 5 to 10% of the total cost can be used. The control of nonpoint source must be performed for the water resources management. However it is not possible to treat the 90% of pollutant load occurred by the development. The proper pollutant capacity from nonpoint source should be estimated and controlled based on various project types and in reality, this is very important for the watershed management. Therefore the results of this study might be more reasonable than the rational method proposed in the Ministry of Environment.