• Title/Summary/Keyword: 터널 굴착면 전방

Search Result 43, Processing Time 0.029 seconds

Predicting ground condition ahead of tunnel face utilizing electrical resistivity applicable to shield TBM (Shield TBM에 적용 가능한 전기비저항 기반 터널 굴착면 전방 예측기술)

  • Park, Jin-Ho;Lee, Kang-Hyun;Shin, Young-Jin;Kim, Jae-Young;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.6
    • /
    • pp.599-614
    • /
    • 2014
  • When tunnelling with TBM (Tunnel Boring Machine), accessibility to tunnel face is very limited because tunnel face is mostly occupied by a bunch of machines. Existing techniques that can predict ground condition ahead of TBM tunnel are extremely limited. In this study, the TBM Resistivity Prediction (TRP) system has been developed for predicting anomalous zone ahead of tunnel face utilizing electrical resistivity. The applicability and prediction accuracy of the developed system has been verified by performing field tests at subway tunnel construction site in which an EPB (Earth Pressure Balanced) shield TBM was used for tunnelling work. The TRP system is able to predicts the location, thickness and electrical properties of anomalous zone by performing inverse analysis using measured resistivity of the ground. To make field tests possible, an apparatus was devised to attach electrode to tunnel face through the chamber. The electrode can be advanced from the chamber to the tunnel face to fully touch the ground in front of the tunnel face. In the 1st field test, none of the anomalous zone was predicted, because the rock around the tunnel face has the same resistivity and permittivity with the rock ahead of tunnel face. In the 2nd field test, 5 m thick anomalous zone was predicted with lower permittivity than that of the rock around the tunnel face. The test results match well with the ground condition predicted, respectively, from geophysical exploration, or directly obtained either from drilling boreholes or from daily observed muck condition.

Development and Application of Large-diameter Cut-hole Exploration System for Assessment of the Geological Condition beyond NATM Tunnel Face (NATM 터널의 굴착면 전방 지질 평가를 위한 대구경 심발공 탐사 시스템 개발 및 적용 사례)

  • Kim, Minseong;Jung, Jinhyeok;Lee, Jekyum;Park, Minsun;Bak, Jeonghyeon;Lee, Sean Seungwon
    • Tunnel and Underground Space
    • /
    • v.31 no.1
    • /
    • pp.1-9
    • /
    • 2021
  • Recently, the development of underground space has been accelerated with rapid urbanization, and it is significantly important for safe construction to accurately understand the geological conditions of the section when excavating rocks. In this paper, a boring alignment tracking and geological exploration system have been developed to identify the geological conditions beyond the excavation face by utilizing a MSP method that bores a large empty hole to reduce blast-induced vibration. The major advantage of the proposed exploration system is that we can obtain the ground condition of 50 m ahead of the excavation face through exploration along blast cut-holes drilled for the NATM tunnel construction. In addition, we introduce several case histories regarding the assessment of the geological conditions beyond the tunnel face by monitoring the inside of large empty holes using the proposed hole exploration system.

Study on Q-value prediction ahead of tunnel excavation face using recurrent neural network (순환인공신경망을 활용한 터널굴착면 전방 Q값 예측에 관한 연구)

  • Hong, Chang-Ho;Kim, Jin;Ryu, Hee-Hwan;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.3
    • /
    • pp.239-248
    • /
    • 2020
  • Exact rock classification helps suitable support patterns to be installed. Face mapping is usually conducted to classify the rock mass using RMR (Rock Mass Ration) or Q values. There have been several attempts to predict the grade of rock mass using mechanical data of jumbo drills or probe drills and photographs of excavation surfaces by using deep learning. However, they took long time, or had a limitation that it is impossible to grasp the rock grade in ahead of the tunnel surface. In this study, a method to predict the Q value ahead of excavation surface is developed using recurrent neural network (RNN) technique and it is compared with the Q values from face mapping for verification. Among Q values from over 4,600 tunnel faces, 70% of data was used for learning, and the rests were used for verification. Repeated learnings were performed in different number of learning and number of previous excavation surfaces utilized for learning. The coincidence between the predicted and actual Q values was compared with the root mean square error (RMSE). RMSE value from 600 times repeated learning with 2 prior excavation faces gives a lowest values. The results from this study can vary with the input data sets, the results can help to understand how the past ground conditions affect the future ground conditions and to predict the Q value ahead of the tunnel excavation face.

