• Title/Summary/Keyword: 터널 발파

Search Result 472, Processing Time 0.029 seconds

Environmental Effects and Characteristics of Ground Vibration Caused by Tunnel Blasting in the Vicinity of an Apartment (터널 발파로 인한 아파트 인근지역에서의 지반진동 전파특성 및 영향 평가 연구)

  • 최병희;류창하;백승규
    • Explosives and Blasting
    • /
    • v.22 no.1
    • /
    • pp.57-65
    • /
    • 2004
  • Explosive blasting in tunnel excavation produces ground vibration and air blast as its side effects, which may cause complaints from nearby residents. This study was intended to investigate the propagation characteristics of ground vibration induced by tunnel blasting and to evaluate its effects on the residential structures near the site. We have conducted field measurements for 6 blasts and acquired vibration data from 70 measuring points, some of which on positioned inside the tunnel for comparative reason. Various documentation was reviewed to determine an allowable level of peak particle velocity for the residential structures in the area and the allowable limit was set to 0.5 cm/sec. Propagation equations for peak particle velocities were derived from regression analyses using the data acquired at both the surface and the underground tunnel. Finally we proposed appropriate predictive equations for the two areas and a safe blasting criterion.

A Study on the Determination of Suitable Specific Charge in Tunnel Blasting Design (터널발파설계에서 적정장약량산정에 관한 연구)

  • Jeong, Dong-Ho;Kim, Seon-Hong;Bae, Hyo-Jin;Seok, Jin-Ho;Choo, Yong-Beom
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.1
    • /
    • pp.21-26
    • /
    • 2001
  • Till now a lot of studies has been performed to increase the efficiency of tunnel blasting. Nevertheless there are still uncertainties of input parameter to determine the specific charge. In order to solve this problem, the rock types and the charges of 17 road tunnel sites were analyzed. As a result of these analyses an empirical formula depending on rock type and charge was developed. Through this formula rational tunnel blasting will be designed by quantitative method rather than by assumption.

  • PDF

A Study on the Behavior of an Existing Tunnel and the Safety Implications on its Facilities from a New Tunnel Blasting (신설 터널 발파 시 기존 터널 거동 및 시설물 안전에 관한 연구)

  • Kim, Sung Hoon;Cho, Woncheol
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.2
    • /
    • pp.57-64
    • /
    • 2010
  • In this study, the behavior and safety of an existing tunnel and its facilities are investigated when a new tunnel adjacent to the existing tunnel is blasted. The design of the new tunnel puts priority on stability of the tunnel itself over the safety of the facilities which are installed within the existing tunnel such as jet fans. And thus, a detailed consideration on securing the safety of the existing facilities has been insufficient. An analysis on the types of traffic accidents in the last ten years shows that most incidents were due to the driver's improper response in emergency situations and unexpected obstacles. In consideration of this analysis, the safety of the facilities in the existing tunnel was secured by minimizing the charging amount for each hangfire and changing the excavation method of evacuation communication shelters to the large center hole cut blasting method to reduce blasting vibration. For a more quantitative analysis, measurement devices were installed inside the existing tunnel, at houses adjacent to the new tunnel, near jet fans in the existing tunnel. This enabled real time measurement of displacements of the existing tunnel, adjacent houses, and jet fans without interrupting traffic flow. Therefore, the improvements of charging amount for each hangfire, the blasting method, and the measurement method are suggested in this paper to secure the safety of the facilities in the existing tunnel when a new tunnel, located on a large city and adjacent to an existing tunnel, is designed.

  • PDF

Decreasing Effects of Vibration by Drill and VBast Method with Bi-directions using TBM Pilot Tunnels (파이롯트 터널을 이용한 이방향 천공 발파공법의 진동 저감효과)

  • 이찬우;유진오;이경원;배규진
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1995.04a
    • /
    • pp.22-27
    • /
    • 1995
  • 본 연구로부터 얻어진 결론은 다음과 같다. 1. 본 연구에서는 TBM에 의한 파이롯트 터널의 효율성을 극대화한 이방향 천공 발파공법을 개발, 현장실험을 통하여 그 효용성을 입증하였다. 2. NATM 공법에 의한 발파보다 TBM을 이용하여 파이롯트 터널을 굴착하여 확대발파할 경우 상당한 지반진동 경감효과를 얻을 수 있을 것으로 판단된다. 3. 이방향 천공 발파공법의 현장시험 결과, 측정된 지반 진동치는 20% 이상의 진동 경감효과가 있는 것으로 분석되었다. 4. 기존공법과 신공법의 상대비교를 위한 수치해석 결과, 신공법의 방사상 방향 발파는 기존공법의 종방향 발파에 비하여 관심의 대상이 되는 발파공 직상부에서 진동치가 크게 경감되었다.

