• Title/Summary/Keyword: 터널 효과

Search Result 857, Processing Time 0.018 seconds

A evaluation study of a fire smoke diffusion delay device installed in a great depth underground double deck tunnel (대심도 복층터널에 설치 가능한 화재연기 확산지연장치 성능 평가 연구)

  • Shin, Tae-Gyun;Moon, Jung-Joo;Yang, Yong-Won;Lee, Yun-Taek
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.225-234
    • /
    • 2018
  • Domestic urban areas are experiencing serious traffic congestion problems due to continuous population growth and increased traffic volume. In order to solve the problem of traffic congestion, the study of great depth underground double deck tunnels using underground space is being actively carried out in the urban areas. The characteristics of great depth underground double deck tunnels are low in cross section, so the spread of fire smoke is expected to spread faster than the road tunnel in case of fire. Therefore, it is necessary to provide a fire smoke delay device which delays the spread of fire smoke when a fire occurs in a tunnels. In the previous study, the diffusion effect was analyzed according to the blocking area when the fire smoke spread delay device was operated through the 3D CFD in the study of preventing the smoke spread in the case of the tunnel fire. A study on fire smoke diffusion delay device using spring elasticity which is excellent in applicability to a tunnel and economical value is studied. In this study, fire smoke spread delay system was developed to fire smoke delay was experimentally analyzed. Fire smoke delay effect of fire smoke delay device appeared. Therefore, it is considered that the can minimize the damage of the victims when installed in the great depth underground double deck tunnels.

Longitudinal arching effect of an under-passing tunnel on the existing tunnel undergoing a load of upper structures (상부 구조물 하중의 영향을 받는 기존터널에 직각 교차하는 하부 터널의 종방향 아칭효과)

  • Lee, Yong-Jun;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.6
    • /
    • pp.417-427
    • /
    • 2010
  • In the ease that a new cross tunnel is constructed under the existing tunnel, development of a longitudinal arching would be influenced by the existing tunnel. But it is not enough to investigate. Especially, the influence of the structure loads on the ground surface on the new tunnel, which the under-passes existing tunnel has been rarely studied. This study, therefore, aimed to clarify the effect of the existing tunnel and the structure on the ground surface on the development of a longitudinal ground arching during the excavation of a cross tunnel under the existing tunnel. Two-dimensional model tests were carried out in the test box, whose dimension was 30 cm (wide) ${\times}$ 113 cm (deep) ${\times}$ 87 cm (high). The existing tunnel was made of S21 steel tube in 16 cm diameter and 1 mm thickness. The ground surface load was 4.9 kPa and was loaded on the model structure in the size with 30 cm width ${\times}$ 16 cm height. New tunnel was excavated in 250 mm height by a bench cut method. As results, the longitudinal arching would be developed but it was severely influenced by not only the existing upper tunnel but also the ground surface load. The influence of the ground surface load on the development of longitudinal ground arching around a new tunnel showed the highest value when the tunnel face located direct under the surface load.

A study on the coefficients of variation of seismic load effect for the limit state design of shield tunnel based on the reliability analysis (신뢰성 기반 쉴드 터널의 한계상태설계를 위한 지진하중 효과의 변동계수에 관한 연구)

  • Park, Young-Bin;Kim, Do;Byun, Yosep;Lee, Gyu-Phil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.3
    • /
    • pp.311-321
    • /
    • 2020
  • In this study, coefficient of variation for the seismic load effect on the segment lining was calculated. The statistical characteristics of the soil property were analyzed for the probability characteristics of domestic soil. In order to calculate the coefficient of variation for the seismic load effect, the MCS technique was applied, and the closed-form equation was applied to calculate the seismic load effect. As a result of calculating the coefficient of variation, the coefficient of variation of the seismic load effect on the weathered soil was analyzed in the range of 0.06~0.15, and the coefficient of variation was judged to be used as basic data for designing the limit state of the shield tunnel on seismic condition.

