• Title/Summary/Keyword: 토사관리계획

Search Result 45, Processing Time 0.031 seconds

Review on Soil Erosion and Loss Management System of the Calgary City Government, Albert, Canada (캐나다 앨버트 주 캘거리 시의 토사관리제도에 관한 고찰)

  • Kim, Youngchul;Kim, Lee-Hyung;Hwang, Sung Woo
    • Journal of Wetlands Research
    • /
    • v.17 no.2
    • /
    • pp.163-175
    • /
    • 2015
  • In this paper, soil erosion and soil loss management system (SMS) of the City of Calgary in Albert, Canada was reviewed. Regulatory basis supporting this soil management system, permit process and conditions, guidelines and principles for the SMS, and monitoring and repair duties, inspection were discussed. Permit process in the City of Calgary is handled mainly by Urban Development Division, in which special task force called CPAG (Coorporative Planning Application Group) (if necessary circulated through related subdivisions). Inspects all the permit conditions and decides permit or refusal, and LUM (Land Use and Mobility) advertises the approval, if there is no appeals, permit is released to developers. If permit is rejected, applicant can appeals Development Appeal Board, it can approve or reject. In addition to permit, the city has manual for soil management plan, which includes BMP selection, design, monitoring, maintenance, and inspection activities. Perfect SMS policy does not necessarily guarantee relieving the soil-particle related pollution problem, but in Korea, we have to recognize that construction works during development is potentially the most destructive stage of environmental pollution. The central and local governments must make preparations for the effective and tight regulations and ordinance which is appropriate for regional social-economic conditions.

Sediment Budget Analysis of the Naesung-cheon Watershed (내성천 유역의 토사 수지 분석)

  • Kim, Dae-Gon;Yang, Moon-Yong;Ha, Sung-Won;Yu, Kwon-Kyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1755-1759
    • /
    • 2010
  • 유역내 토사의 산출, 이송, 퇴적, 유출 과정을 분석하는 토사 수지 분석은 유역의 토사 관리 계획을 수립하는 데 핵심적인 과정이다. 또한, 댐건설은 하상에 급격한 변화, 댐 상류 하상의 상승, 댐저수지의 매몰, 댐하류 하상의 저하 등 하상 변동을 일으킨다. 그러나 기존의 하상 변동 분석에서는 모형의 핵심적인 입력 자료인 댐 저수지의 토사 유입에 대해서는 합리적인 검토를 수행하지 못하였다. 따라서, 본 연구에서는 유역 자료와 하천 자료, 유사량 측정 자료 등을 이용하여, 유역의 토사 산출량을 추정하고 이를 하상 변동 모형의 입력 자료로 하여, 전체 유역의 토사 수지를 분석하는 방법을 제안하였다. 유역의 토사 산출은 GIS 자료와 RUSLE를 적용하였다. 이 방법을 영주댐이 건설될 계획이 있는 내성천 유역에 적용하였으며, 댐 건설 후 장기적인 토사 수지의 변화를 추정하였다. 그 적용 결과 제시된 방법에 의해 기존의 하천 유사량 측정에 의한 유역의 비유사량 산정 결과와 유사한 결과를 얻을 수 있었다. 또한, 영주 댐 건설에 따라 상당히 큰 규모의 하상 변동이 예상되며, 이에 대한 토사 관리 대책의 수립이 필요한 것으로 나타났다.