Forward probing utilizing electrical resistivity and induced polarization for predicting mixed-ground ahead of TBM tunnel face (전기비저항과 유도분극을 활용한 TBM 터널 굴착면 전방 복합지반 예측 기법)

  • Ryu, Jinwoo;Park, Jinho;Lee, Seong-Won;Lee, In-Mo;Kim, Byung-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.55-72
    • /
    • 2018
  • A method that can predict the mixed-ground condition ahead of a TBM tunnel face during tunnel construction utilizing electrical resistivity and induced polarization (IP) was proposed in this study. Effect of TBM advancement approaching the mixed-ground condition (composed of soil layer overlying rock layer) when currently running through soil zone on the electrical resistivity and IP measuring was assessed with laboratory-scale experiments. The resistivity and IP values were measured using four electrodes, by installing two electrodes on the tunnel face (at the cutterhead), and the other two electrodes on the segment lining. The test results showed that both of the measured resistivity and IP values were kept increasing as the TBM is approaching the soil-rock mixed-ground. Also, to get the more reliable results for predicting the mixed-ground condition, it was recommended that the measurement is made at the tunnel face utilizing 4-electrodes installed at the cutterhead as well as it is made utilizing the 2-electrodes installed at the segment lining along with the 2-electrodes installed on the tunnel face (at the cutterhead) so that two measured results are compared each other.

Numerical simulation study on applicability of electrical resistivity survey at tunnel face (터널 굴착면에서의 전기비저항 탐사 적용성에 관한 수치해석 연구)

  • Yi, Myeong-Jong;Kim, Nag-Young;Lee, Sangrae;Hwang, Bumsik;Ha, Myung Jin;Kim, Ki-Seog;Cho, In-Ky;Lee, Kang-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.3
    • /
    • pp.279-292
    • /
    • 2022
  • Unexpected anomalies in the geotechnical investigation at design stage may cause problems during tunnel excavation. Therefore, it is important to predict the ground condition ahead of a tunnel face during tunnel excavation in order to prevent tunnel collapse. Despite the fulfillment of an electrical resistivity survey at the tunnel face, the existing electrical resistivity survey program can produce distorted results by the limitation of tunnel modelling. In this background, this study develops a modelling program for an electrical resistivity survey considering the tunnel shape. Numerical simulation and inverse calculation were performed for the electrical resistivity survey in the tunnel using the developed program. As a result, it was proved that the developed program could predict accurately the anomalous object's location and condition ahead of the tunnel face.

Prediction of Change in Ground Condition Ahead of Tunnel Face Using Three-dimensional Convergence Analysis (터널 3차원 내공변위의 해석을 통한 막장전방 지반상태변화 예측)

  • 김기선;김영섭;유광호;박연준;이대혁
    • Tunnel and Underground Space
    • /
    • v.13 no.6
    • /
    • pp.476-485
    • /
    • 2003
  • The purpose of this study is to present an analysis method for the prediction of the change of ground conditions. To this end, three-dimensional convergence displacements is analyzed in several ways to estimate the trend of displacement change. Three-dimensional arching effect is occurred around the unsupported excavation surface including tunnel face when a tunnel is excavated in a stable rock mass. If the ground condition ahead of tunnel face changes or a weak fracture zone exists a specific trend of displacement change is known to be occurred from the results of the existing researches. The existence of a discontinuity, whose change in front of the tunnel face, can be predicted from the ratio of L/C (longitudinal displacement at crown divided by settlement at crown) etc. Therefore, the change of ground condition and the existence of a fracture zone ahead of tunnel face can be predicted by monitoring three-dimensional absolute displacements during excavation, and applying the methodology presented in this study.

