• Title/Summary/Keyword: 통합 리스크 분석

Search Result 54, Processing Time 0.03 seconds

A Development of Integrated Risk Management Model of Large Construction Projects (건설분야 통합 리스크관리에 관한 구성 모델)

  • Kim Chang-Hak;Park Seo-Young;Kang In-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.101-108
    • /
    • 2004
  • The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

  • PDF

A Development of Integrated Prototype Model for Risk Management of Construction Projects (건설공사의 리스크관리를 위한 통합전산모형 구축)

  • Kim, Chang-Hak;Park, Seo-Young;Kang, In-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.469-480
    • /
    • 2006
  • The results of the study include a computerized system and a systematic process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The methodology for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

Integrated Risk Analysis for Mitigation the Urban Flood Disaster (도시홍수 피해 경감을 위한 통합 리스크 분석)

  • Lee, Jae Yeong;Keum, Ho Jun;Han, Kun Yeun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.50-50
    • /
    • 2017
  • 도시홍수의 잠재적 위험은 홍수경감계획이 발전됨에 따라 감소하지만, 침수피해 가능성은 도시화와 도시 확장에 따라 증가한다. 침수피해 가능성에 대한 사전 파악 및 위험도 분석은 대규모 침수재해 발생 시의 위기관리에도 도움을 준다. 또한, 경제적 피해에 대한 예측은 재해발생 후 복구 및 복원 작업에 필요한 자원 할당에 매우 유용하며, 잠재적 홍수 피해에 대한 예측은 장기적인 홍수경감계획과 재해관리에 필요하다. 본 연구에서는 다차원 침수해석 모형의 결과로 산정 가능한 침수심, 유속 등의 지표들을 복합적으로 고려하여 침수위험도를 산정하고, 침수 발생 위험이 있는 지역의 인문 사회 경제적 지표를 통해 피해 저감 및 복구성을 반영하기 위한 재해 취약인자를 선정하여 해당 지역에 대한 취약도를 산정하였다. 또한, 분석된 위험도와 취약도의 연산으로 통합리스크 분석을 실시하여 침수 발생 시 해당지역에 대한 피해 예상과 지역별 상대평가가 가능하도록 하였다. 위험도와 취약도 및 리스크 분석은 다양한 인자를 동시에 고려하기 위해 여러 개의 기준에 대한 선호도를 결정하거나 최적 대안을 선택하는 다기준의사결정(MCDM)기법을 적용하였으며, MCDM기법 중 보편적으로 많이 이용되는 TOPSIS기법을 적용하였다. 이러한 리스크 분석은 우리나라 전체, 특정 시도, 시군구, 읍면동 간의 침수피해와 관련한 상대적 비교 평가가 가능하며, 대응 및 대비의 관점에서 저감 대책 수립의 우선 지역을 도출하는 데 활용될 수 있을 것이며, 침수피해 발생 후, 리스크가 큰 지역에 대해 우선적으로 복구 조치가 이뤄질 수 있을 것이다. 또한, 한정된 지자체 예산 안에서 도시홍수 피해 경감 대책 수립을 위한 의사결정에 활용될 수 있을 것으로 판단된다.

  • PDF

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Development of integrated disaster mapping method (II) : disaster mapping with risk analysis (통합 재해지도 작성 기법 개발(II) : 리스크 분석을 적용한 재해지도 작성)

  • Park, Jun Hyung;Kim, Byunghyun
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.1
    • /
    • pp.85-97
    • /
    • 2022
  • In this study, a method for an integrated flood risk mapping was proposed that simultaneously considers the flood inundation map indicating the degree of risk and the disaster vulnerability index. This method creates a new disaster map that can be used in actual situations by providing various and specific information on a single map. In order to consider the human, social and economic factors in the disaster map, the study area was divided into exposure, vulnerability, responsiveness, and recovery factors. Then, 7 indicators for each factor were extracted using the GIS tool. The data extracted by each indicator was classified into grades 1 to 5, and the data was selected as a disaster vulnerability index and used for integrated risk mapping by factor. The risk map for each factor, which overlaps the flood inundatoin map and the disaster vulnerability index factor, was used to establish an evacuation plan by considering regional conditions including population, assets, and buildings. In addition, an integrated risk analysis method that considers risks while converting to a single vulnerability through standardization of the disaster vulnerability index was proposed. This is expected to contribute to the establishment of preparedness, response and recovery plans for providing detailed and diverse information that simultaneously considers the flood risk including social, humanistic, and economic factors.

An Integrative Method of FTA and FMEA for Software Security Analysis of a Smart Phone (스마트 폰의 소프트웨어 보안성 분석을 위한 FTA와 FMEA의 통합적 방법)

  • Kim, Myong-Hee;Toyib, Wildan;Park, Man-Gon
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.2 no.12
    • /
    • pp.541-552
    • /
    • 2013
  • Recently software security of the smart phone is an important issue in the field of information science and technology due to fast propagation of smart technology in our life. The smart phone as the security critical systems which are utilizing in terminal systems of the banking, ubiquitous home management, airline passengers screening, and so on are related to the risk of costs, risk of loss, risk of availability, and risk by usage. For the security issues, software hazard analysis of smart phone is the key approaching method by use of observed failures. In this paper, we propose an efficient integrative framework for software security analysis of the smart phone using Fault Tree Analysis (FTA) and Failure Mode Effect Analysis (FMEA) to gain a convergence security and reliability analysis technique on hand handle devices. And we discuss about that if a failure mode effect analysis performs simpler, not only for improving security but also reducing failure effects on this smart device, the proposed integrative framework is a key solution.