  • PDF

Estimation of Sediment Discharge Controlled by Sediment-filled Check-dam in a Forested Catchment (산림유역의 만사 사방댐에 의한 토사유출 조절 효과 추정)

  • Seo, Jung Il;Chun, Kun Woo;Song, Dong Geun
    • Journal of Korean Society of Forest Science
    • /
    • v.105 no.3
    • /
    • pp.321-329
    • /
    • 2016
  • To estimate the sediment discharge controlled by sediment-filled check-dam and thereby enhancing factor for check-dam design and dredging criteria, we surveyed slope failures and stream-bed fluctuation caused by geomorphic disturbances (i.e., landslides and debris flows) in Inje, Gangwondo. In general, check-dams play roles for restraining and controlling sediment discharge within a section under the design equilibrium gradient and a section under the design flood gradient, respectively. The results in this study showed same pattern: that is, the closed type check-dam, which has a design restraint sediment discharge of $2,111m^3$, estimated to control a sediment discharge of $3,996m^3$ in the stream section within 250 m right upper area immediately after the disturbances occurred in 2006. As a result, a design control sediment discharge of the check-dam was larger than its design restraint sediment discharge. This represents that the check-dam is still having an own function for controlling sediment discharge although it exceeded the designed capacity by the sediment discharged from upstream during the disturbances. Our finding suggests that the sediment discharge controlling of check-dam may need to be evaluated separately from its sediment discharge restraint. Currently, the country, however, does not consider the design control (or restraint) sediment discharges, based on the actual field survey, as criteria for check-dam design and/or dredging work. Therefore, the accumulation of the quantitative data is required to support that check-dam has functions for both restraining and controlling sediment discharge. This would be a way to develop our erosion control technology to the scientific technology equipped with a more objective and systematic aspects.

The estimation of GIS-based soil erosion considering up- and down-stream topographic characteristics (상하류 지형특성을 고려한 기반 GIS 토사유실 평가)

  • Lee, Geun-Sang;Park, Jin-Hyeog;Hwang, Eui-Ho;Koh, Deuk-Koo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.333-337
    • /
    • 2006
  • The purpose of this paper is to present a strategic approach to selecting prior areas of soil erosion to be examined for effective soil conservation planning and management, in conjunction with remote sensing data and GIS skill for surface characteristics. To do this, two basins are selected: Andong and Imha basin. Geographically one is in the vicinity of the other but turbidity in the main reservoir of each basin is quite different. it is important to clarify general behavior of soil erosion driven by rainfall event for both basins for further understanding and effective soil conservation planning and management. Also, Both basins are divided into several sub-basins and the severity of soil loss is intensively investigated to identify areas with high erosion potential for each sub-basin so that the efficiency of soil conservation program may increase. Especially, this study analyzed soil erodibility factor(K), topographic factor(LS), cover management factor(C) and soil erosion; 3 sub-basins for Andong basin (up-, mid-, downstream) and 6 sub-basins for Imha basin (up-, mid-, and downstream for two tributaries) because Imha basin consists of two tributaries (Banyeon and Yongjeon river). The approach suggested herein will provide a guideline for choosing prior areas to be examined and managed for soil conservation planning.

  • PDF

Estimation of Soil Loss into Sap-Gyo Reservoir Watershed using GIS and RUSLE (GIS와 RUSLE 기법을 이용한 삽교호유역의 토사 유실량 산정)

  • Kim, Man-Sik;Jung, Seung-Kwon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.3 no.4
    • /
    • pp.19-27
    • /
    • 2002
  • Prediction of exact soil loss yield has as important engineering meaning as prediction of exact flow measurement in a stream. The quantity of soil loss in a stream should be considered in planning and management of water resources and water quality such as design and maintenace of hydraulic structures : dams, weirs and seawalls, channel improvement, channel stabilization, flood control, design and operation of reservoirs and design of harbors. In this study, the soil loss of Sap-gyo reservoir watershed is simulated and estimated by RUSLE model which is generally used in the estimation of soil loss. The parameters of RUSLE model are selected and estimated using slope map, landuse map and soil map by GIS. These parameters are applied to RUSLE's estimating program. And soil loss under probability rainfall in different frequencies are estimated by recent 30 years of rainfall data of Sap-gyo reservoir watershed.