Evaluation of Reinforcement Effect of Rock Bolts in Anisotropic Rock Mass Using Tunnel Scaled Model Tests (터널 축소모형실험을 통한 이방성 암반내 록볼트의 보강효과 검토)

  • Kim, Jong-Woo
    • Tunnel and Underground Space
    • /
    • v.28 no.5
    • /
    • pp.442-456
    • /
    • 2018
  • Scaled model tests were performed to evaluate the reinforcement effect of rock bolts in anisotropic rock mass. For this purpose, two tunnel cases were experimented which had different tunnel sizes, rock strengths, anisotropic angles and coefficients of lateral pressure. The fully grouted rock bolts of the D25 deformed bar were modeled as the basting pins with bead and were systematically installed at the roof and the side wall of the model tunnel. As results of the first case experimentations, the unsupported model showed initial crack at the roof of tunnel, but the supported model with rock bolts showed initial crack at the floor of tunnel where rock bolts were not installed. The crack initiating pressure and the maximum pressure of the supported model with rock bolts were 11% and 7% larger than those of the unsupported model, respectively. Moreover, the effect of the existing discontinuities in anisotropic rock mass on the fracture behavior of tunnel was reduced in the supported model, and so the reinforcement effect of rock bolt turned out to be experimentally verified. As results of the second case experimentations considering different support patterns, the crack initiating pressures of models were larger and the reduction ratios of tunnel area according to applied load were smaller as the length and the quantity of rock bolts were larger. Therefore, it was found that the performance of the rock bolts turned out to be improved as they were larger.

Influence of Tunneling Current on Threshold voltage Shift by Channel Length for Asymmetric Double Gate MOSFET (비대칭 DGMOSFET에서 터널링 전류가 채널길이에 따른 문턱전압이동에 미치는 영향)

  • Jung, Hakkee
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.7
    • /
    • pp.1311-1316
    • /
    • 2016
  • This paper analyzes the influence of tunneling current on threshold voltage shift by channel length of short channel asymmetric double gate(DG) MOSFET. Tunneling current significantly increases by decrease of channel length in the region of 10 nm below, and the secondary effects such as threshold voltage shift occurs. Threshold voltage shift due to tunneling current is not negligible even in case of asymmetric DGMOSFET to develop for reduction of short channel effects. Off current consists of thermionic and tunneling current, and the ratio of tunneling current is increasing with reduction of channel length. The WKB(Wentzel-Kramers-Brillouin) approximation is used to obtain tunneling current, and potential distribution in channel is hermeneutically derived. As a result, threshold voltage shift due to tunneling current is greatly occurred for decreasing of channel length in short channel asymmetric DGMOSFET. Threshold voltage is changing according to bottom gate voltages, but threshold voltage shifts is nearly constant.

Study on Arching Characteristics of a Grand-Section Tunnel with Pre-Steel-Rib Nail Reinforcement (대단면 터널의 선지보네일 보강에 따른 아칭특성 연구)

  • Seo, Donghyun;Cheun, Seungyul;Lee, Seungho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.6
    • /
    • pp.79-88
    • /
    • 2009
  • In this study, it was studied on arching characteristics of a grand section tunnel with pre-steel-rib nail reinforcement. In this study, we examine the adaptation of tunnel plan and the case which is based on the strengthening method for preexistence tunnel and other pre-steel-rib nail while the upper part of cover depth is low or soil condition is bad. When the pre-steel-rib nail as new technology and method reinforces the foundation placed of grand section tunnel, it is much better in strengthening effect, safety and effectiveness than the conventional one. After investigation about the plan pre-steel-rib nail method, construction case and calibration data, it was confirmed and examined about the upper part of tunnel for strengthening the pre-steel-rib nail thereby arching characteristics of grand section tunnel using MIDAS/GTS finite element program. Moreover we present the method that could upgrade the accurate installation interval and adaptation method for strengthening effect to adapt the pre-steel-rib nail method in a foundation placed over a tunnel.

  • PDF

A study on the stability analysis for grouting reinforcement in a subsea tunnel (해저터널에서의 그라우팅 보강을 위한 안정성 연구)

  • You, Kwang-Ho;Kim, Eun-Hye
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.145-155
    • /
    • 2010
  • Recently interest in subsea tunnels is increasing nationwide and the construction of a subsea tunnel is taking place. For the stability of such a subsea tunnel, grouting is necessary for the water barrier and reinforcement of the tunnel. In this study, therefore, it was investigated how the grouting reinforcement had an effect on the stability of a subsea tunnel located in a great depth. To this end, Hydro-mechanical coupled analyses were performed for a sensitivity analysis in terms of different grouting range, rock class, shotcrete thickness, coefficient of lateral earth pressure, grouting thickness, and pumping existence for the rock classes I, III, and V. FLAC-2D ver. 5.0 was used for the numerical analyses. It was came to the conclusion that the effect of the increased water pressure due to the water barrier of the grouting should be considered as well as the strength improved effect in designing grouting reinforcement of subsea tunnels.