  • PDF

Electronic Blasting for Excavating Single Line Railway Tunnel Close to Residential Area (보안물건이 근접한 소단면 철도 단선터널 굴착시 전자발파 시공사례)

  • Lee, Min Su;Kim, Hee Do
    • Explosives and Blasting
    • /
    • v.34 no.3
    • /
    • pp.17-20
    • /
    • 2016
  • This paper introduce a multistage parallel non-vibration electronic tunnel blasting cases which adapts Electronic Blasting System(EBS) and the center-cut blasting method to excavating a single line railway tunnel close to residential area. As a result, it was revealed that the vibration and noise showed a reduction of 23.5% and 75% of compared with the allowable standard. We successfully completed the tunnel excavation with decreasing construction time and construction cost and without civil compliant.

A Case Study on the Construction of Concrete Structures in Parallel with Tunnel Blasting (터널발파-구조물 병행시공을 위한 영향평가 연구)

  • 류창하;최병희;김양균;유정훈
    • Explosives and Blasting
    • /
    • v.21 no.4
    • /
    • pp.11-21
    • /
    • 2003
  • An experimental study was carried out in order to reduce the period and cost of construction of Missiryung tunnel, which is a relatively long one 3.6 km long. An allowable vibration level for curing concrete was established based on the extensive case studies done over the world. and assessment was performed on the possibility of constructing concrete structures like lining during tunnel blasting. Attenuation relationships were obtained by processing more than 130 measurement data from a series of tunnel blasting in the site. A Guideline for safe construction work was suggested. To verification, low small concrete blocks with a constant standoff distance were installed in the floor of the tunnel After the blocks were exposed to blast vibrations for 28 days, compressive strength tests were performed on 20 specimens taken from the blocks. It was shown that the suggested guideline was appropriate for the safe construction work at the site.

Numerical Analysis of Concrete Lining and Rockbolt Behavior of the Tunnel Associated with Blast-induced Vibration (발파진동으로 인한 터널 콘크리트 라이닝과 록볼트 거동의 수치해석적 분석)

  • Jeon, Sang-Soo;Jang, Yang-Won
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.5
    • /
    • pp.69-78
    • /
    • 2009
  • Since the blast vibration induced by explosives of the powder possibly provide damage of the nearby structures adjacent to the tunnel, the stability of the nearby structures should be estimated. In this study, the stability of the tunnel based on the allowable peak particle velocity of the structures as well as allowable stress of the structures presented in the concrete structural design standard was estimated with respect to the stress of the concrete lining and axial force of the rockbolt during the blasting operation at the ground surface of the pre-existing tunnel. The analyses were carried out by using $FLAC^{2D}$ which is one of the programs developed based on the finite difference method. The bending compressive stress and shear stress of the concrete lining and axial force of the rockbolt were rapidly increased when the blasting operation was conducted near the tunnel.

절리특성을 고려한 터널 발파 설계

  • 임경호;김치환;남기천;박성록;이성규
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2001.03a
    • /
    • pp.85-94
    • /
    • 2001
  • 터널 발파시 발파효율은 암반의 특성에 큰 영향을 받기 때문에 암반 특성을 분석하고 이를 기초로 발파설계를 수행하는 것이 중요하다. 그럼에도 불구하고 현재까지 국내에서의 발파설계는 무결암의 단축압축강도만으로 발파암을 분류한 후 각 발파암의 발파계수를 구하는 방법을 이용하거나 공학적 암반분류법의 하나인 RMR 분류를 이용하여 발파암을 분류하되 객관적 근거가 미약한 경험적인 발파계수를 산정 하는 방식을 통하여 이루어졌다. 본 연구에서는 절리특성을 고려한 발파설계를 위하여 Ashby의 접근법을 활용하였다. 또한 절리조사 결과를 통한 발파암 분류방법과 발파패턴설계를 추가하여 발파설계 전 과정을 수행할 수 있도록 Ashby의 접근법을 응용하였다. 따라서 절리 분포 특성을 고려한 발파암 분류가 가능하고, 절리암반 특성을 고려한 발파설계를 수행할 수 있을 것으로 기대된다.

  • PDF

A Study on the Design of PLHBM (선대구경 수평보링 발파공법(PLHBM)의 설계 연구)

  • Beak, Jong-Hyun;Beak, Sang-Hyun;Han, Dong-Hun;Won, Ah-Ram;Kim, Chang-Seop
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.66-76
    • /
    • 2012
  • Blasting technology aims to maximize digging efficiency as well as minimize vibration and noise. So, it is key point of blasting technology to raise blasting effect as much as possible and reduce vibration and noise and the design of PLHBM that is the tunnel blasting method having such merit was studied in this paper. PLHBM has the excellent blasting efficiency as it drills the empty hole with high caliber of 250~1,000mm at centre cut, contributes to blasting vibration reduction effect much and can be usefully applied to tunnel blasting sites. So it is judged that it enables the development of tunnel blasting method to be advanced one more step by studying and suggesting the design method of PLHBM.