  • PDF

A Study on the Design of Task Planning System for Intelligent Excavating System (IES) (지능형 굴삭을 위한 토공작업계획 시스템의 구조 설계)

  • Lee, Won-Sik;Song, Soon-Ho;Lee, Seung-Soo;Seo, Jong-Won;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.921-924
    • /
    • 2007
  • 토목, 건축과 관련된 노동현장은 여느 3D 업종들과 마찬가지로 숙련된 기능공의 부재 및 산업재해 발생으로 인해 어려움을 겪고 있으며 이를 극복하기 위한 노력을 계속하고 있다. 대표적인 토목공사인 토공 작업 역시 위험 혹은 유해한 작업환경으로 인해 토공장비의 안전사고 및 생산성과 품질저하가 발생하며 이를 방지하기 위한 장비의 지능화가 절실하게 요구되고 있다. 이를 위해 최근 지능형 굴삭 시스템 개발을 위한 연구가 진행되고 있으며, 토공작업은 일반적으로 광범위한 작업영역을 가지기 때문에 지능형 굴삭시스템의 개발을 위해서는 효율적인 작업을 수행할 수 있도록 하는 작업계획의 수립이 매우 중요하다. 본 연구에서는 작업계획의 대상을 굴삭로봇과 토사로 구분하였으며, 글로벌 영역에서 단위작업 영역, 로컬 영역으로의 분할을 통해 전체 작업 진행에 대해 효율적으로 작업계획을 수립할 수 있도록 구성하여 계획단계에서부터 토공작업 자동화 및 효율와에 기여하고자한다. 토공작업계획 시스템은 토공 작업자 및 감독자의 작업 특성 및 노하우를 컴퓨터, 즉 두뇌에 부여함으로써 숙련된 장비조종자의 작업 방법 및 특성을 반영하여 토공 작업 프로세스 모델링을 구축하고 실제 작업환경상의 센서에 의해 측정된 데이터를 실제 작업환경과 동일하게 모델링된 컴퓨터내의 가상환경을 바탕으로 영역분할, 최적 플랫폼 위치선정 및 작업 순차생성을 통해 최적의 토공작업계획을 수립할 수 있도록 한다.