Utilization of induced polarization for predicting ground condition ahead of tunnel face in subsea tunnelling: laboratory test (유도분극을 활용한 해저터널 굴착면 전방 지반상태 예측: 실내실험)

  • Park, Jinho;Lee, Kang-Hyun;Lee, Seong-Won;Ryu, Young-Moo;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.383-392
    • /
    • 2015
  • In subsea tunnelling, prediction of the fractured zone (or water bearing zone) ahead of tunnel face saturated by seawater with high water pressure has been a key factor for safe construction. This study verified the feasibility of utilizing induced polarization (IP) survey at tunnel face for predicting the ground condition ahead of the subsea tunnel face. A pore model was proposed to compute chargeability in granular material, and the relationship correlating chargeability with the variables affecting the chargeability was derived from the model. Parametric study has been performed on the variables to figure out the most influential factors affecting the chargeability. The results of the parametric study show that the size of narrow pores ($r_1$) and the salinity of pore water are the most influential factors on chargeability. Laboratory tests were conducted on various types of ground condition by changing the salinity of pore water, the thickness of the fracture zone and the existence of gouge (weathered granite) within the joints of the fractured zone to figure out the effect of the ground characteristics on the IP phenomenon. Test results show that the chargeability of the fractured zone saturated by seawater increases if the joints in the fractured zone are filled with gouge since the infilled gouge will decrease the size of narrow pores ($r_1$).

An Experimental Study on the Two Dimensional Behaviors due to Excavation of Crossed Tunnel below existing tunnel (기존터널 하부에 교차하여 굴착되는 터널의 2차원 거동 특성에 대한 실험적 연구)

  • Hong, Suk-Bong;Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.119-131
    • /
    • 2005
  • The two dimensional behaviors of the existing upper tunnel and the ground at crossed area due to the excavation of a lower tunnel were studied experimentally, The model tests were conducted by changing the relative location of the existing upper tunnel and the lower tunnel. The results of the study show that a vertical earth pressure outside the loosened area was increased due to longitudinal arching effect same as a single tunnel. In case vertical distance between the upper and lower tunnel is 0.7 H and 1.0 H respectively (H is a height of the lower tunnel), vertical earth pressure increased in the loosened area behind the tunnel face. But when a vertical distance is 1, 3 H, ground behaviors appeared similarly to a single tunnel.

  • PDF

A study on analysis method for the prediction of changes in ground condition ahead of the tunnel face (터널 막장 전방의 지반 변화 예측을 위한 해석기법에 관한 연구)

  • Kim, Young-Sub;Kim, Chan-Dong;Jung, Yong-Chan;Lee, Jae-Sung;You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.1
    • /
    • pp.71-83
    • /
    • 2004
  • The purpose of this study is to present an analysis method for the prediction of the changes m ground conditions. To this end, three dimensional convergence displacements are analyzed in several ways to estimate the trend of displacement changes. Three-dimensional arching effect is occurred around the unsupported excavation surface including tunnel face when a tunnel is excavated in a stable rock mass. If the ground condition ahead of tunnel face changes or a weak zone exists, a diagnostic trend of displacement change is observed by the 3 dimensional measurement and numerical analysis. Therefore, the change of ground condition and the existence of a weak zone ahead of tunnel face can be predicted by monitoring 3-dimensional absolute displacements during excavation, and applying the methodology (the ratio of L/C, $C/C_o$, etc.) presented in this study.

  • PDF

Prediction of Rock Mass Strength Ahead of Tunnel Face Using Hydraulic Drilling Data (천공데이터를 이용한 터널 굴진면 전방 암반강도 예측)

  • Kim, Kwang-Yeom;Kim, Sung-Kwon;Kim, Chang-Yong;Kim, Kwang-Sik
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.479-489
    • /
    • 2009
  • Appropriate investigation of ground condition near excavation face in tunnelling is an inevitable process for safe and economical construction. In this study mechanical parameters from drilling process for blasting were investigated for the purpose of predicting the ground condition, especially rock mass strength, ahead of tunnel face. Rock mass strength is one of the most important factors for classification of rock mass and making a decision of support type in underground construction. Several rock specimens which are considered homogeneous and having different strength values respectively were tested by hydraulic drill machines generally used. As a result, penetration rate is fairly related with rock mass strength among drilling parameters. It is also found that penetration rate increases along with the higher impact pressure even under same rock strength condition. It is finally suggested that new prediction method for rock mass strength using percussive pressure and penetration rate during drilling work can be utilized well in construction site.