Traditionally, the problems of manufacturing technology and manufacturing management have been treated independently. In this research, we endeavor to integrate the process planning and scheduling activities as an attempt to integrate the two realms. To draw up a plan of process planning and scheduling in real manufacturing environment is not an easy task because available time to plan could be limited and the shop status could change frequently. So we propose an architecture of integrated process planing and scheduling problem within the allowed time even if sheep situations change rather frequently. We argue that we can obtain a better and practical scheduling solution by dynamically changing the processing machines and operations as the shop condition changes. The proposed system takes the initial information for alternative machines and operations represented by an AND/OR graph as its input. Other informational inputs to the system are part order and shop statues. The system then generates new process plan and schedules during permitted time. Experimental results show that the proposed scheme provides a viable solution for real world scheduling problems.
Proceedings of the Korean Information Science Society Conference
/
2006.10c
/
pp.214-217
/
2006
XML 문서의 검색을 위한 질의 언어인 XQuery는 다양한 데이터 소스로부터 가져온 고유한 구조를 가진 질의 결과로 구성할 수 있도록 설계되어 XML질의 언어의 표준이 되었다. XQuery를 이용해 특별히, 분산 환경에서 다중 XML문서 를 대상으로 하는 통합 질의의 경우, 질의 처리 계획을 결정하는 것은 처리 효율과 직결된다. 따라서 질의 처리 계획을 결정하는 요소 중 하나인 조인 처리 방법의 연구는 중요하다. 그러나 통합 질의에서 조인구조를 기준으로 단일 XML문서에 대한 질의 처리방법을 결정하는 것은 쉽지 않다. 본 논문에서는 분산환경에서 다중 XML문서를 대상으로 하는 조인을 포함한 다양한 통합 질의를 대상으로 실험을 통해 병렬처리 방법과 순차처리 방법 그리고 두 가지 처리방법을 조합한 하이브리드 방법을 적용하여 처리 시간을 비교 분석하고, 다중 문서에 대한 효율적인 조인방법과 순서를 모색한다.
한국통합물류협회는 7월 30일 여의도에 위치한 협회 회의실에서 포장 및 물류 산업계 기자들을 초청, 간담회를 열고, 향후 사업 계획을 발표했다. 한국통합물류협회는 6월 25일 창립총회를 열고 공식 출범, 분산되고 영세한 물류산업계의 목소리를 하나로 결집하여 정부와 파트너십을 구축하는 구심점 역할을 충실히 수행하고, 물류산업의 경쟁력 강화와 회원사의 물류선진화 및 권익신장에 기여하고자 설립됐다. 물류관련 단체의 통합으로 물류산업이 국가경제 발전의 주요한 견인차 역할을 수행하며, 미래의 국가성장 동력산업으로 자리매김할 수 있을 것으로 물류관련 기업들이 기대하고 있는 현재, 김진일 회장에게 향후 운영 계획을 들어 보았다.
도시간선도로의 신호시간요소를 계획하는 방법은 크게 3가지로 나뉜다. 이들은 통 과폭 최대화모형, 지체도 최소화 모형 그리고 이들 두 가지 모형의 통합모형으로 구분된다. 기존의 통합모형은 지체를 줄이기 위하여 최대 통과폭 모형인 PASSER-II로 최적화된 좌회 전현시순서를 TRANSYT-7F에 사용하는 방법이다. 그러나 통과폭 최대모형과 기존의 통합 모형은 지체를 최소화해주지 못하고, 반면에 지체도 최소화모형인 TRANSYT-7F는 좌회전 현시순서를 최적화 시켜주지 못하는 단점을 가지고 있다. 따라서 본 연구의 목적은 기존 모 형들의 갖고 있는 단점을 극복하기 위하여 좌회전현시를 최적화하면서 지체를 최소화해줄 수 있는 새로운 모형(KS_SIGNAL)을 개발하는데 있다. 개발된 모형은 MAXBAND 등과 같은 최대통과폭모형을 발전시킨 혼합정수계획법 형태를 갖는다. 평가결과에 의하면 개발된 모형 으로 최적화된 좌회전현시순서를 TRANSYT-7F에 사용할 경우 TRANSYT-7F나 PASSER-II 와 TRANSYT-7F를 통합한 기존 모형들보다 지체를 줄일 수 있는 것으로 나타났다.
페인팅작업에의 로보트응용은 열악환경의 극복, 자동화, 품질의 향상수단으로서 강력한 대안책이며 이에 관한 관심이 국내외에 고조되고 있다. 본 논문에서는 이전에 제시한 바있는 자동동작계획의 개념을 확장하여 통합페인팅시스템을 위한 Extended ATPS(Automatic Trajectory Planning System)를 개발하고, 이의 구현 및 검증을 위한 하드웨어 시스템의 개발현황을 소개한다. 개발될 시스템은 하드웨어 및 소프트웨어가 일식화된 로보틱페인팅 시스템으로서 동작계획의 자동화 뿐만아니라 측정 및 제어기능을 소프트웨어에서 일관처리하는 새로운 방식이다.
The Journal of Information Technology and Database
/
v.1
no.2
/
pp.53-70
/
1994
정보시스템 계획수립은 정보시스템 분야의 가장 주된 관심사이다. 최근에 들어 국내에서도 정보기술의 급격한 발전과 업무활동의 통합 필요성에 따라 이에 대한 관심이 매우 높아지고 있다. 실제로 정보시스템 계획수립에는 많은 자원이 소요되고, 이를 올바르게 수행하여 소기의 효과를 거둔다는 것은 쉽지 않은 일로 여겨지고 있다. 본 연구는 정보시스템 계획수립상 겪는 문제점을 토대로 문제점간의 인과관계모형을 제시한다. 이 인과모형은 국내 정보시스템 계획수립상의 문제점을 체계적, 근원적으로 해결하는 방안의 마련에 활용될 수 있을 것이다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.498-503
/
2002
Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.
Because yard monitoring system is a part of real-time operation system and yard planning system, most planers, in container terminal, Busan Port, can not consider real-time and exact yard situation and container information such as position of equipments or movement of container with current planning system when export yard planning os established. Therefore, many planers recognize the limit of current planning system and try to find the solution to get over it. The reason of this, heuristic algorithms for the export yard the limit of current planning ,operating on monitoring system, are suggested and integrated export yard planning system is designed and developed in this paper.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.42-51
/
2017
Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.