A Study on Disaster Recovery Planning and Automation Support System Implementation in a Data Consolidation Center of Multi-organizations (다기관 통합전산센터의 재해복구체계 및 자동화시스템 구축에 관한 연구)

  • Im, Seong-Muk;Lee, Yeong-Jae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.215-219
    • /
    • 2004
  • 본 연구에서는 다기관 통합전산센터의 다양한 운영모형 분석을 통한 효과적인 운영 대안을 수립하고, 최적 운영대안의 상시운영체계(BCP) 구성방향을 제시한다. 또한 현행 다기관 통합전산센터의 리스크 분석과 리스크 관리 특성을 모형화하여 다기관 통합전산센터의 상시운영계획 이행 절차의 자동화 시스템 구축 방안을 제시한다. 이를 위해 본 연구는 4가지 사항을 중점적으로 다루었다. 첫째, 통합전산센터와 관련한 다양한 용어에 대해 정리를 하고, 통합전산센터의 국내외 사례를 살펴봄으로써 통합전산센터의 중요요소를 도출하였다. 둘째, 다기관 통합전산센터의 논리적 운영모형을 분류하여 각 모형에 따른 장${\cdot}$단점과 실현가능성을 진단하고, 대표적인 모형에 대한 가상환경을 구성하여 운영비용 측면에서 비교하였다. 또한 AHP기법을 이용하여 관련 전문가 인터뷰를 통한 정성적인 측면에서의 비교도 실시하였다. 셋째, 운영모형분석을 통하여 도출된 최적대안에 대한 다기관 통합전산센터의 상시운영체계의 수립 방향에 대하여 기존의 정보시스템을 위한 방법론과의 비교를 통하여 설명하였다. 넷째, 다기관 통합전산센터의 상시운영체계의 구성방향을 반영한 자동화시스템의 기본적인 구축방안에 대하여 간략하게 정리하고 그 기대효과를 제시하였다.

  • PDF

A Risk Management Method Using Fuzzy Theory for Early Construction Stage (퍼지이론을 이용한 초기 건설공사의 리스크 관리 방법)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.136-143
    • /
    • 2004
  • This study presents a risk management methodology using fuzzy theory for early construction stage and is focused on risk identification and risk analysis. This study identifies various risk factors associated with activities clearly construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The risk analysis method presented in this study is based on the RBS that has two levels such as upper level and lower level. The risk exposure of lower level risk factors is assessed by fuzzy inference. The weight of risks is estimated by fuzzy measure. Then, the estimated risk exposures and weights are aggregated to assess the risk exposure of upper level risks by Choquet fuzzy integral. The risk exposure of upper level risks determine the priority of risk factors in view of risk management. This study performs case study to validate the proposed method. The result of case study shows that the methodology suggested in this thesis would be utilized well in evaluating risk exposure.

An Exploratory Study on Risk Factor in Supply Chain (공급사슬상의 리스크 요인에 관한 탐색적 연구)

  • Shin Chang-Hoon;Jeaung Dong-Hun;Choi Min-Seung
    • Journal of Navigation and Port Research
    • /
    • v.30 no.1 s.107
    • /
    • pp.67-71
    • /
    • 2006
  • This study gathered the factors of supply chain risk through literature review, and measured the importance of risk factors recognized by domestic companies. The purpose and necessity of this study are as follows. First, supply risk factors were classified and explored through empirical studies about supply chain risk. Most of the previous studies concentrated on the meaning of supply chain risk, but only in terms of concept approach Second, to evaluate the importance of supply-chain risk recognized by the companies, AHP(Analytic Hierarchy Process} method was proposed in this paper. Finally, this study suggests implications for companies' efficient supply activity by measuring the importance of supply-chain through AHP(Analytic Hierarchy Process).

A Study on Perception of Risk Factor in Supply Chain - Focus on Distribution Center - (공급사슬에서 존재하는 위험(Risk)요소의 인지에 관한 연구 - 물류센터를 중심으로 -)

  • Shin, Chang-Hoon;Jeoung, Dong-Hun;Choi, Min-Seung
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.269-274
    • /
    • 2005
  • This study gathered the factor of supply chain risk through literature review, and measured the importance of risk factors which have been recognized by domestic companies. This study has purposes and necessities as follows. First, supply risk factors were classified and explored through positive studies about supply chain risk. Most of previous studies helps grasping the meaning of supply chain risk but limited in conceptual side. Second, this study used AHP(Analytic Hierarchy Process) method which makes decision-making problem classified, simplicated and systematized to evaluate the importance of supply-chain risk recognized by the companies. Finally, this study suggests registration-point in companies's efficient supply activity would be great by measuring the importance of supply-chain through AHP(Analytic Hierarchy Process).

  • PDF