  • PDF

개발사업으로 인한 토양손실량 예측 및 침사지 설계

  • 우효섭;김창완
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 1998.02d
    • /
    • pp.1101-1179
    • /
    • 1998
  • 최근에 내무부에서는 개발사업으로 인한 토사유출 피해 중 인명과 재산 피해와 같은 재해 성격을 가진 대규모 토사유출을 사전에 미리 저감시킬 목적으로 재해영향평가제를 도입하여 추진하고 있다. 이에 따라 건설 엔지니어링 업계에서는 대규모 개발 사업으로 인한 가속화된 토양손실량 예측과 침사지 설계에 많은 관심이 쏟아지고 있으나 이 분야의 기술축적과 자료부족으로 과업수행에 어려움을 겪고 있다. 본 강좌에서는 이러한 엔지니어링 업계의 기술적인 어려움을 다소 나마 해소할수 있도록 개발사업으로 인한 가속화된 토양손실량 예측방법과 침사지 설계 기준에 대해 외국의 자료를 바탕으로 그 동안 국내에서 수행한 각종 재해영향평가 자료를 검토하여 제시한다. 먼저, 재해영향평가제의 취지, 토사유출과 재해, 토사유출 재해 저감대책 등에 대해 간략히 설명한다. 다음, 침식량 예측 방법으로 미국의 범용토양 손실공식(USEL) 방법의 적용 절차에 대해 구체적으로 소개한다. 침사지 설계 편에서는 침사지 설계 개념과 구체적인 설계 절차를 제시하고 참사지 규모의 결정방법을 소개한다. 본 강좌의 교재는 미국교통연구단(TRB)의 국립합동도로연구프로그램(NCHRP)#70 자료를 주로 참고하였다. 이 자료는 부록에 원본 전부를 수록하였다. 다만 아직 이 분야 연구가 미흡한 관계로 본 강좌에서는 재해저감 측면에서 합리적인 침사지 설계 기준을 완전히 제시하지 못하고 있다. 참고로 국립방재연구소의 박무종/강대환 연구팀이 기존의 재해영향평가서 자료 중에서 10개를 선정하여 침사지 소요수면적 산정, USEL 적용, 강우침식도 R의 산정 등에 대해 사례 조사 분석한 결과를 부록에 수록하였다.을 기해야 한다. 있다. 청주권의 무심천도 계획상은 대청댐의 물을 공급 받을수도 있도록 되어 있으나 현실상으로 상수도 원수로서의 공급마저도 매년 심한 원수 수질 문제(5-6월, 10월경의 취수장 부근의 부영양화 현상으로 인한 악취와 물 맛의 문제)를 1984년부터 겪고 있다. 이와 같이 도시권 하천의 수자원은 자연적, 인위적, 경제적, 법적, 제도적 여러 제한 요소로서 특성을 가지고 있으며 이는 날로 심해 가고 있는 실정이다. 그러므로 최적 물관리 시스템의 개발이 새로이 시작하는 수자원 개발 사업에서는 계획 단계에서부터 절실히 요구되는 바이며 기존 시설물의 관리 운영은 과감히 그 운영 관리 기준을 보완 재 정비하여야 할 것이다. 지금까지 대부분의 수자원 종합 개발 계획이 홍수방이나 용수 공급 및 수력 개발 등에 주력하여 왔으나 이제는 보다 더 수자원의 환경 보전적 차원과 도시의 안정적 발달을 위한 지역 및 권역 계획과 연계지워져서 양적인 안정 공급과 더불어 질적인 향상과 연계지워서 경제-사회적 요구에 부응할 수 있도록 도시권의 수자원을 최적 관리할 수 있는 방안을 강구하여야 할 것이다. 이는 각 도시 하천의 수자원의 정량적·정성적인 특성 및 제한 요소를 충분히 감안하여 수요-공급 개념에 의하여 과감히 기존 시설(예: 팔당댐의 운영, 대청댐의 운영 등)의 관리 운영 체계를 개선하여 나가야 할 것이며, 수질 보전적-환경 보전 차원에서 저수관리 체계를 확고히 할 수 있는 방안을 강구하여야 할 것이다.펄스주입법에 의해 증착된 박박은 강유전성 이력을 나타내었다.지역과 비도시지역을 비교하는 조사 연구가 필요하며, 이러한 조사결과를 바탕으로 자녀의 식습관에 대

  • PDF

Sediment Yield Analysis of River Using RUSLE and GRID (RUSLE와 GRID를 이용한 하천의 유사유출량 분석)

  • Park, Eui-Jung;Kim, Chul;Kim, Yun-Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.334-339
    • /
    • 2005
  • 유역에서 발생하는 토양침식의 경우 하천과 가까운 거리에 있는 토사는 하천으로 유입될 가능성이 크지만 하천으로부터 멀리 떨어진 토사는 강우에 의해 하천으로 이송되는 양이 줄어든다. 따라서 유역에서 발생되는 토사량중 하천으로의 유사유출량을 계산해 낼 필요가 있다. 본 연구의 목적은 유역에서의 토양침식량을 계산하고 강우시 유출되어 하천으로 유입되는 유사유출량을 예측하여 하천의 유사유출량을 분석하는 것이다. 하천의 유사유출량을 분석하는 방법은 여러 가지가 있으나 본 연구에서는 RUSLE와 GRID를 이용하여 토양침식량을 계산하고, 유역침식량과 유사전달비 방법을 이용하여 유사유출량을 산정하였다. GIS를 이용하여 유역의 DEM자료와 경사도, 토양도, 토지이용도를 구축하여 RUSLE의 입력자료로 사용하였다. 연구대상지역은 광주광역시에 있는 영산강상류 유역을 선정하였다. 본 연구에서 산정된 하천으로의 유사유출량은 유역과 하천관리의 기본적인 사항이며 댐이나 하도의 계획, 설계, 관리, 재해영향평가 등에 활용될 수 있을 것이다.