The Method of Tunnel Blasting for the Vibration Control by Deck Charge and Multiple Cut (다단장약에 의한 V-cut 발파공법의 진동제어효과와 발파효율증대에 관한 연구)

  • 두준기;양형식;김형건;김용국
    • Explosives and Blasting
    • /
    • v.21 no.3
    • /
    • pp.1-10
    • /
    • 2003
  • 터널굴착발파공법의 하나인 V-cut발파공법은 터널굴착기술이 발전되는 과정에서 초기에 개발되어진 기술이나 작업의 간편성과 효율성으로 인하여 많은 터널굴착공사에서 이용되고 있는 발파공법이다. V-cut발파공법은 일자유면 상태에서 V형으로 심발공을 발파하고 심발공에 의해 형성된 자유면을 이용하여 확대공으로 굴착공간을 넓히는 발파 방법이며 심발발파의 굴진장에 의해 단일발파당 굴진장이 결정된다. V-cut발파법이 개발된 이래 V-cut발파의 굴진장을 증대시키기 위한 방법으로 심발발파공의 구속저항을 감소시키기 위해 보조심발공을 발파하여 형성된 자유면에 의해 심발공의 최소저항선거리를 줄여 발파하였으나 심발공의 구속저항이 감소되지 않아 발파효율이 증대되지 않았으며 발파진동 또한 가장 크게 발생하였다. 이와 같은 현상은 최소저항선거리의 감소효과에 대한 발파기술상의 이론에 문제가 있기 때문이다. 본 연구에서는 V-cut발파법의 심발공에 대한 구속저항감소효과가 발현될 수 있는 조건들을 검토하여 최소저항선거리의 감소효과가 발현될 수 있는 조건을 제시 하여 심발공의 발파효율을 증대시키고 발파진동이 적어지는 발파방법을 제안하려 한다.

Development of Inspection and Diagnosis System for Safety and Maintenance in Tunnel (터널 유지관리를 위한 안전진단시스템 개발에 관한 연구)

  • Kim, Young-Geun;Baek, Ki-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.1
    • /
    • pp.37-50
    • /
    • 2001
  • Recently, as tunnel structure is getting old, many deformations and defects have been occurred. As tunnel has the characteristics of underground structure, the estimation of the cause of deformation is very difficult. Then, it is necessary to investigate the state of tunnel lining and to estimate the deformation cause and safety for tunnel. In this study, inspection and diagnosis system for effective maintenance in tunnel was researched. Firstly, non-destructive techniques such as GPR (ground penetrating radar), impact echo test, and infrared thermal techniques were applied to tunnel lining inspection. Tunnel lining analysis system was developed to analyze the stability of tunnel. And, tunnel soundness evaluation system was developed to find the probable causes and indicate the method for repair and reinforcement for tunnel.

  • PDF

The ubiquitous information technology based tunnel safety monitoring system (uIT 기반의 터널 안전관리 모니터링시스템 구축)

  • Kim, Do-Hyoung
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.260-265
    • /
    • 2007
  • 제2만덕터널은 부산시민의 생활에 반드시 필수적인 장소로 하루 10만대의 차량이 이용하는 곳이지만 터널의 노후화와 안전시설의 미비로 사고발생시 인명피해는 물론 경제적 손실 발생 가능성이 큰 터널 시설물이다. 제2만덕터널은 2005년 7윌부터 2006년 9월까지 교통사고 56건, 고장사고 44건, 화재 2건, 기타 11건의 사고가 발생한 곳으로 관리사무소 전담요원 7명이 3교대로 근무하고 있으며 CCTV 15대만으로 사고를 대비하고 있다. 터널의 중요성을 고려할 때 노후화된 터널이지만 유비쿼터스 기술 및 구조물 계측기술을 적용한 안전관리 시스템이 필요하다. 제2만덕터널은 1985년에 준공되어 현재와 같은 보다 체계적인 터널 안전 관리 기술이 적용되리 많은 터널로 USN기반 구조물, 노면, 화재, 공기, 조명센서를 이용한 실시간 모니터링과 돌발적인 교통사고 발생 시에 신속한 복구 처리를 위하여 유관기관과 연계된 긴급 지원 시스템의 구축의 좋은 모델이 될 것이다. 부산광역시에는 총 17개 터널이 있으며 그 중 11곳이 90년 이전에 구축된 것으로 본사업으로 노후화 터널의 유비쿼터스 기반의 안전관리 시스템이 개발된다면 부산을 중심으로 전국에 산재한 노후화 터널의 안전 관리 개선에 미치는 파급효과가 클 것이며 유비쿼터스 기술의 대표적 적용 사례가 될 것이다.

  • PDF