  • PDF

Discussion on Hydrological and Hydraulic Operation in Design for Construction of Washlands (천변저류지 조성계획에서 수문 및 수리적운영에 관한 고찰)

  • Ahn, Tae-Jin;Kim, Kyung-Sub;Kang, In-Woong;Kim, Bok-Chun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.956-960
    • /
    • 2007
  • 천변저류지의 운영은 홍수기와 평상시 운영으로 구분된다. 본류하천의 홍수저감을 위한 홍수시 저류지 운영을 단기적 운영이라 한다면, 평시 저류지의 수량 관리와 같은 평시 저류지 운영은 장기적 운영이라 할 수 있다. 단기적 운영을 통하여 홍수후 저류지내 퇴적된 토사는 계획홍수조절용량을 감소시킬 뿐만 아니라 평시 저류지내 생태계에 영향을 미친다. 장기적 운영을 위한 평시 저류지내 수위는 저류지내 수질, 생태, 조경, 친수활동 등에 영향을 미친다. 또한 평시 저류지 수위부터 홍수시 수위까지 영역에 관한 수문, 생태, 친수공간, 조경 등의 고려가 필요하다. 본고에서는 천변저류지 조성 계획시 홍수저감, 유입토사 및 평시운영을 위한 수리 및 수문학적 설계기준에서 검토할 내용을 제시하고자 하였다.

  • PDF

Analysis of Riverbed Change According to the Operation of Movable Gates Considering Flood and Low Flood Periods (홍수기 및 갈수기를 고려한 가동보 수문운영에 따른 하상변동 특성 분석)

  • Kim, Ha-Yong;Yu, In-Sang;Jeong, Sang-Man
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.134-134
    • /
    • 2012
  • 일반적으로 하천에 고정보를 설치하게 되면 생태 통로의 차단, 보 상류부 수질 악화, 하천 경관 훼손 등 다양한 문제점이 발생하며 특히 상류로부터 유입된 토사가 보 상류부에 퇴적되고 보 하류부는 침식이 발생하여 보 상 하류간의 심한 표고차로 인한 하천의 연속성이 파괴될 가능성이 있다. 이러한 고정보의 문제점을 해결하기 위하여 가동보를 설치하여 홍수소통을 원활하게 할 뿐 아니라 토사가 다량 함유되어 있는 홍수류를 보에 저류시키지 않고 하류로 유하시키고 가동보구간의 증가된 유속을 이용하여 보 상류측의 퇴적 토사를 씻겨 내려가게 하는 플러싱 효과를 이용하여 보 상류부의 토사 퇴적 문제점을 해결하고 있다. 하지만 가동보 설치에 따른 기존의 하상변동분석 연구와 실무에서는 이러한 상황을 고려하지 않고 수문을 닫았을 때와 수문을 열었을 때 2가지 경우에 대해서만 하상변동분석이 이루어지고 있는 실정이다. 홍수기 및 갈수기 시 보의 계획홍수위 및 상류관리수위를 무시한 하상변동분석은 과도한 플러싱 또는 저류효과가 발생함으로써 실질적인 하상의 변동 특성을 제대로 반영할 수 없다. 본 연구에서는 금강의 보 건설 구간 중 백제보의 계획홍수위 및 상류관리수위를 유지하는 수문 운영을 반영하여 백제보 상 하류에 하상변동특성을 분석하였으며 수문 운영을 고려하지 않았을 경우의 하상변동과 비교하였다. 분석에 사용된 수치모형은 HEC-6가 탑재된 HEC-RAS 4.1을 이용하였으며 본 모형이 유사의 횡단 분포를 고려하지 못하는 한계성(1차원모형)을 가지나 하상토 및 부유사의 전체 입도분포를 고려하고 User Defined Curves를 이용하여 수문작동 옵션 지정이 가능하여 선택하여 홍수기와 갈수기를 고려한 하상변동 특성 분석을 실시하였다.

  • PDF